MES & Shop FloorFree worksheetPDF, Excel, Word exportDiscrete Manufacturing

Micro Stop Log Worksheet for Short Stoppages

Short stops are the loss that rarely appears in a downtime report, because nobody opens a work order for a ten second jam. Together they can cost more output than a few long breakdowns. This log gives operators a simple way to count them by cause and convert the count into lost minutes.

Free, optional. Reopen it on any device.
Download:
Time windowMachineCauseSeconds per stop (s)Number of stopsTotal secondsLost minutes
150
2.5
120
2
198
3.3
220
3.6667
150
2.5
Total stops
29
Total lost minutes
13.9667
Average stop length
28.9
Seconds per stop, across all rows.

Use a consistent threshold for what counts as a micro stop, for example any stop under five minutes that the operator clears without maintenance help. Record counts by tally mark on the line and enter them at the end of each hour.

Capture stops automatically

Optional: a short review of how machine signals could feed a stop log through your MES or ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the log

Place a printed copy of the cause list at the machine and have the operator make tally marks during the shift. At the end of each hour, enter the time window, the machine, the cause, the average seconds per stop and the number of stops. The sheet multiplies the two to give lost seconds and minutes, and the summary shows the total number of stops and the average length. Review the log with the team at the shift start meeting, and pick the top cause for a root cause session.

Why micro stops matter

In most OEE conventions, stops below a set threshold are not counted as downtime but as a reduction in speed, so they show up in the performance factor. That is why a line can report high availability and still run well below its ideal rate. Logging them separates the true cause of the performance loss from slow running, which needs a different fix such as machine tuning or a revised standard rate.

  • Typical threshold: under five minutes, no maintenance call
  • Count of stops matters as much as duration
  • Frequent stops often point to a small upstream defect

Reading the numbers

Sort the causes by lost minutes and also by count. A cause with many very short stops, like a feed jam, is usually a design or setup issue, while a cause with few long stops may deserve a downtime work order. Compare the average stop length with the cycle time: if the average stop is shorter than a few cycles, automatic recovery or a better sensor may remove it. Track the weekly total to see whether fixes hold.

Common mistakes

The usual failure is a cause list that is too long, so operators pick Other. Keep nine or fewer categories and review Other every week. Another mistake is mixing micro stops into the formal downtime log, which double counts the loss. Decide which log owns each event, write the rule on the sheet, and keep it the same across shifts so comparisons are fair.

Frequently Asked Questions

What counts as a micro stop?

There is no universal rule. Many plants use any stop shorter than about five minutes that the operator clears without a maintenance call. Choose a threshold, write it on the sheet, and apply it consistently so trends are comparable.

Do micro stops affect availability or performance in OEE?

Under the common convention they reduce the performance factor, because the machine was scheduled and technically running. If you count every stop as downtime, they reduce availability instead. Either is valid when applied consistently.

How often should operators enter data?

Tally during the hour and enter once per hour or at least once per half shift. Entering from memory at the end of a shift loses detail and tends to under count small stops.

Can I export this log?

Yes. Export to Excel, CSV or PDF at any time. The calculations run in your browser and nothing is stored on a server.

If your machines already send counts and stop signals to an MES or ERP, we can turn that signal into this log without manual tallying.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

Integrations

Troubleshooting