How to Create a Quote in E2 Shop System
how to create a quote in E2 Shop System
Also searched as
- E2 Shop System estimate to job order
- E2 Shop System quoting module how to
- convert E2 quote to sales order
- E2 Shop System RFQ entry steps
Short answer
A quote in E2 Shop System starts with a header identifying the customer and part, then adds routing operations with time and rate, material and outside processing costs, and a markup to reach a sell price. Once accepted, the quote converts directly into a job or sales order so the estimate carries forward as the job's cost basis.
Applies to: E2 Shop System (Shoptech, now part of Global Shop Solutions), used by job shops and contract manufacturers for RFQ-to-job workflows.
Build and convert a quote in E2 Shop System
- 1Open the Estimating module and create a new quote header, entering the customer, part number or description, quantity break levels, and the requested due date from the RFQ.
- 2Add each manufacturing operation to the quote's routing in sequence (for example, cut, mill, deburr, inspect), with an estimated setup time and run time per piece for each.
- 3Apply labor and machine rates to each operation so the routing rolls up into an estimated labor and overhead cost per quantity break.
- 4Add raw material lines with quantity, unit cost, and scrap allowance, pulling from existing material records where the part or stock size already exists.
- 5Add any outside processing steps (plating, heat treat, anodizing) as separate cost lines with an estimated vendor cost and lead time, since these affect both price and the quoted delivery date.
- 6Apply your shop's markup or margin target to roll the estimated cost up to a sell price, checking the price at each quantity break the customer asked for.
- 7Print or export the quote for the customer, and record the sent date so open quotes can be tracked and followed up.
- 8When the customer accepts, convert the quote directly into a job (or a sales order that generates the job), which carries the routing, material, and cost estimate forward as the job's baseline.
Why the quote becomes the job's cost baseline
E2 Shop System is built around estimating driving job costing, not just pricing. When a quote converts to a job, the routing operations, estimated hours, and material lines entered at quote time become the standard the job is measured against once actual labor and material transactions start posting.
This is why getting the routing and rates right at the quoting stage matters beyond just winning the work - a sloppy estimate makes every job cost variance report against it look wrong even when the shop actually performed well.
Quantity breaks and setup amortization
Job shops quote in quantity breaks because setup time gets amortized differently across volumes - a 10-piece run absorbs the same setup cost as a 100-piece run, which changes the per-piece price significantly. E2's quoting lets you enter setup once per operation and let the system spread it across each quantity break you quote.
Quoting only a single quantity when the customer is comparing volume pricing is a common mistake; walking through the quantity break fields at quote entry avoids a slower re-quote cycle later.
Outside processing and lead time in the quote
Outside processing costs (plating, heat treat, special coatings) need to be estimated with realistic vendor pricing and lead time, since they both raise the quoted cost and extend the promised delivery date. Underestimating outside process lead time is one of the more common reasons a shop misses a quoted ship date even when in-house operations ran on schedule.
Try it here, free
E2 Shop System AI Assistant Sizing and Value Calculator
Estimate peak concurrency, GPU count, index size, hours saved and payback for a private AI assistant on E2 Shop System.
Common pitfalls
- !Entering routing time estimates from memory instead of pulling actual historical run times for similar parts, which skews every quantity break.
- !Forgetting to add scrap allowance to material lines, understating true material cost on parts with a tight tolerance or difficult process.
- !Quoting a single quantity when the RFQ asked for multiple quantity breaks, forcing a manual re-quote later.
- !Leaving outside processing lead time out of the quoted delivery date, causing the shop to miss ship dates that were never realistic.
- !Not updating the standard quote markup after material or labor rate increases, so the shop is unknowingly quoting thinner margins over time.
How an ERP-grounded AI assistant handles this
ERPray grounded on E2 Shop System's historical job cost data can suggest realistic routing times and material costs for a new quote based on similar parts the shop has actually run, instead of an estimator guessing from memory, and can flag when a proposed markup would price a job below the shop's recent actual margin on comparable work.
Frequently asked questions
Does E2 Shop System automatically convert an accepted quote into a job?
Yes, an accepted quote converts directly into a job (or the sales order that spawns the job), carrying the routing, material, and cost estimate forward so the job is measured against the original quote.
How should I handle outside processing costs in a quote?
Add them as separate cost lines with a realistic vendor price and lead time. They affect both the sell price and the delivery date you can promise, so underestimating either causes problems later in the job.
Why does my quoted price change so much between quantity breaks?
Setup time is largely fixed per operation regardless of run quantity, so it gets amortized over fewer or more pieces depending on the quantity break, which is why low-volume quotes often carry a much higher per-piece price.
Can I revise a quote after it has been sent to the customer?
Yes, quotes can be revised before acceptance. It is good practice to keep a revision history so you can see what changed between what was originally quoted and what was ultimately accepted.
Related
How to Close a Job in JobBOSS2
A job in JobBOSS2 will not close cleanly until every routing operation is marked complete, all material has been issued or returned, and all labor and cost transactions are posted. Review the job's Work In Process detail first, clear any open items, then change the job status to Complete and run final job costing before it is locked.
Error fixQAD Says "Unable to Connect to the Application Server": How to Fix It
This error almost always means the Progress OpenEdge AppServer broker behind QAD is stopped, unreachable over the network, or out of licensed connections, not a database problem. Confirm the broker process is running and healthy in OpenEdge Explorer, check the port and firewall path from the client, then restart the broker with clean agent settings.
How-toHow to Set Up an EDI Trading Partner in Plex Systems
Setting up an EDI trading partner in Plex's EDI Data Manager means defining the partner and their connection details, mapping the specific document types they will exchange (purchase orders, forecasts, shipping schedules, ASNs, invoices) to Plex's Customer and Part records, and running the partner through test mode before flipping them to production.
How-toHow to Run Live Scheduling in Global Shop Solutions
Live Scheduling in Global Shop Solutions builds a finite-capacity schedule from job routing operations against defined work centers, then presents it as a drag-and-drop board that shop supervisors adjust to reflect real shop floor priorities. Its accuracy depends on work centers, standard hours, and shop floor data collection all being kept current, since the schedule is only as good as the routing and capacity data feeding it.
How-toHow to Create a Generic Inquiry in Acumatica
Generic Inquiries (GI) are Acumatica's no-code query builder for joining tables, adding filters, and exposing the result as an inquiry screen, dashboard data source, or API endpoint. Open System > Customization > Generic Inquiry, add your base table, define joins and conditions, then run and save. No SQL or customization project is required.
Error fixFix Odoo AccessError: You Are Not Allowed to Access Records
Odoo raises AccessError when a user's security groups do not grant a CRUD right on a model through ir.model.access.csv, or when an ir.rule record rule filters the specific record out for that user or company. Fix it by adding the user to the group named in the error, editing the model's access rights, or reviewing the record rule's domain under Settings > Technical > Security.
AI for ERPAI for ECI JobBOSS2 and E2 Shop System
Add AI to ECI JobBOSS2 or E2 Shop System for faster quoting, tighter scheduling, and shop-floor answers, without sending your job data to the cloud.
Stuck on E2 Shop System (Shoptech / Global Shop Solutions)?
Talk to engineers who work inside E2 Shop System (Shoptech / Global Shop Solutions) every week, and who build private AI that answers these questions from your own ERP data.
Keep exploring
Free tools
- E2 Shop System AI Assistant Sizing and Value CalculatorEstimate peak concurrency, GPU count, index size, hours saved and payback for a private AI assistant on E2 Shop System.
- E2 Shop System Private AI Layer Blueprint GeneratorFill in your version, database, hosting and use cases to get an architecture plan for a private, on-prem AI assistant on E2 Shop System, ready to share with IT and security.
- JobBOSS to E2 Shop System Migration ChecklistA practical checklist for moving a small shop from JobBOSS to E2 Shop System, from data audit through cutover and first month close. Works in reverse too.
ERP fixes and how-tos
- How to Add a Private AI Layer to E2 Shop System On-PremHow to add a private on-prem AI assistant to E2 Shop System: database views, quote and job data, document retrieval, role scope, sizing and phased rollout.
- E2 Shop System 7.2 (Shoptech): Versions, Manuals, Training, Support and ReportingA practical guide to Shoptech's E2 Shop System including 7.2: what it does, where manuals and training come from, support options, reporting and upgrade checks.
- E2 Shop System Error 5093: Causes and How to TroubleshootE2 Shop System (Shoptech) error 5093: how to isolate whether it is a database, permission, driver or network problem, and the checks to run before calling support.
Guides
- Job Shop ERP Software Comparison: JobBOSS, E2 Shop System, ProShop and Global ShopJob shop ERP software compared for CNC machine shops: JobBOSS2, E2 Shop System, ProShop, Global Shop Solutions and Epicor Kinetic, and the questions to ask.
- ERP for Metal Fabricators: What the System Must HandleERP for metal fabricators and sheet metal shops: nested material, multi-level BOMs, heat number traceability, outside processing, and shop floor data.
- ERP for Aerospace Build-to-Print Machine Shops: What to RequireWhat an AS9100 build-to-print machine shop needs from ERP: revision control, traveler, lot traceability, outside processing, FAI and certs.
AI on your ERP
- AI for E2 Shop System in Metal Fabrication: Quote History, Material Yield and Delivery RiskPrivate AI for E2 Shop System fabricators: sheet and plate quoting history, nesting yield, welding job costs and delivery risk, answered from your own data.
- AI for ECI JobBOSS2 and E2 Shop SystemAdd AI to ECI JobBOSS2 or E2 Shop System for faster quoting, tighter scheduling, and shop-floor answers, without sending your job data to the cloud.
Integrations
- How to add AI agents to ECI E2 Shop SystemHow to add AI agents to ECI E2 Shop System: a read-first tool layer over the E2 SQL database, human approval on writes, and a private on-prem model option.
- How to use Claude with ECI E2 Shop SystemHow to use Claude with ECI E2 Shop System: MCP connectors, Anthropic API, AWS Bedrock or Vertex options, data handling, and the on-prem alternative.
Software
- ECI E2 Shop SystemIndependent guide to E2 Shop System, the ECI shop management and manufacturing software for job shops: modules, integrations, strengths, limits, alternatives and AI use cases.
- Global Shop SolutionsWhat Global Shop Solutions ERP is, how its estimating, scheduling and shop floor modules serve job shops, and which ERP alternatives to compare.