ERP Fit-Gap Scoring Worksheet
A fit-gap analysis turns a long wish list into a number you can compare across candidate ERPs and use for effort estimates. This worksheet gives each requirement a weight and a fit score and calculates a weighted fit percentage.
| Requirement | Area | Weight (1-5) | Fit score (0-3) | Weighted score | Maximum | Custom effort (days) | Comment | |
|---|---|---|---|---|---|---|---|---|
15 | 15 | |||||||
8 | 12 | |||||||
4 | 12 | |||||||
15 | 15 | |||||||
3 | 9 | |||||||
8 | 12 | |||||||
12 | 12 |
Make one copy of this worksheet per candidate system. Score each requirement with the same definitions, and ask the vendor to demonstrate every item scored 3 with your own data.
Optional fit-gap review
Send us your requirement list and we will point out missing areas such as traceability, intercompany or e-invoicing. No obligation.
Optional. The tool and every export work without this. No spam.
How to use it
List requirements as short, testable statements, one per row, and assign an area. Give each a weight from 1 to 5 by business criticality. After a scripted demo, score each as 3 for standard function, 2 for configuration, 1 for customisation or add-on, and 0 for gap or workaround. Enter estimated custom days for score 1 items. Export one file per vendor.
- Write requirements so they can be demonstrated
- Agree weights before scoring vendors
- Have two people score independently
- Record evidence in the comment column
How the percentage works
Each row contributes weight times fit to the weighted score and weight times 3 to the maximum. The weighted fit is the sum of weighted scores divided by the sum of maxima. A 100 percent result means every requirement is met by standard functions. Because high-weight items count more, a gap on a critical requirement lowers the result much more than a gap on a nice-to-have.
Reading the result
Use the percentage together with the total custom days. Two vendors at 82 percent are not equal if one needs 15 custom days and the other 90. Sort the rows by weight and check that every weight-5 item scores at least 2. Pass the custom days to the implementation effort estimator and the TCO calculator to see what the gaps cost.
Common mistakes
The usual errors are scoring from brochures instead of demonstrations, writing vague requirements such as good reporting, and giving everything a weight of 5. Also avoid mixing scores from vendors who were given different scenarios. Mid-market vendors differ strongly by industry depth, so include your sector-specific items, for example regulated traceability or variant configuration.
Frequently Asked Questions
How many requirements should I list?
Between 60 and 150 is typical for a mid-market selection. Fewer than 40 hides differences, while more than 200 makes scoring slow and inconsistent.
What score is good enough?
There is no universal threshold. Many teams look for above 80 percent weighted fit with no critical item below 2. Judge the result with custom effort and vendor references.
Can I add vendor columns?
Keep one worksheet per vendor for clean scoring and export each to Excel. Then paste the weighted fit results into a comparison sheet.
Does it replace a demo?
No. Scores should come from scripted demos with your data. The worksheet records and aggregates the outcome.
Netray can help turn your fit-gap results into a testable demo script and, where gaps remain, scope read-only add-ons or reporting layers outside the ERP core.
Related Tools
EU Mid-Market ERP 5-Year TCO Calculator
Compare a mid-market ERP quote on a like-for-like five-year basis: subscription with annual uplift, implementation services, infrastructure and internal project staff.
ERP Migration & SelectionERP Implementation Effort Estimator (Consulting Days)
Estimate consulting days, cost and calendar duration for a mid-market ERP rollout from modules, sites, integrations and the share of requirements needing customisation.
ERP Migration & SelectionERP Named vs Concurrent User Licence Calculator
Compare the annual cost of named full and limited users with a concurrent licence pool and see the break-even concurrency level.
ERP Migration & SelectionERP Steering Committee Status Report Template
Fill-in status report for ERP projects covering RAG status, budget, milestones, top risks and decisions needed, ready to export as a one-page PDF or Word file.
More ERP Migration & Selection tools
See all- ERP Localization Gap Register Worksheet
- ERP TCO Comparison Calculator (5-Year)
- ERP Migration Risk Assessment
- Data Migration Effort Calculator
- ERP Selection Scorecard for Manufacturers
- ERP Go-Live Readiness Checklist
- ERP Change Management Readiness Assessment
- ERP Integration Complexity Calculator
- Cloud vs On-Premise ERP Cost Calculator
Keep exploring
Free tools
- ERP Fit-Gap Analysis WorksheetScore each requirement against a candidate ERP, classify the gap resolution and get a weighted fit percentage you can defend in a steering meeting.
- Infor M3 Fit-Gap Analysis WorksheetEditable worksheet to classify each requirement as fit, configure, extend or gap, with effort and cost per line and totals by the end.
- SAP MM Fit-Gap Analysis Template with ExamplesAn editable SAP MM fit-gap worksheet with realistic example rows, resolution options and effort totals.
Guides
- ERP RFP Template for Discrete Manufacturers: Structure, Scoring, and ScriptsA complete ERP RFP template for discrete manufacturing: requirements matrix, CMMC and ITAR questions, weighted scoring model, and vendor demo scripts.
- ERP Requirements Gathering MethodologyMaster ERP requirements gathering with proven techniques including process mapping, MoSCoW prioritization, and fit-gap analysis. Avoid costly scope gaps.
- SyteLine Supplier Quality Management Configuration GuideConfigure SyteLine supplier quality management for vendor quality scoring, incoming inspection tracking, and supplier corrective actions in CloudSuite Industrial.