Foundry Furnace Charge Mix and Cost Worksheet
A charge sheet tells the melt crew what to load and tells the cost accountant what it costs. This worksheet keeps weight, price and the main chemistry contributions together so you can see cost per kilogram and the starting blend.
| Charge material | Weight (kg) | Cost per kg | Carbon (%) | Silicon (%) | Extended cost | Carbon in charge (kg) | Silicon in charge (kg) | |
|---|---|---|---|---|---|---|---|---|
$110 | 8.4 | 3 | ||||||
$110 | 17 | 11 | ||||||
$108 | 0.9 | 0.75 | ||||||
$13 | 0.008 | 6 | ||||||
$7 | 5.88 | 0 |
Compositions are typical examples, not specifications. Replace them with supplier certificates. The blend ignores melt loss and element recovery, so adjust for your furnace and verify with spectrometer samples before tapping.
Post charge cost to the ERP automatically
Optional: a short review of how charge sheets could feed heat-based costing in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add a row for each charge material, then enter the weight, the price per kilogram, and the carbon and silicon percentages from the supplier certificate or your own analysis. The sheet computes extended cost and the kilograms of carbon and silicon, and then totals the charge. Adjust the carburizer or ferrosilicon to bring the blend near the target before the first spectrometer sample.
- Update prices from your latest purchase orders.
- Use measured returns chemistry rather than nominal values.
- Save a version per alloy grade and export to Excel.
The method behind it
Blended percent for an element is the sum of element kilograms divided by total charge kilograms. Cost per kilogram is total cost divided by total weight. These are mass balances only. Real melts lose silicon and manganese to oxidation and recover carburizer at less than 100 percent, so many foundries use recovery factors per element and furnace type.
Reading the result and common mistakes
Compare the blended values against the grade specification before melting. If returns are a large share, small drift in their chemistry has a large effect, so test them. Steel scrap lowers cost but also lowers carbon, which then has to be made up with carburizer at a cost.
- Treating the blend as the final tap chemistry.
- Using book prices that do not include freight.
- Forgetting that rusty or oily scrap carries lower metal yield.
- Ignoring trace elements such as sulfur and phosphorus.
Frequently Asked Questions
Does this replace a charge calculation program?
No. It is a mass-balance sheet for cost and starting chemistry. Dedicated melt control systems also model element recovery, slag and furnace specifics. The worksheet is useful for quick comparisons and for documenting a standard charge.
Why is silicon different from the final analysis?
Silicon oxidizes and joins the slag during melting, so recovery is below 100 percent, especially in long holds or cupolas. Foundries apply a recovery factor from their own history. Use spectrometer results to calibrate.
Can I use this for steel or aluminum?
The structure works for any alloy, but change the columns you track. Steel foundries often track carbon, manganese and chromium, and aluminum foundries track silicon and magnesium. Edit the example rows with your own data.
How do I handle returns cost?
Many foundries cost returns at a transfer value near scrap or at remelt cost, since the metal was already paid for. Pick a method your cost accountant agrees to and keep it consistent so grade costs can be compared.
If charge records and heat chemistry live in spreadsheets, we can discuss tying them to your ERP item costs and lot traceability. The worksheet is free to use as is.
Related Tools
Foundry Heat and Pour Log Template
Fill in a one-page heat record covering alloy, furnace, temperatures, chemistry checks, treatment, molds poured and approvals, then export it.
Industry TemplatesChvorinov Rule Solidification Time and Riser Sizing Calculator
Enter casting volume, cooling surface area and mold constant to get modulus, solidification time and a first-pass riser diameter and height.
Industry TemplatesCasting Gating System Choke Area and Pour Time Calculator
Calculate choke area, sprue diameter, runner and ingate areas from poured weight, density, pour time, discharge coefficient and effective head.
Industry TemplatesForging Billet Weight and Flash Allowance Calculator
Work out billet weight, bar cut length and material utilization from finished forging volume, flash percentage, scale loss and shear loss.
More Industry Templates tools
See all- Upset Forging Stock Length, Strain and Final Diameter Calculator
- Foundry and Forge Process Control Maturity Assessment
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
- Sheet Metal Job Traveler Template
- Press Brake Setup Sheet Template
- Sheet Metal Cut List and Material Takeoff Worksheet
Keep exploring
Free tools
- Foundry Charge Makeup and Cost WorksheetPlan a charge from returns, pig iron, scrap and additions and see total weight, cost per kg and the carbon contribution of the mix.
- Foundry Heat and Melt Record TemplateA fill-in melt record that ties one heat number to its charge, spectrometer results, tap and pour data and the castings poured from it.
- Foundry Heat and Pour Log TemplateFill in a one-page heat record covering alloy, furnace, temperatures, chemistry checks, treatment, molds poured and approvals, then export it.
Guides
- Forging Press and Furnace Scheduling for US Forge ShopsHow forge shops schedule presses, furnaces and heat treat: die change sequencing, billet availability, batch loads, and where finite scheduling pays off.
- Forging Die Cost Amortization: How to Price Tooling Into a QuoteHow forge shops price die cost into quotes: amortize over committed quantity, build in rework and resink, and decide when the customer owns the tooling.
- Foundry Heat and Lot Traceability for CastingsHow foundries trace castings back to heat, charge, pattern and process records, what customers and auditors ask for, and how to retrieve it in minutes.