Hazard Identification and Risk Ranking Worksheet
A hazard log is the simplest risk tool in the plant: list hazards, score them, add controls and score again. This worksheet does the multiplication and keeps the before and after view in one table.
| Area or task | Hazard | Potential harm | Likelihood (1-5) | Severity (1-5) | Initial score | Initial band | Controls | Residual likelihood | Residual severity | Residual score | Owner | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
12 | 4 | |||||||||||
9 | 3 | |||||||||||
10 | 5 | |||||||||||
8 | 4 |
Typical banding on a 5x5 matrix: 1-4 low, 5-9 medium, 10-16 high, 17-25 intolerable. Set your own bands and follow local law. This worksheet is a record aid, not a safety certification.
Link hazards to ERP maintenance and incidents
Optional: we can tie hazard log items to work orders and incident records.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Walk the area with the people who do the job. For each hazard, record the harm, score likelihood and severity from 1 to 5 and write down the existing controls. Enter residual likelihood and severity after the controls. Type your band name next to each score. Sort by score in Excel to see the top risks first.
- Assess tasks, not only machines
- Include non-routine work such as maintenance
- Score without controls first, then with
- Assign a named owner for each high risk
The 5x5 matrix
Risk score equals likelihood times severity. With a 5x5 matrix the score runs from 1 to 25. Plants usually define bands, for example low up to 4, medium 5 to 9, high 10 to 16 and intolerable above 16, and tie each band to a required response. Use your own company bands; the numbers above are an example.
Hierarchy of controls
Reduce risk in this order: eliminate the hazard, substitute something safer, apply engineering controls such as guards and interlocks, use administrative controls such as procedures and training, and only then rely on personal protective equipment. A residual score that depends mostly on PPE or training is fragile and should be revisited.
Common mistakes
Scoring after controls only hides the true hazard. Rating severity by the usual outcome rather than the credible worst case understates risk. Forgetting to review after a process change leaves old scores in force. Treat the log as a living document with a review date.
Frequently Asked Questions
Is this a HIRA or JSA?
It is a general hazard identification and risk ranking log, similar in structure to a HIRA. A job safety analysis breaks one task into steps; this log works at area or task level. Use whichever your procedure requires.
What do the bands mean?
They are an example. Companies define their own bands and required responses, such as stop work, immediate action or monitor. Use your EHS procedure and local legal requirements.
Does it replace a legal risk assessment?
No. Many jurisdictions require specific assessments, for example for machinery, chemicals or noise. This worksheet is a working record and does not certify compliance.
How often should it be reviewed?
At least annually, and after incidents, process changes, new equipment or layout changes. High risks deserve more frequent review until residual risk is acceptable.
If incidents and permits live in your ERP or EHS system, Netray can connect them to this log. Ask for a short review.
Related Tools
Risk Response and Contingency Plan Template
A document for the top risks on a program: how you will respond, what triggers the fallback and who decides.
Quality & InspectionFMEA Recommended Actions Tracker Worksheet
Track each FMEA action with owner, due date, status and before-and-after ratings, with RPN and RPN reduction calculated automatically.
Quality & InspectionFMEA RPN and Risk Reduction Calculator
Compare RPN before and after an action and see how much each rating contributes to the reduction.
Quality & InspectionFMEA Lessons Learned and Carry-Over Review Template
A structured document to capture what escaped, why the FMEA missed it and which lines and controls need updating.
More Safety & Workforce tools
See all- Plant HR and Labor KPI Definitions Reference
- Shift Work Fatigue Risk Assessment
- New Operator First Week Onboarding Checklist
- Production Supervisor Capability Self-Assessment
- Toolbox Talk Record Template
- Confined Space Entry Permit Template
- Hot Work Permit Template
- Emergency Action Plan Template
- Safety Training Matrix Worksheet
Keep exploring
Free tools
- Process Hazard Analysis HAZOP WorksheetA HAZOP-style worksheet with node, parameter, guide word, cause, consequence, safeguards and a simple severity times likelihood risk score.
- PPE Hazard Assessment Matrix WorksheetAn editable PPE matrix listing tasks, hazards and the required protection for each, exportable to Excel for your written hazard assessment.
- Pareto Defect Cost Ranking WorksheetEditable table to log defect types, counts, unit cost and handling time, with extended cost and hours for ranking.
Guides
- ERP Duplicate Data Identification and ResolutionIdentify and resolve duplicate records in your ERP with fuzzy matching, survivorship rules, and merge strategies. Reduce duplicates by 90% before migration.
- Infor M3 Upgrade: Risk Assessment FrameworkAssess risks before upgrading Infor M3. Customization impact analysis, integration compatibility testing, and go/no-go decision framework.