Foundry Pour and Mold Log Worksheet
The pour log connects each mold to a heat, a pattern and a result. It is where yield losses, cold pours and mold problems show up first. This worksheet calculates yield per mold and overall for you.
| Mold no | Heat number | Pattern | Pour temp (deg C) | Pour time (s) | Metal poured (kg) | Casting weight (kg) | Yield | Date | Shakeout result | |
|---|---|---|---|---|---|---|---|---|---|---|
63.5% | ||||||||||
63.5% | ||||||||||
61.1% | ||||||||||
61.1% |
Yield here is casting weight divided by metal poured, before scrap. Compare the lowest pour temperature with the misrun rows to see whether cold pours are the cause.
Tie pour data to ERP production orders
Optional: a short review of how pour and mold data could link to work orders and lots.
Optional. The tool and every export work without this. No spam.
How to use this worksheet
Add one row per mold. Enter the heat number, pattern, pour temperature and time, the total metal poured and the net weight of castings in the mold. Yield calculates per row and in total. Export to Excel or PDF at the end of the shift and file it with the heat records. Keep the mold number identical to the tag or marking on the flask.
Casting yield
Yield is net casting weight divided by the metal poured, which includes the gating system and risers. Typical yield varies widely by alloy and part geometry, with ductile iron often higher than steel, which needs larger risers. A fall in yield on a given pattern may point to oversized risers added after a defect, or to extra metal in the system. Pour time and temperature records help separate these causes.
Reading temperature and time
A misrun at the lowest pour temperature in the shift is a classic sign of metal that cooled in the ladle. Very short pour times on thin sections can cause turbulence and sand erosion, while long pour times invite cold laps. Keep records long enough to see patterns by ladle, by operator and by time of day.
Common mistakes
Do not estimate poured weight when a ladle scale is available. Do not leave the heat number blank when changing ladles. And do not close a mold as Good before shakeout, since defects often appear only when the casting is cleaned.
Frequently Asked Questions
Is yield the same as pour yield?
Here it is casting weight divided by metal poured. Some foundries define yield on tapped metal, which includes ladle skulls and spills. Pick one definition and use it consistently.
Can I log several castings per mold?
Yes. Enter the combined casting weight for the mold in one row, and list the patterns in the pattern field, or log one row per pattern if you prefer.
How is this different from the heat record?
The heat record covers the melt. The pour log covers the molds. Together they trace a casting from furnace to flask by the heat number.
What pour temperatures are typical?
It depends on alloy and section thickness. Ductile iron is often poured in the range of roughly 1350 to 1450 deg C. Use your own process specification as the limit.
If you want pour data tied to production orders and lots in your ERP, Netray can help connect them privately on your own servers.
Related Tools
Foundry Heat and Melt Record Template
A fill-in melt record that ties one heat number to its charge, spectrometer results, tap and pour data and the castings poured from it.
Quality & InspectionCasting Scrap by Defect Pareto Worksheet
Record scrap by defect type with quantity and unit cost, and see the cost and average value per scrapped casting.
Costing & FinanceFoundry Charge Makeup and Cost Worksheet
Plan a charge from returns, pig iron, scrap and additions and see total weight, cost per kg and the carbon contribution of the mix.
More Industry Templates tools
See all- Casting Yield Calculator
- Casting Shrinkage Allowance Reference Table
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
- Sheet Metal Job Traveler Template
- Press Brake Setup Sheet Template
- Sheet Metal Cut List and Material Takeoff Worksheet
Keep exploring
Free tools
- Foundry Heat and Pour Log TemplateFill in a one-page heat record covering alloy, furnace, temperatures, chemistry checks, treatment, molds poured and approvals, then export it.
- Foundry Heat and Melt Record TemplateA fill-in melt record that ties one heat number to its charge, spectrometer results, tap and pour data and the castings poured from it.
- Casting Alloy Density and Pour Temperature ReferenceLook up density, pounds per cubic inch, approximate liquidus and typical pour temperature ranges for common iron, steel, aluminum, zinc, magnesium and copper casting alloys.
Guides
- Casting Quote Estimating for FoundriesHow foundries estimate casting quotes: pour weight, yield, melt loss, core and finishing cost, tooling amortization, and where AI speeds up the first draft.
- Foundry Heat and Lot Traceability for CastingsHow foundries trace castings back to heat, charge, pattern and process records, what customers and auditors ask for, and how to retrieve it in minutes.
- ERP for Foundries: Requirements That Actually MatterWhat a foundry ERP needs: heat and lot traceability, alloy and melt costing, pattern tracking, cleaning room routing, scrap by defect, and honest fit questions.