Resin Price Adjustment (Surcharge) Clause Template for Molded Part Supply Agreements
Fixed-price molded part contracts leave the molder exposed when resin moves, and customers worry about open-ended surcharges. A clear adjustment clause with a published index, a trigger band, a cap and notice protects both sides. This template gives you the clause text and the schedule to calculate each adjustment.
Fill in
Resin Price Adjustment Surcharge Clause Template
Resin Price Adjustment Clause
This clause forms part of Supply Agreement SA-2026-014 between Midwest Precision Molding Inc. (Supplier) and Northline Appliance Co. (Customer) and applies to PN 48213 Housing Cover, polypropylene.
The quoted price assumes a base resin price equal to the Base Index Price of 1.05 USD per pound for Polypropylene copolymer, 20 MFI, as published by Published monthly contract price assessment for PP copolymer, US Gulf, cents per pound (the Index). Resin weight per part including the allocated runner share is 0.469 lb.
Adjustment Mechanism
Quarterly, the Supplier will compare the average Index value of the preceding period with the Base Index Price. If the difference exceeds 3 percent of the Base Index Price in either direction, the part price will be adjusted for the following period by:
Adjustment per part = (Average Index - Base Index) x Resin weight per part
Adjustments apply in both directions. Changes within the trigger band do not adjust the price.
Notice, Cap and Effective Date
The Supplier will give the Customer 15 days written notice of each adjustment with the Index data and calculation. Any single adjustment will not exceed 5 percent of the then-current part price unless the parties agree otherwise in writing. This clause takes effect on 2026-11-01.
The Customer may audit the Index data and calculation on request. If the Index ceases to be published, the parties will agree a comparable index in good faith.
Calculation Schedule
| Period | Average Index (USD/lb) | Base Index (USD/lb) | Difference | Resin weight (lb) | Adjustment per part (USD) |
|---|---|---|---|---|---|
| Q1 | 1.05 USD per pound | 0.469 | |||
| Q2 | 1.05 USD per pound | 0.469 | |||
| Q3 | 1.05 USD per pound | 0.469 | |||
| Q4 | 1.05 USD per pound | 0.469 |
Acknowledgement
This template is a starting point, not legal advice. Have counsel review before use. Terms such as the index, trigger band, cap and review frequency are negotiable and should be balanced between both parties. Check whether your customer's purchasing terms already prescribe a material adjustment mechanism.
Automated resin surcharge calculation
Optional: see how index data and bill of material resin weight could drive surcharge invoices from your ERP.
Optional. The tool and every export work without this. No spam.
How to use it
Fill in the parties, agreement reference, part and resin grade, then the index you will reference, the base price embedded in your quote, the trigger band and the cap. Enter the resin weight per part including the runner share, because the adjustment is in pounds of resin consumed. Download as Word to paste into a supply agreement or purchase order terms, or attach as a pricing schedule. Use the resin price impact calculator to size the exposure before you propose the percentages.
Clause design
A workable clause names a published index the customer can check, sets the base price that is already inside the part price, and calculates the adjustment as index change times resin weight. A trigger band avoids constant small repricing, symmetric treatment makes the clause fair when prices fall, and a cap prevents large shocks. Notice and audit rights make the mechanism auditable.
- Index: a published, independent price assessment, not your supplier invoice
- Trigger band: commonly 2 to 5 percent of the base
- Frequency: monthly to quarterly, matching the index cycle
- Cap: limits shock; define what happens beyond it
Worked example
With a base of 1.05 dollars per pound, resin weight of 0.469 pounds per part and a quarterly average of 1.29, the difference is 0.24 dollars per pound, above the 3 percent band. Adjustment per part is 0.24 times 0.469, about 0.113 dollars. If the part price is 2.40, this is 4.7 percent and sits within the 5 percent cap. If the index drops back to 1.07, the change is within the band and the price returns to base only after the index falls below the trigger, per your drafting.
Common mistakes
Linking to a supplier invoice rather than a public index, forgetting the runner and scrap share in resin weight, writing the clause one way only so it never lowers the price, and not stating the base price. Also check that the clause does not conflict with a customer's own purchasing terms or a long-term price agreement.
Frequently Asked Questions
Which index should I reference?
Choose a published, independent assessment for your resin family that both parties can access, such as a monthly contract price report from a recognised market publisher. Avoid your own supplier invoice, which the customer cannot verify.
Why include a trigger band?
A band of a few percent stops the price changing with every small market move, which reduces administration for both sides. It also gives the customer predictability while still protecting the molder from larger swings.
Should the clause work both ways?
Yes. A symmetric clause that lowers the price when the index falls is easier to negotiate and is normally expected by procurement. It also keeps the relationship credible if prices turn.
Is this legal advice?
No. It is a generic starting point. Contract law and customer terms vary, so have counsel review the final language before you sign, especially for large programs or regulated industries.
Netray can help connect index data, resin usage and part prices in your ERP so surcharges are calculated and documented automatically each period.
Related Tools
Injection Molding Resin Price Increase Impact Calculator
Enter part weight, runner, scrap, regrind reuse and old and new resin prices to see the per-part cost change, margin erosion, annual dollar impact and the price increase needed to hold margin.
Costing & FinanceMolded Part Quote Cost Build-Up and Margin Worksheet
One row per part: enter weight, cavities, cycle time, resin price, press rate, tool cost and target margin. The sheet builds cost per 1,000 parts, quoted price and annual gross profit.
Compliance & ContractsTooling Ownership and Custody Agreement Template
A tooling agreement for molds, dies, fixtures and gauges that sit at a supplier, covering title, marking, maintenance, insurance and release on request.
Costing & FinanceQuote Assumptions and Exclusions Template
A fill-in page that states what a manufacturing quote includes, what it assumes and what it leaves out, ready to attach to the price.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist
Keep exploring
Free tools
- Raw Material Index Price Adjustment Clause CalculatorTest an index-linked price clause with a deadband, partial pass through and a cap before you agree to it.
- Injection Molding Resin Price Increase Impact CalculatorEnter part weight, runner, scrap, regrind reuse and old and new resin prices to see the per-part cost change, margin erosion, annual dollar impact and the price increase needed to hold margin.
- Injection Molding Process Sheet TemplateA fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
Guides
- Handling Resin Price Increases in Injection Molding QuotesHow injection molders handle resin price swings in quotes: index clauses, quote validity, material surcharges, pass-through rules and ERP price tracking.
- Injection Molding Production Scheduling: Matching Molds, Presses and ResinHow to schedule injection molding: match molds to presses by tonnage and shot size, plan changeovers and resin drying, and keep capacity honest with real cycle data.
- How to Quote Injection Molding Jobs FasterHow injection molders cut RFQ turnaround: standard cost build-up, cycle time and press selection rules, resin pricing, and where AI drafts quotes for review.
AI on your ERP
- AI on Infor SyteLine for Plastics Injection Molders: Presses, Molds, Resin and ScrapAI on Infor SyteLine for injection molders: mold and press scheduling, resin and regrind lots, scrap and cycle variance, on-prem and read-only by default.
- Epicor Kinetic AI for Injection Molders: Resin, Tooling, Scrap and Cycle Time Questions AnsweredPrivate AI on Epicor Kinetic for injection molders: query resin lots, tooling, scrap and cycle-time variance in plain English, with the query shown.