Dynamics GP AR Aging SQL Query Generator
Receivables aging is the report every GP controller runs and every migration must reconcile. This generator writes a clean SQL aging query over RM20101 and RM00101 that you can run in SSMS or put behind a report.
Fill in
The GP company database name (INTERID), for example TWO for the sample company.
Optional. Clear the field to include all customer classes.
Aging by customer
USE [TWO];
GO
WITH open_items AS (
SELECT
o.CUSTNMBR,
o.DUEDATE,
CASE WHEN o.RMDTYPAL >= 7 THEN -o.CURTRXAM ELSE o.CURTRXAM END AS signed_amt,
DATEDIFF(day, o.DUEDATE, '2026-09-30') AS days_past_due
FROM dbo.RM20101 o
WHERE o.VOIDSTTS = 0
AND o.CURTRXAM <> 0
AND o.DOCDATE <= '2026-09-30'
)
SELECT
RTRIM(c.CUSTNMBR) AS customer_id,
RTRIM(c.CUSTNAME) AS customer_name,
SUM(CASE WHEN i.days_past_due <= 0 THEN i.signed_amt ELSE 0 END) AS current_not_due,
SUM(CASE WHEN i.days_past_due BETWEEN 1 AND 30 THEN i.signed_amt ELSE 0 END) AS days_1_to_30,
SUM(CASE WHEN i.days_past_due BETWEEN 30 + 1 AND 60 THEN i.signed_amt ELSE 0 END) AS days_30_to_60,
SUM(CASE WHEN i.days_past_due BETWEEN 60 + 1 AND 90 THEN i.signed_amt ELSE 0 END) AS days_60_to_90,
SUM(CASE WHEN i.days_past_due > 90 THEN i.signed_amt ELSE 0 END) AS over_90,
SUM(i.signed_amt) AS total_open
FROM open_items i
JOIN dbo.RM00101 c ON c.CUSTNMBR = i.CUSTNMBR
WHERE 1 = 1
AND c.CUSTCLAS = 'USA-ILMO-T1'
GROUP BY c.CUSTNMBR, c.CUSTNAME
HAVING SUM(i.signed_amt) <> 0
ORDER BY total_open DESC;Read-only SELECT. In RM20101, RMDTYPAL values 7 and above are credit-type documents (credit memos, returns, payments), which is why they are negated; confirm against your RM setup. CURTRXAM is the current balance in the originating currency. This query reflects the balance today, not a true historical as-of balance, because applications after the as-of date are not unwound. Test on a copy first.
Need GP reports on a new platform?
An optional review of which GP reports to rebuild, retire or archive.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter the company database, the as-of date and the three bucket edges. Copy the SQL into SQL Server Management Studio, connect to the GP instance and run it. The optional filter lets you narrow to a customer class. The output has one row per customer with current, three aged buckets, over the last bucket and a total.
- Use read-only SQL permissions for the account that runs it
- Compare the grand total to the GP Aged Trial Balance report
- Export the result set to Excel for the month-end pack
How the query works
It reads open items from RM20101, the receivables open transaction table, excludes voided documents and zero balances, signs credit documents negatively and computes days past due as the difference between the due date and the as-of date. Conditional SUM expressions then place each amount in a bucket. Joining to RM00101 adds the customer name and lets you filter by class.
Reconciling against GP
Totals should tie to the GP Aged Trial Balance run with the same date type (due date versus document date) and the same options for unapplied credits. Differences usually come from aging by document date instead of due date, foreign currency documents, or history that was removed. Fix the definition first before suspecting data.
Common mistakes
Do not sum ORTRXAMT, the original amount, when you want the open balance. Do not forget that credit documents carry positive amounts in GP and need signing. If you use multicurrency, add currency columns rather than adding totals across currencies.
Frequently Asked Questions
Which GP versions does this work with?
RM20101 and RM00101 exist in all modern GP releases, from GP 2010 through current. Column names used here (CUSTNMBR, DUEDATE, CURTRXAM, RMDTYPAL, VOIDSTTS) are long standing. Always test against your own database since customisations can differ.
Why do my totals not match the GP report?
Check the aging date basis (due date versus document date), whether the GP report includes unapplied payments and credits, and whether it uses the functional or originating currency. Match those settings, then compare again.
Can I run this on production?
It is a SELECT, so it does not change data, but heavy queries can slow users. Run it against a restored copy or in a quiet period, and use a read-only login.
How do I add salesperson or territory?
Add the SLPRSNID or TERRITRY columns from RM00101 to the select list and group by clause. Those columns are on the customer master, so no extra joins are needed.
If you need aging, cash and exposure reports rebuilt on a successor ERP or a private reporting layer, we can help build and reconcile them against your GP numbers.
Related Tools
Dynamics GP Work, Open and History Table Map
A searchable list of Dynamics GP tables grouped by lifecycle: master, work, open and history, so you know where a transaction lives at each stage.
Microsoft DynamicsDynamics GP SQL Trial Balance Query Generator
Build a read-only trial balance by account for a chosen fiscal year and period from the GP summary tables.
Microsoft DynamicsDynamics GP Inventory On-Hand by Site SQL Generator
Generate a read-only SQL query that lists item quantities and value by site from IV00101 and IV00102.
More Microsoft Dynamics tools
See all- Dynamics GP End of Support Migration Assessment
- Dynamics GP SQL Table Reference (IV00101, SOP10100, POP10100)
- Dynamics GP Chart of Accounts Mapping Worksheet
- GP to Business Central Cutover Runbook Template
- GP Third-Party Add-On Inventory Worksheet
- GP Cutover Open Balances Reconciliation Worksheet
- GP to Business Central Partner RFP Letter Template
- GP and AX User Role to Business Central Permission Mapping Worksheet
- GP Open Transactions SQL Query Generator
Keep exploring
Free tools
- GP Open Transactions SQL Query GeneratorBuild read-only SQL for open SOP orders, open RM receivables and open PM payables in a GP company database for migration extracts.
- Dynamics GP SQL Trial Balance Query GeneratorBuild a read-only trial balance by account for a chosen fiscal year and period from the GP summary tables.
- Dynamics GP Inventory On-Hand by Site SQL GeneratorGenerate a read-only SQL query that lists item quantities and value by site from IV00101 and IV00102.
ERP fixes and how-tos
- Adding a Private AI Layer to Dynamics GP On-PremAdd AI to Dynamics GP on-prem without cloud: curated SQL views, eConnect for writes, retrieval index, local LLM, mirrored GP security, approved write-back.
- Dynamics GP POP Tables: Purchase Order Processing Reference and Sample SQLReference for Dynamics GP Purchase Order Processing tables: POP10100, POP10110, POP30100, POP30110, receipt tables, key joins and sample SQL queries.
AI on your ERP
- AI for Dynamics GP and NAV, Before the Business Central DecisionDynamics GP mainstream support is ending and NAV is long retired from active development. Add a private LLM over GP or NAV data now, on-prem, without a forced Business Central move.
- AI for ERP Accounts Receivable and Collections, Grounded in Your Open ItemsUse AI on your ERP to prioritize collections, draft dunning, match cash and explain DSO movement, read-only by default and on-prem if needed.
Integrations
- How to connect Claude to Microsoft Dynamics GPUse Claude with Dynamics GP through an MCP server over read-only SQL views, via the Anthropic API, Bedrock or Vertex, or keep everything on-prem with open models.
- How to use ChatGPT with Microsoft Dynamics GPConnect ChatGPT to Dynamics GP safely: export versus live access, custom GPT actions over an API gateway, enterprise data controls, and when to go private.