Load Shedding Downtime Loss Log Worksheet
Frequent power interruptions are a daily reality for manufacturers in several African countries, but few plants know what they cost per line. This log records each event and converts it into lost units, lost contribution and generator diesel.
| Date | Line or cell | Outage type | Hours stopped (h) | Hours on generator (h) | Units per hour | Contribution per unit | Diesel per hour (L) | Lost units | Lost contribution | Diesel used (L) | |
|---|---|---|---|---|---|---|---|---|---|---|---|
300 | R 11,400 | 0 | |||||||||
150 | R 900 | 36 | |||||||||
480 | R 18,240 | 0 | |||||||||
42 | R 17,220 | 0 | |||||||||
300 | R 1,800 | 54 |
Diesel cost is shown in litres so you can multiply by your current price. Use the contribution per unit (price less variable cost), not the full selling price, so the loss is not overstated.
Capture downtime from the shop floor
Optional: we can show how outage reasons feed ERP production orders.
Optional. The tool and every export work without this. No spam.
How to use the log
Add a row for each outage or generator event. Enter the line, the hours it stopped, the hours it ran on generator, its normal output per hour, the contribution per unit and the generator's diesel burn per hour. The sheet calculates lost units, lost contribution and litres used. Review weekly and export to Excel for management reporting.
- Use actual stop and start times from the shift report
- Record generator hours separately from stopped hours
- Use contribution margin, not selling price
- Tag the cause so you can compare grid and equipment faults
Method
Lost units are hours stopped times the normal rate. Lost contribution multiplies that by the contribution per unit, which is selling price less variable cost. Diesel used is generator hours times consumption per hour. The summary divides total lost contribution by total stopped hours, giving a cost per stopped hour that you can compare against the cost of running a generator or installing solar and storage.
Reading the result
In the sample data, the press line and the CNC cell account for most of the lost contribution even though packing is stopped more often, because contribution per hour differs. Prioritise backup power on the lines with the highest contribution per hour, not simply those with the most interruptions.
Common mistakes
Plants often count partial hours loosely, ignore the restart and warm up time after an outage, or value lost output at full price. Where scrap or rework follows an abrupt stop, record it separately in your quality system. In an ERP, outage events can be posted as downtime reasons on production orders for later analysis.
Frequently Asked Questions
How is lost contribution calculated?
Hours stopped times output per hour times contribution per unit. Contribution is price minus variable cost, so fixed overhead is excluded and the loss is not overstated.
Does it include diesel cost in money?
It shows litres, so you can apply your current diesel price. This avoids baking an out of date price into the log.
Can I use it for non-African plants?
Yes. Any plant that suffers power interruptions can use the same method. The title refers to load shedding because that is how many African plants describe the problem.
Can I share it with my team?
Export to Excel or CSV and share the file. The page itself does not store your data.
If you want outage and downtime reasons captured from the shop floor into your ERP automatically, Netray can discuss how to wire that in.
Related Tools
Local Content Supplier Tracker Worksheet for Africa
An editable worksheet that tallies spend with local, regional and imported suppliers and reports the local content percentage of your purchases.
Country & TaxSouth Africa SDL and UIF Payroll Levy Worksheet
An editable payroll worksheet that applies the UIF earnings ceiling and the SDL rate to each employee and totals what the employer must declare.
Country & TaxAfrican Manufacturer Customs Clearance Document Checklist
A grouped checklist of documents, data and controls to prepare before a manufacturing consignment is cleared into or out of an African country.
Country & TaxNigeria Withholding Tax Schedule Worksheet
An editable worksheet to list supplier payments, apply a withholding rate per line, and total the tax to remit with a schedule you can export to Excel.
More Discrete Manufacturing tools
See all- Africa Factory Power Resilience Assessment
- OEE Calculator (Overall Equipment Effectiveness)
- Scrap Rate Cost Calculator
- Takt Time Calculator
- Cycle Time & Capacity Calculator
- Inventory Carrying Cost Calculator
- Economic Order Quantity (EOQ) Calculator
- MRP Nervousness Assessment
- Production Scheduling Maturity Assessment
Keep exploring
Free tools
- Load Shedding Generator Cost CalculatorWork out what running a diesel generator during outages costs per kWh and per year, and the premium over the grid.
- Load Shedding Cost Calculator for ManufacturersPut a monthly rand figure on power outages: generator fuel, maintenance, idle labour and the contribution you could not produce.
- Machine Downtime Log TemplateA printable downtime log with loss categories mapped to the six big losses, ready for operators to fill in by hand or in Excel.