ISO 4406 Oil Cleanliness Code Table
ISO 4406 describes how clean a fluid is using three range numbers. This table converts each range number to the particle count per millilitre it stands for, so you can interpret a lab report or set a target.
| Range number | More than (particles per mL) | Up to and including (particles per mL) | Approx. particles per 100 mL (upper limit) |
|---|---|---|---|
6 | 0.32 | 0.64 | 64 |
7 | 0.64 | 1.3 | 130 |
8 | 1.3 | 2.5 | 250 |
9 | 2.5 | 5 | 500 |
10 | 5 | 10 | 1000 |
11 | 10 | 20 | 2000 |
12 | 20 | 40 | 4000 |
13 | 40 | 80 | 8000 |
14 | 80 | 160 | 16000 |
15 | 160 | 320 | 32000 |
16 | 320 | 640 | 64000 |
17 | 640 | 1300 | 130000 |
18 | 1300 | 2500 | 250000 |
19 | 2500 | 5000 | 500000 |
20 | 5000 | 10000 | 1000000 |
21 | 10000 | 20000 | 2000000 |
22 | 20000 | 40000 | 4000000 |
23 | 40000 | 80000 | 8000000 |
24 | 80000 | 160000 | 16000000 |
Each step up in range number roughly doubles the allowed particle count. The code is written as three numbers, for particles larger than 4, 6 and 14 microns (c), for example 18/16/13. Targets depend on the component and the manufacturer, so use the OEM figure first.
Get oil analysis results into your CMMS
Optional: we can review how lab results reach your maintenance system and propose a simple, read-only integration.
Optional. The tool and every export work without this. No spam.
How to read an ISO 4406 code
A code such as 18/16/13 has three numbers. They refer to the count of particles per millilitre larger than 4, 6 and 14 microns measured as (c) by an automatic particle counter calibrated to ISO 11171. Find the first number in the table: range 18 means more than 1,300 and up to 2,500 particles per millilitre larger than 4 microns. Do the same for the other two numbers. Because the scale is roughly doubling, one step is a factor of two and three steps is about a factor of eight.
- First number: particles larger than 4 microns
- Second number: particles larger than 6 microns
- Third number: particles larger than 14 microns
- Each range number step is about double the count
Setting a target
Pick the target from the most sensitive component in the system, for example a servo valve or a high pressure pump, using the manufacturer figure. Then choose filtration and breather options to hold that code in service. A common practice is to set a target, an alarm at one range number above and a danger limit at two above, but your own limits should come from OEM data and the results of your own trend. Re-sample after a filter change to confirm the code improved.
Worked example
A hydraulic press reservoir reads 20/18/15 against a target of 18/16/13. Each number is two steps over target, so roughly four times more particles in every size band. Look up range 20 (5,000 to 10,000 per mL) versus range 18 (1,300 to 2,500 per mL). The fix is to find the ingress source first, check the breather and cylinder rod seals, and then run an offline kidney loop filter until the sample is back on target.
Common mistakes
Sampling from the bottom of the tank or from a dead leg gives a distorted result. Always sample from a live line using a minimess port when the system is running at temperature. Another mistake is comparing codes from older lab reports that used NAS 1638 or older ISO 4406 versions with two numbers; the scales are not interchangeable. Finally, new oil is often not clean enough straight from the drum, so check it before filling.
Frequently Asked Questions
What does 18/16/13 mean?
It means the oil has 1,300 to 2,500 particles per millilitre larger than 4 microns, 320 to 640 larger than 6 microns, and 40 to 80 larger than 14 microns. Each number maps to a range in the table above.
Is a lower ISO 4406 code always better?
Lower is cleaner, but there is a cost. Chasing a much cleaner target than the component needs wastes money on filtration. Use the OEM requirement and the machine criticality to set a sensible figure.
How often should I sample hydraulic oil?
Many sites sample critical hydraulic systems monthly to quarterly and less critical ones twice a year, and always after a major repair or filter change. Increase frequency when the trend rises or when the machine is critical to production.
How is ISO 4406 different from NAS 1638?
ISO 4406 gives a code for three size thresholds based on cumulative counts. NAS 1638 uses differential counts in size bands and a single class number. They cannot be converted exactly, so quote the standard used on the report.
If lab results live in spreadsheets, we can help bring them into your CMMS or ERP so out-of-target samples raise a work request. Ask for a short expert review.
Related Tools
Vibration Fault Signature Diagnosis Reference
A searchable lookup of what each common machine fault looks like in a vibration spectrum, with dominant frequency, direction and the first check to make.
Maintenance & ReliabilityInfrared Thermography Severity and Emissivity Reference
Quick lookup of temperature rise priorities for electrical thermography and typical emissivity values for common surfaces.
Maintenance & ReliabilityCondition Monitoring Program Readiness Checklist
A practical checklist for starting or auditing a condition monitoring program, from asset selection to closing the loop in the work order system.
Maintenance & ReliabilityCondition Monitoring Finding and Recommendation Report Template
A one-page report your analyst can send to the planner: what was measured, what it means, how urgent it is and what to do.
More Maintenance & Reliability tools
See all- TPM Autonomous Maintenance CIL Standard Template
- Condition Monitoring Alarm SQL Query Generator
- Condition Monitoring Trend and Time-to-Alarm Python Script Generator
- Predictive Maintenance Data Readiness Assessment
- MTBF and MTTR Worksheet
- TPM Autonomous Maintenance Standard Template
- TPM Pillars and Autonomous Maintenance 7 Steps Reference
- Preventive Maintenance Schedule Template
- Maintenance Work Order Template
Keep exploring
Free tools
- Hydraulic Oil ISO VG Viscosity Grade ReferenceA searchable table of ISO 3448 viscosity grades with the permitted cSt range at 40 C and the typical application where each grade is commonly specified.
- Oil Analysis Sample Log WorksheetAn editable log for oil samples with viscosity change calculated per row, water and iron readings, and an action column. Exports to Excel.
- ISO 14644-1 Cleanroom Particle Limits ReferenceMaximum allowable particles per cubic metre by ISO class and particle size, plus Fed Std 209E equivalent class names.
Guides
- How to Set Up ISO 9001 Workflows in SyteLineComplete guide to configuring ISO 9001:2015 quality management workflows in Infor SyteLine. Set up management review, internal audit, risk assessment, continual improvement, and process performance monitoring.
- How to Set Up Document Control in SyteLineGuide to implementing document control in Infor SyteLine. Configure document types, revision management, approval workflows, and distribution control for ISO 9001 and AS9100 compliance.
- How to Set Up Calibration Management in SyteLineGuide to configuring calibration management in Infor SyteLine. Set up gauge tracking, calibration schedules, out-of-tolerance handling, and traceability to NIST standards for ISO 10012 compliance.
AI on your ERP
- AI on Infor SyteLine for Oil and Gas Equipment ManufacturersAI on Infor SyteLine for oil and gas equipment: API Q1 and 6A traceability, MTRs, heat lots, ETO projects, and aftermarket parts. Private deployment.
- AI ERP for Oil and Gas Equipment Manufacturers: Heat Traceability, MTRs and AftermarketPrivate AI on your ERP for wellhead, valve, BOP and pressure equipment manufacturers: heat traceability, MTRs, NDE records, API Q1 and aftermarket service.
Manufacturing hubs
- National Fluid Power Association (NFPA): Fluid Power Manufacturers, Standards and ERPHow hydraulic and pneumatic fluid power manufacturers work in the National Fluid Power Association community: products, standards, ERP and private AI.
- Manufacturing in Austin and Central Texas: semiconductors and electronics hardwareAustin and Central Texas semiconductors and electronics hardware manufacturing: anchor companies, standards, ecosystem, ERP and quoting problems, and private AI on ERP.