ERP User Acceptance Test (UAT) Script Template
User acceptance testing proves that the business can run its real processes in the new ERP. A script gives every tester the same steps, expected results and a place to record what actually happened, which is what turns opinions into evidence at sign-off.
Fill in
ERP User Acceptance Test Script Template
UAT Script
Project: ERP Replacement Programme Scenario: UAT-PRD-004 Make to order with subcontract operation Tester: M. Schmidt Date: 2026-11-24 Environment: Quality
Preconditions and test data
Item FG-2210 with released BOM and routing. Customer 100245 active with credit limit set. Subcontractor 300118 with approved status.
Test steps
| Step | Action | Expected result | Actual result | Pass / Fail | Defect ref |
|---|---|---|---|---|---|
| 1 | Enter sales order for 40 pcs of FG-2210 | Order saved, price and delivery date proposed | |||
| 2 | Run planning for the item | Planned production order and subcontract purchase request created | |||
| 3 | Release production order | Operations and material reservations visible | |||
| 4 | Receive subcontract goods | Stock posted, subcontract cost allocated | |||
| 5 | Post production completion | Finished goods in stock, WIP cleared | |||
| 6 | Ship and invoice | Delivery note and invoice produced, VAT correct |
Defects found
| Ref | Description | Severity | Owner | Status |
|---|---|---|---|---|
| D1 | ||||
| D2 |
Outcome
Overall result: Passed with defects
Sign-off
A starting-point script. Replace the example steps with your own process and use one script per scenario so results can be tracked separately.
Draft UAT scripts from your process documents
We can help convert your process maps into a first set of test scripts.
Optional. The tool and every export work without this. No spam.
How to use the script
Write one script per end-to-end scenario, for example quote to cash, procure to pay, make to stock, subcontracting or period close. Set the preconditions and test data first, since most failed tests in UAT are caused by missing data rather than defects. Testers run each step, record the actual result, mark pass or fail and raise a defect reference for failures. The process owner signs after reviewing the open defects.
- Use realistic data from the migrated set, not made-up records
- Test with the actual end users, not only the project team
- Log every failure with a reference, even small ones
- Retest fixed defects in the same script version
Scenarios for a manufacturing ERP
At least cover sales order entry with pricing and credit check, material planning and purchase proposals, production order release and backflushing, subcontracting, goods receipt with incoming inspection, shipping with documents, invoicing with correct VAT treatment, intercompany if relevant and month-end close. Include negative paths such as a rejected lot or an order change after release, because these expose real gaps.
Defect severity and exit criteria
Agree severity levels before testing starts. A common scheme is critical for no workaround, high for a workaround that is not acceptable at volume, medium for an acceptable workaround and low for cosmetic issues. Typical exit criteria are no open critical or high defects, a pass rate above an agreed threshold on must-have scenarios and sign-off from each process owner.
Common mistakes
Testing too late leaves no time to fix findings. Using the consultant as tester hides usability problems that users will meet on day one. Another trap is running a happy-path only test. Finally, do not close defects verbally; track every defect to a retest and a recorded result.
Frequently Asked Questions
How many UAT scenarios does a mid-size plant need?
A typical single-plant project ends up with 25 to 60 scenarios across sales, purchasing, planning, production, inventory, quality and finance. Multi-entity or highly regulated environments need more. The test of coverage is whether every critical business process has at least one scenario.
Who should execute the UAT scripts?
The business users who will do the work after go-live, supported by key users who know the new system. Consultants should observe and help but not drive. Their presence changes what gets noticed.
Is UAT the same as system integration testing?
No. Integration testing checks that the systems and interfaces work technically. UAT checks that the process works for the business with its own data and roles. Both are needed, and UAT should start only after integration testing is stable.
What if a defect cannot be fixed before go-live?
Record an agreed workaround, an owner and a target fix date, and obtain explicit acceptance from the process owner. It becomes a known issue in the go-live decision, not a surprise on the first day.
If you want help turning your process descriptions into scripts for your ERP, we can draft a first set for your team to correct. Optional.
Related Tools
ERP Cutover Plan Worksheet
Hour-by-hour go-live cutover task list with owners, durations, dependencies and rollback checkpoints, ready to run a weekend cutover.
ERP Migration & SelectionERP Data Migration Mapping Worksheet
Editable source-to-target field mapping sheet for moving a legacy ERP into abas, proALPHA, IFS, Exact or any other target. Tracks rules, owners and sign-off.
ERP OperationsERP Project Steering Committee Report Template
A one-to-two page monthly steering report for ERP implementations with RAG status, milestones, budget burn, risks and decisions required.