Foundry Charge Makeup and Cost Worksheet
Charge makeup sets the cost and the starting chemistry of every melt. This worksheet lets you try returns, pig iron, scrap and additions and see cost per kg and carbon content before you load the furnace.
| Charge material | Type | Weight (kg) | Cost per kg | Extended cost | Carbon content (percent) | Carbon added | |
|---|---|---|---|---|---|---|---|
$432 | 86.4 | ||||||
$864 | 50.4 | ||||||
$680 | 4 | ||||||
$66 | 58.8 | ||||||
$91 | 0.055 |
Charge carbon is before melting losses and pickup. Real carbon in the bath depends on practice, so use this to compare mixes, then confirm with a spectrometer sample. Costs per kg are examples.
Compare planned and actual charge cost
Optional: a short review of how material consumption could be compared with plan from ERP data.
Optional. The tool and every export work without this. No spam.
How to use this worksheet
Replace the sample rows with the materials you actually stock. Enter weight and cost per kg for each, and the carbon percent. The sheet totals weight and cost, then shows cost per kg and the carbon content of the mix. Change the proportion of returns against purchased material to see how the cost moves. Export to Excel to keep a library of standard charges per alloy.
The method
Cost per kg is total extended cost divided by total weight. Carbon contribution is the sum of weight times carbon percent for each material, divided by total weight. This is a simple weighted average. It ignores melt loss, oxidation of silicon and manganese, and carbon pickup or burn off, so treat it as a planning figure and confirm with the furnace sample.
Returns and cost
Returns from gates, risers and scrapped castings are the cheapest metal in the building, but a high share can accumulate trace elements and gas. Many foundries limit returns in critical grades such as ductile iron. Compare a high returns mix to a high pig iron mix on cost and on risk to nodularity and chemistry control.
Common mistakes
Do not forget to include ferroalloys and carburizer, which add cost out of proportion to weight. Do not use stale prices. Do not compare charges at the same cost per kg without comparing yield, since a cheap charge with high loss may cost more per good casting.
Frequently Asked Questions
Does this account for melt loss?
No. It shows the charge as loaded. Apply your melt loss percentage separately, or use it to compare the relative cost of mixes before applying the same loss to each.
Can I use it for aluminum or steel?
The cost math works for any alloy. The carbon column is aimed at iron and steel. For other metals, relabel the column to a key element or ignore it.
What carbon values should I use?
Use the certificate value for pig iron and carburizer, and your typical analysis for returns. The sample numbers are illustrative only.
How do I store standard charges?
Export to Excel and keep one sheet per alloy and furnace, updating prices monthly.
If material costs and lots live in an ERP, Netray can help compare planned charges against actual consumption privately on your servers.
Related Tools
Foundry Heat and Melt Record Template
A fill-in melt record that ties one heat number to its charge, spectrometer results, tap and pour data and the castings poured from it.
Quality & InspectionCasting Scrap by Defect Pareto Worksheet
Record scrap by defect type with quantity and unit cost, and see the cost and average value per scrapped casting.
Industry TemplatesFoundry Pour and Mold Log Worksheet
Track every mold poured by heat, pattern, temperature, time and weights, and see casting yield per mold and in total.
Discrete ManufacturingForging Billet Weight and Yield Calculator
Work out the billet weight needed for a forged part given flash, scale and butt losses, then see yield and net material cost per piece.
More Costing & Finance tools
See all- Foundry Melt Loss Calculator
- Casting Cost Per Piece and Quote Price Estimator
- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
- Distributor Customer Profitability Worksheet
- Distributor GMROI and Inventory Turns Calculator
Keep exploring
Free tools
- Foundry Furnace Charge Mix and Cost WorksheetBuild a furnace charge row by row and see total weight, cost per kg and the blended carbon and silicon before melt losses.
- Foundry Heat and Melt Record TemplateA fill-in melt record that ties one heat number to its charge, spectrometer results, tap and pour data and the castings poured from it.
- Casting Yield CalculatorCalculate casting yield from casting, gating and riser weights, then see the metal you must actually charge per good casting after scrap and melt loss.
Guides
- Foundry Heat and Lot Traceability for CastingsHow foundries trace castings back to heat, charge, pattern and process records, what customers and auditors ask for, and how to retrieve it in minutes.
- ERP for Foundries: Requirements That Actually MatterWhat a foundry ERP needs: heat and lot traceability, alloy and melt costing, pattern tracking, cleaning room routing, scrap by defect, and honest fit questions.
- Casting Yield and Scrap Cost: Getting Them Right in Your QuoteHow casting yield, melt loss and scrap rate feed cost per good part, and how to measure them from real production data so quotes stop under-pricing castings.