Maintenance & ReliabilityFree referencePDF, Excel, Word exportHydraulic Equipment Manufacturing

Hydraulic Oil ISO VG Viscosity Grade Reference

ISO VG numbers are the language of industrial lubricant purchasing. This table lists each grade defined in ISO 3448 with the actual cSt range at 40 C and where each is commonly applied.

Download:
ISO VG gradeMinimum at 40 C (cSt)Mid-point at 40 C (cSt)Maximum at 40 C (cSt)Typical application
ISO VG 2
1.98
2.2
2.42
Spindle and very light precision lubrication
ISO VG 3
2.88
3.2
3.52
Spindle and light instrument oils
ISO VG 5
4.14
4.6
5.06
High speed spindles and light machine oils
ISO VG 7
6.12
6.8
7.48
Light machine tool and spindle oils
ISO VG 10
9
10
11
Spindles and light-duty hydraulics
ISO VG 15
13.5
15
16.5
Low temperature hydraulics, machine tool slideways
ISO VG 22
19.8
22
24.2
Cold climate and low-temperature hydraulic systems
ISO VG 32
28.8
32
35.2
Common indoor industrial hydraulics, vane pumps
ISO VG 46
41.4
46
50.6
Most widely specified general hydraulic oil grade
ISO VG 68
61.2
68
74.8
Hot environments, heavy-duty hydraulics, light gear oil
ISO VG 100
90
100
110
Light gearboxes, slideways, large circulating systems
ISO VG 150
135
150
165
Industrial gear drives, way lubricants
ISO VG 220
198
220
242
Industrial enclosed gear drives
ISO VG 320
288
320
352
Heavily loaded enclosed gear drives
ISO VG 460
414
460
506
Heavy gear drives and slow-speed bearings
ISO VG 680
612
680
748
Heavy gear drives, open gearing at low speed
ISO VG 1000
900
1,000
1,100
Very heavy gear drives and slow, high-load applications
ISO VG 1500
1,350
1,500
1,650
Worm gears and very slow, heavily loaded drives

Grades follow the ISO 3448 system: the number is the mid-point kinematic viscosity in cSt at 40 C, and each grade allows plus or minus 10 percent. Applications listed are common practice, not a specification. Always follow the pump or gearbox manufacturer's allowed viscosity window at operating temperature, and check viscosity index (VI) because two oils of the same grade can differ widely at 100 C.

Lubricant spec lookup

Optional: we can show how lubricant grade by asset can be searched from your maintenance data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by grade or by application. Match the grade to the viscosity window in the pump manual, which is usually given in cSt at operating temperature, not at 40 C. For example, many piston pumps want 16 to 36 cSt for best efficiency and tolerate 10 to 1000 cSt briefly during cold start. Use the table to pick a grade, then check where that grade lands at your real oil temperature using the viscosity index from the product data sheet.

  • Pick the grade, then verify viscosity at running temperature
  • Check the minimum viscosity at maximum temperature
  • Check the maximum viscosity at cold start
  • Avoid mixing grades or oil families without compatibility checks

The ISO 3448 system

ISO 3448 defines 18 industrial liquid lubricant viscosity grades from VG 2 to VG 1500. The grade number is the mid-point kinematic viscosity in centistokes at 40 C. A tolerance of plus or minus 10 percent defines the minimum and maximum. Grades are spaced by a geometric series so that each step is roughly 50 percent higher than the last. The system is independent of base oil or additive package, so it says nothing about oil quality, viscosity index, wear additives or oxidation life.

Reading the table and choosing a grade

ISO VG 46 is the default for general hydraulic work in temperate indoor plants. VG 32 helps in cooler spaces or with pumps that prefer lower viscosity, while VG 68 suits hot ambient conditions or oil running near 150 F. Moving up one grade usually lowers internal leakage and raises pump efficiency at high temperature, but raises cold-start drag and pumping losses. If oil temperature swings widely, a high-VI multigrade fluid often gives a better operating window than shifting grade.

Common mistakes

The usual error is confusing ISO VG with SAE viscosity grades, which use different test temperatures and are not interchangeable with a simple conversion. Another is switching grade to solve a leak or noise problem without checking temperature. Do not rely on grade to infer quality; compare the datasheet VI, pour point, antiwear package and demulsibility, and confirm any OEM approval such as the pump maker's fluid specification.

Frequently Asked Questions

What does the number in ISO VG 46 mean?

It is the mid-point kinematic viscosity in centistokes at 40 C. An ISO VG 46 oil can measure anywhere from 41.4 to 50.6 cSt at 40 C under ISO 3448.

Is ISO VG the same as SAE grade?

No. SAE engine and gear grades use different temperatures and test methods. Comparison charts are approximate, so use the product datasheet for the exact viscosity at both 40 and 100 C.

Can I switch from VG 46 to VG 68?

Only after checking the pump's viscosity window at your hottest and coldest oil temperature, and the filter and cold-start limits. A flush may be needed to avoid mixing oil families.

What is viscosity index?

VI measures how much viscosity changes with temperature. A higher VI means less change. High-VI oils give a wider usable temperature range for the same ISO grade.

Netray can connect lubricant specifications and oil analysis records to a private assistant so techs can look up the right grade for a specific asset.