Safety & WorkforceFree referencePDF, Excel, Word exportManufacturing

Plant HR and Labor KPI Definitions: Formulas for Absenteeism, Turnover, TRIR and More

Plant HR, EHS and operations teams often argue about KPI formulas before they argue about results. This table lists the workforce measures used in manufacturing with the standard formula, unit and a note on how to interpret each.

Download:
KPIFormulaUnitHow to read it
Absenteeism rate
Unplanned absence days / scheduled work days x 100
Percent
Define whether approved leave counts. Track by shift and department.
Bradford factor
S x S x D, where S is number of absence spells and D is total days absent
Points
Penalizes frequent short absences more than one long absence.
Employee turnover rate
Separations in period / average headcount x 100
Percent
Annualize if the period is shorter than a year.
Voluntary turnover rate
Resignations in period / average headcount x 100
Percent
Excludes layoffs, retirements and dismissals.
90 day attrition
New hires who left within 90 days / new hires in cohort x 100
Percent
A signal of onboarding or role fit problems.
Time to fill
Offer acceptance date minus requisition approval date
Days
Report the median as well as the mean.
Cost per hire
(Internal recruiting cost + external recruiting cost) / number of hires
Currency
State which costs are included.
Vacancy rate
Open positions / total authorized positions x 100
Percent
Pair with time to fill.
Overtime percentage
Overtime hours / total hours worked x 100
Percent
Persistent high values suggest understaffing or poor scheduling.
Labor utilization
Productive hours / available paid hours x 100
Percent
Productive hours are those booked to jobs or operations.
Labor efficiency
Earned (standard) hours / actual hours x 100
Percent
Above 100 means faster than standard.
Labor productivity
Output units / labor hours
Units per hour
Compare like products and routings.
Direct labor cost per unit
Direct labor cost / units produced
Currency per unit
Include burden separately if you track it.
Revenue per employee
Revenue / average headcount
Currency
High level measure, sensitive to outsourcing.
Span of control
Number of employees / number of supervisors
Ratio
Typical production spans differ by process complexity.
Training hours per employee
Total training hours / average headcount
Hours
Split mandatory safety from skills training.
Training completion rate
Employees with completed required training / employees requiring it x 100
Percent
Report by course and expiry date.
Skills coverage
Stations with at least 2 qualified operators / total stations x 100
Percent
Shows single points of failure.
TRIR (total recordable incident rate)
Recordable cases x 200,000 / employee hours worked
Per 100 full time workers
200,000 equals 100 workers at 2,000 hours a year (OSHA basis).
DART rate
Cases with days away, restricted or transferred x 200,000 / hours worked
Per 100 full time workers
Shows injury severity beyond recordable cases.
Lost time injury frequency rate
Lost time injuries x 1,000,000 / hours worked
Per million hours
Used in many countries. Basis differs from TRIR.
Severity rate
Days lost x 200,000 / hours worked
Days per 100 workers
Check your own definition of days lost.
Schedule adherence
Hours worked as scheduled / hours scheduled x 100
Percent
Useful for shift based lines.
Internal fill rate
Positions filled internally / total positions filled x 100
Percent
Shows career path strength.

Definitions vary between companies and countries. Write down your own convention for each KPI, including what counts in the numerator and denominator, and keep it constant over time so trends are valid.

One workforce KPI view from your ERP

Optional: a short review of which workforce KPIs can be built from your ERP and time data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Search for the KPI you must report, such as turnover or TRIR, and copy the formula into your dashboard specification. Export the list to Excel to build a KPI dictionary for your plant. Add the data source and owner beside each row, because a KPI without an owner usually stops being updated within a year.

Formulas worth getting exactly right

The incident rates are standardized. TRIR multiplies recordable cases by 200,000 and divides by hours worked, which expresses cases per 100 full time workers. The Bradford factor squares the number of absence spells before multiplying by total days, so ten single-day absences score 1,000 while one ten-day absence scores 10. Labor efficiency compares earned standard hours to actual hours, so it needs reliable routing standards.

  • Annualize turnover for periods shorter than one year
  • Use average headcount, not end of period headcount
  • Keep contractors and agency staff in a separate view

Where the data comes from

Absence and overtime come from time and attendance, headcount from HR, and earned hours from ERP production reporting. Incident data comes from your EHS log. Mismatches between systems are the main cause of disputed numbers, so reconcile employee IDs and calendar definitions before building reports.

Common mistakes

Frequent errors are mixing hours bases across rates, using different absence definitions between plants, counting temporary workers in only one of numerator or denominator, and reporting efficiency when standards are outdated. Always show the denominator beside a rate so a small sample does not mislead.

Frequently Asked Questions

What is a good absenteeism rate in manufacturing?

It varies by country, shift pattern and how absence is defined, so compare against your own history and similar plants. A rate that rises on particular shifts or days of the week is more useful to investigate than a single plant wide number.

Why is TRIR multiplied by 200,000?

The OSHA convention assumes 100 full time workers working 40 hours a week for 50 weeks, which is 200,000 hours. Multiplying by this base lets plants of different sizes be compared as incidents per 100 full time workers.

How do I calculate Bradford factor for a team?

Calculate it per employee over a rolling 52 weeks using S squared times D, then report distribution across the team rather than an average. The score is a trigger for conversation, and policies should account for disability and protected absences.

Should turnover include retirements?

Total turnover includes every separation, including retirements, dismissals and end of contract. For retention analysis, also report voluntary turnover, which excludes them. State which one you show on every chart.

If these KPIs sit across HR, time and ERP systems, we can help build one read-only view with documented definitions.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

Software