Costing & FinanceFree calculatorPDF, Excel, Word exportPlastics and Injection Molding

Injection Molding Resin Price Increase Impact Calculator

A resin price letter lands and the first question from sales is how much to ask for per part. This calculator turns the new price per pound into cost per part, margin and annual dollars, using the real runner, scrap and regrind picture instead of the drawing weight alone.

Your numbers

g

Net weight of one molded part, from the part drawing or a weighed sample.

cavities
g

Total cold runner plus sprue weight per shot. Enter 0 for a hot runner mold.

%

Percent of parts molded that are rejected (start-up, defects).

80 %

Share of runner and scrap that is ground and run back in, displacing virgin resin.

$/lb

Delivered price per pound from your PO or last invoice.

$/lb
$/part

Machine time, labor, packaging, tooling amortization and overhead per part.

$/part
parts

Your results

Cost increase per part ($)
0.024
The per-part surcharge that would exactly pass the increase through at zero markup.
Annual profit impact
$14,429
Extra annual resin spend at this volume. Positive means cost up.
Shot weight
166
Part plus runner weight injected per cycle, in grams.
Resin processed per good part
42.7835
Grams processed per good part, including runner share and the extra parts needed to cover scrap.
Net virgin resin per good part (g)
38.9567
Gross grams minus the runner and scrap grams that come back as regrind.
Net virgin resin per part (lb)
0.0859
Grams divided by 453.592 grams per pound.
Resin cost per part, current ($)
0.0945
Resin cost per part, new ($)
0.1185
Resin price change
25.5%
Margin before
32.3%
Margin after
26.5%
Price needed to hold margin percent ($)
0.4555
Selling price that restores the original margin percentage. Holding margin dollars only needs the per-part increase.

Planning estimate. Assumes regrind displaces virgin resin one for one at the same price and that no regrind is sold or discarded. Add drying, color concentrate and additive cost to the resin price if they are bought per pound.

Free, optional. Reopen it on any device.
Save results:

Annual profit impact vs new resin price

Sweeps New resin price from 0.6 to 2.2, holding your other inputs fixed.

Resin cost exposure report from your ERP

Optional: we can sketch how to pull resin usage and part margin from your ERP so you see exposure per customer before the next price letter.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter the net part weight, cavity count and total runner weight per shot (zero for hot runner). Add your scrap rate and the share of runner and scrap you actually regrind and reuse. Then enter the current and new delivered price per pound and your cost and price per part. The primary results are the per-part cost increase and the annual dollar impact. The chart sweeps the new resin price so you can show a customer or a buyer what the exposure looks like at several quotes.

The math behind the numbers

Resin processed per good part is shot weight divided by cavities, divided by one minus the scrap rate. Anything above the net part weight is runner and scrap. A share of that comes back as regrind and offsets virgin purchases. Net virgin grams divided by 453.592 gives pounds per part, which is multiplied by price per pound. Margin is price minus resin minus all other cost, divided by price. To hold margin percent the price becomes cost divided by one minus the original margin percent.

  • Pounds per part = net virgin grams / 453.592
  • Annual impact = (new cost - old cost) x annual volume
  • Hold-margin price = (new resin + other cost) / (1 - old margin %)

Reading the result

With the defaults, a 25 percent resin increase is only about 2.4 cents on a 42 cent part, yet it moves margin by several points and costs over $14,000 a year at 600,000 parts. Notice two things. A hot runner mold and a low scrap rate shrink the exposure because less resin is processed per good part. And holding margin percent requires slightly more than holding margin dollars, because the cost increase is itself marked up. Decide which rule your customer contract allows before you quote.

Common mistakes

Using the drawing weight and ignoring the runner is the most common error on cold runner tools, and it understates cost by 5 to 25 percent. Others are assuming 100 percent regrind reuse when the customer limits it, mixing up price per pound and per kilogram, and forgetting that color masterbatch and additives are bought per pound too.

  • Check customer limits on regrind percentage (many medical and food parts allow none)
  • Use delivered price, not the ex-works quote
  • Update the price in your ERP item cost after the contract changes

Frequently Asked Questions

Why does a 25 percent resin increase not mean a 25 percent part cost increase?

Resin is only one cost element of a molded part, along with machine time, labor, packaging and tooling. If resin is about a quarter of the total part cost, a 25 percent resin increase raises total cost by roughly 6 percent. The calculator shows both numbers.

How is regrind handled?

Runner and scrap grams are assumed to be ground and reused in place of virgin resin at the percentage you enter. If your customer prohibits regrind or you sell it at a discount, set the slider to zero and adjust the other cost line for the sale value.

Should I pass through the increase per pound or per part?

Per part is simplest to administer and is what the calculator computes. A per-pound adjustment tied to a published index is fairer for long contracts, and the clause template in this tool set shows how to write it.

What resin price should I enter?

Use the delivered price per pound you actually pay, including freight, color concentrate and any additive. List prices or index values rarely equal your invoice price, and the difference changes the result.

If resin costs live in your ERP item master and PO history, Netray can build a read-only agent that flags every molded part whose margin drops below target when a resin index moves.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs