On-Prem AIFree templatePDF, Excel, Word exportGlobal Shop SolutionsAll Global Shop Solutions tools

Global Shop Solutions Private AI Layer Blueprint Generator

This generator produces a structured architecture plan for adding a private AI assistant to Global Shop Solutions without moving data to a public cloud. It captures your version, database, hosting model, users and sensitive data, and returns a document you can send to IT and security. Export it as PDF or Word.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Global Shop Solutions Private AI Layer Blueprint Generator

Private AI Layer Blueprint: Global Shop Solutions

Prepared for: Ridgeline Machining Inc

Scope: a private AI assistant for Not sure running on Actian Zen / Pervasive PSQL, hosted as: On-prem server. Named users: 90. Sites or plants: 1. Target go-live: Q1 2027 for read-only phase.

Principle: the assistant reads from a copy of the system, runs open-weight models on infrastructure the company controls, and changes data only through supported interfaces after a named person approves.

1. Context and use cases

Use cases in scope: Open job status, work center load, material shortages, supplier delivery performance, traveler and certificate lookup.

Data that must never leave the site: Customer pricing, job cost and margin, customer drawings under export control.

Available GPU: None yet.

2. Components

ComponentDesign for Global Shop SolutionsNotes
Data access pathODBC to a read-only reporting copy; vendor-supported import or API for approved writesRead-only account; no direct writes to application tables
Retrieval indexLocal vector store over documents and long-text fields, tagged with customer, job and document classEmbedding model runs locally
Model servingOpen-weight model on vLLM or Ollama, GPU: None yetSized for 90 named users; see sizing calculator
Tool serverApproved parameterised read actions exposed through MCP or similarEvery call logged; limits on rows returned
Identity and permissionsGlobal Shop user mapped to role-based views through your identity providerScope applied to queries and retrieval filters
AuditAppend-only log of user, prompt, tool calls, rows returned and answerRetained on site per company policy

3. Security controls for Ridgeline Machining Inc

Hosting: On-prem server. All inference, embeddings and indexes stay inside this boundary.

Data that must not leave: Customer pricing, job cost and margin, customer drawings under export control. This data is excluded from any external service, and outbound network access from the AI components is blocked or limited to an allow list.

Access: users sign in through the company identity provider; the assistant enforces the same data scope as the system for each user. Database credentials are held in a vault and the account is read-only.

Write-back: disabled in phases 1 and 2; in phase 3 only for named actions, through supported interfaces, with human approval showing the exact change.

4. Rollout phases

PhaseScopeExit criteria
1: Read-only questionsStatus and lookup questions over the use cases above, with the query shown to the userAccuracy measured on a test set agreed with power users; scope tests pass
2: Documents and draftsDocument Q and A and drafted messages or transactions that a user enters manuallyCitations verified; no cross-scope leakage in tests
3: Approved actionsA short list of write actions through supported interfaces with approvalEach action signed off by the business owner and IT

5. Open questions for IT

1. Which database edition, version and replication options are licensed for Actian Zen / Pervasive PSQL? 2. Who owns the read-only copy and its refresh schedule? 3. Which identity provider and groups map to roles for 90 users across 1 site(s)? 4. Where will the GPU host sit, and how are model files approved and updated? 5. What is the retention period for audit logs? 6. Which customer or regulatory commitments restrict where data may be processed?

Prepared by / Date
IT / Security review / Date
Business owner / Date

This is a planning document, not a security certification or legal advice. Table and API details differ by release, so verify each data access detail against your own system before building.

Get this blueprint reviewed

Send the exported plan and a Netray engineer will review it against your Global Shop Solutions setup and flag gaps. Optional; the generator is free without it.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the generator

Fill in the company, version, database, hosting model, user and site counts, and the use cases you want first. List the data that must never leave the site as specifically as you can, because the security section is built from it. Then export the document and use it as the agenda for a review with IT, security and the business owner.

  • Start with two or three use cases, not ten
  • Be specific about restricted data classes
  • Pick the hosting model your policy allows
  • Share the open questions with IT before the meeting

What the blueprint contains

The plan sets out the context, a component table (data access path, retrieval index, model serving, tool server, identity and audit), the security controls mapped to your inputs, a three-phase rollout and a list of open questions. The component choices follow a common pattern: read from a copy, retrieve documents locally, serve an open-weight model on your GPUs, and log everything.

  • Data access path: ODBC to a read-only reporting copy; vendor-supported import or API for approved writes
  • Identity: Global Shop user mapped to role-based views through your identity provider
  • Phases: read-only, drafts, approved actions

Reading the output critically

Treat the blueprint as a starting hypothesis. Table names, interfaces and replication options vary by release, so have your administrator confirm each data access item. Check licensing for any database replication feature you plan to rely on, and decide who will own the model host, the index and the audit log after go-live.

Common mistakes

Teams often start by pointing the model at the production database, letting write-back arrive in the first release, or skipping role tests. Another frequent error is ignoring documents: much of the value is in drawings, certificates and procedures that never sat in the database.

  • Production database used for AI queries
  • No role or scope tests before go-live
  • Write-back enabled too early
  • No owner for the audit log

Frequently Asked Questions

Is this blueprint specific to Global Shop Solutions?

The data access path, identity mapping and component notes are tailored to Global Shop Solutions, but you should still verify table names, interfaces and licensing against your own release before building.

Does the plan require a public cloud?

No. The design keeps inference, embeddings, indexes and logs inside your boundary. You can choose on-prem server, private cloud or air-gapped hosting in the form.

Can I give the output to my security team?

Yes. It is formatted for sharing and lists controls and open questions. It is a planning document, not a certification, so your security team will still apply its own review.

Do I need a GPU before I start?

No. The form accepts none yet. The sizing calculator estimates GPU count from your usage, and a pilot can start on a single 24 GB or 48 GB GPU.

Netray builds private AI layers for job shops running Global Shop Solutions on-prem. If you want this blueprint checked against your release, database and modules, ask for an expert review.

Get Global Shop Solutions alerts

Support and maintenance deadlines, release changes that affect Global Shop Solutions sites, and new free Global Shop Solutions tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Global Shop Solutions: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Global Shop Solutions? Start with the Global Shop Solutions guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software