Injection Molding Regrind Blend Cost Calculator
Runners, sprues and start-up scrap can go back into the process as regrind, which cuts the resin you buy. The question is how much saving it really gives, and whether you generate enough regrind to sustain a given percentage. This calculator answers both.
Your numbers
Labor, energy and granulator wear.
Runners, sprues, start-up purge and reusable scrap as a share of total throughput.
Your results
Savings ignore any property loss, extra scrap or customer limits on regrind. Many specifications cap regrind use and require approval.
Annual saving vs regrind percentage
Sweeps Regrind in the blend from 0 to 50, holding your other inputs fixed.
Model regrind and co-products in your ERP
Optional: a short conversation on tracking regrind lots and costs.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the resin you process in a year, the virgin price, your grinding cost and the handling cost for drying and testing regrind. Choose the regrind percentage you want in the blend and the share of throughput that you generate as reusable runner and scrap. The results show blended cost per kilogram, annual saving, regrind needed, regrind generated and whether you have a surplus or a shortfall.
- Set generation from real runner and purge weights.
- Count only reusable regrind, not degraded scrap.
- Check customer and spec limits on regrind.
The math
Regrind has a cost, grinding plus handling, so it is not free. Blended cost is virgin price times the virgin share plus regrind cost times the regrind share. The saving per kilogram is virgin price minus blended cost, and the annual saving multiplies that by the resin processed. Supply matters too: if you generate 12 percent of throughput as reusable regrind, a steady 20 percent regrind blend is not sustainable, because you would need to buy or hold extra regrind. In balance, the regrind share cannot exceed the share generated.
Reading the result
At the defaults, a 20 percent blend cuts the blended cost per kilogram by roughly forty cents and saves a six-figure sum per year on 200 tonnes, but the plant generates only 12 percent regrind, so the tool shows a shortfall. In practice, set the blend at or below the share you generate, and keep a separate allowance for resins where the specification or customer limits regrind to a lower share. The chart makes the linear nature of the saving clear: each added point of regrind gives the same increase.
Quality cautions
Every pass through the barrel can shorten polymer chains, change melt flow and lower impact strength, and hygroscopic resins pick up moisture in regrind. Keep regrind clean, labeled and dried, track by lot and resin grade, and test melt flow and mechanical properties when you raise the percentage. Medical, automotive and aerospace customers often limit or prohibit regrind, so confirm before you plan on it.
Frequently Asked Questions
How much regrind can I use in injection molding?
Many general purpose parts tolerate 10 to 30 percent, but the right limit depends on the resin, the part requirements and customer specifications. Test properties and confirm limits before raising the share.
Is regrind really free?
No. Grinding, handling, drying, testing and storage all cost money, and degraded properties can cost more in scrap. The saving is the virgin price minus those costs.
Why does my regrind run out?
A blend percentage cannot exceed the share of throughput you generate as reusable runners and scrap. If you plan for more, you will run out unless you buy regrind or reduce the blend.
Should regrind be dried?
For hygroscopic resins such as nylon, PET, PC and ABS, yes. Regrind can absorb moisture quickly because of its high surface area, so dry the blend to the supplier's recommended moisture level.
If your ERP does not track regrind as a co-product or recycled input, we can help model it so costs and lot traceability stay correct.
Related Tools
Injection Molded Plastic Part Cost Calculator
Build up the cost per good molded part from material, machine time, labor, scrap, secondary operations and tool amortization.
Industry TemplatesResin Drying Time and Temperature Reference
Typical drying temperature, time and maximum moisture for common injection molding resins, in a table you can search and export.
Industry TemplatesInjection Molding Shot Weight and Shot Size Calculator
Calculate total shot weight from part and runner volume, then check it against the barrel capacity and melt residence time.
Maintenance & ReliabilityInjection Mold Maintenance Checklist
A practical preventive maintenance checklist for injection molds, from daily checks at the press to full overhaul and storage.
More Costing & Finance tools
See all- Regrind Blend and Runner Share Calculator
- Injection Molding Resin Price Increase Impact Calculator
- Molded Part Quote Cost Build-Up and Margin Worksheet
- Injection Molding Job Costing Review Checklist
- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
Keep exploring
Free tools
- Regrind Blend and Runner Share CalculatorFind out how much of each shot is runner, how much regrind you make per hour, and whether your allowed blend ratio can absorb it.
- Injection Molding Resin Price Increase Impact CalculatorEnter part weight, runner, scrap, regrind reuse and old and new resin prices to see the per-part cost change, margin erosion, annual dollar impact and the price increase needed to hold margin.
- Injection Molding Process Sheet TemplateA fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
Guides
- Tracking Scrap, Runners and Regrind in Your Injection Molding ERPHow injection molders track scrap, runners and regrind in the ERP: reason codes, material reconciliation, regrind blend limits and costing the recovered resin.
- Best ERP for Injection Molders: What to Check Before You BuyWhat to look for in ERP for injection molders: mold and press tracking, resin lots, MES integration, scrap and regrind, and how DELMIAworks, Plex and Epicor compare.
- Injection Molding Job Costing: Finding Where Quoted Margin DisappearsHow injection molders find margin leaks: compare quoted and actual cycle, scrap, resin and downtime by job and part, and fix machine rates and overhead.
AI on your ERP
- AI on Infor SyteLine for Plastics Injection Molders: Presses, Molds, Resin and ScrapAI on Infor SyteLine for injection molders: mold and press scheduling, resin and regrind lots, scrap and cycle variance, on-prem and read-only by default.
- AI for DELMIAworks in Injection Molding: Resin, Molds, Presses and Scrap From Your Own DataPrivate AI on DELMIAworks for injection molders: resin and regrind, mold PM, press scheduling, scrap and cycle-time variance, read-only and on-prem.