Free MES & Shop Floor tools

150 templates, calculators, worksheets and reference tables. Each runs in your browser and exports to PDF, Excel, Word or CSV.

Templates and forms

Plex Smart Manufacturing Data Source Request Template

A fill-in specification for requesting or documenting a Plex data source so analysts, IT and plant owners agree on fields, filters and refresh.

Plex Go-Live Readiness Sign-Off Template

Go or no-go document for a Plex site rollout covering data, training, integrations, shop floor hardware, support and rollback, with sign-off lines.

Shop Traveler Template

Generate a printable job traveler with job header, material, routing steps, inspection points and sign-off lines. Export to PDF, Word or Excel.

Routing Accuracy Audit Template

A document template to audit ERP routings against the real process: sequence, work center, setup and run time, tooling and yield.

Production Schedule Template

Generate a printable weekly production schedule with jobs, setups, due dates, assumptions, risks and sign-off lines.

Shift Handover Production Log Template

Fill in output, downtime, holds and open issues and download a shift handover note for the next supervisor.

Production Planning Meeting Agenda and Minutes Template

A ready agenda and minutes sheet for the weekly production planning meeting, with an action table and sign-off.

Overtime Request and Approval Form Template

A one page form that ties overtime to specific jobs, hours and cost so it can be approved quickly and reviewed later.

Hot Job Expedite Request Form Template

Make expedites a decision with a cost: record the job, the reason, which jobs get delayed and who approved it.

Production Schedule Change Request Form Template

A form to request, assess and approve changes inside the frozen window of a production schedule, with capacity impact and sign-off.

Schedule Freeze Window and Change Control Policy Template

A fill-in policy that defines frozen, slushy and open schedule zones, who can change them and how exceptions are logged.

Shift Production Report Template

A fill-in shift report covering output versus target, scrap, downtime, safety, staffing and handover notes, exported as a ready to print document.

Machine Downtime Log Template

A printable downtime log with loss categories mapped to the six big losses, ready for operators to fill in by hand or in Excel.

OEE Improvement Action Plan Template

A one-document plan for an OEE project: baseline, target, top losses, actions with owners and dates, and the review rhythm.

CNC Setup Sheet Template

A fill-in CNC setup sheet covering job data, work offsets, workholding, tools and operator notes, with PDF, Word and Excel export.

CNC Lathe Setup Sheet Template

A printable lathe setup sheet covering workholding, stickout, tool stations, offsets and first-piece checks, so the next operator can repeat the job.

Welding Production Daily Report Template

Summarize each shift of welding: crew, joints completed, hours, consumables used, delays and quality issues, in a clean exportable report.

Molding Shift Production Report Template

A shift report for a molding department capturing output, downtime, scrap and issues for the next shift.

Molding Process Window Study Record Template

A fill-in record for the approved process and a low, nominal, high process window study on a mold and machine combination.

Optical Assembly Build Traveler Template

Printable traveler for optical and laser module assembly: operations, cleanroom conditions, alignment checks and sign-offs.

Wafer Fab Process Traveler Template

A fill-in lot traveler for wafer processing with operation table, hold points, deviations and sign offs.

Plating Line Process Card and Traveler Template

Fill in a plating traveler with part, specification, process steps, thickness and adhesion checks, bake record and sign-offs, then export.

Build to Print Inspection Plan Template

A fill-in inspection plan for a build-to-print job with a characteristic table, gage selection, sampling and reaction plan, ready to export for the router or customer.

Infor Factory Track Private AI Layer Blueprint Generator

Fill in your Infor Factory Track version, database, hosting and use cases and get a shareable architecture plan for a private AI layer.

AVEVA PI System Private AI Layer Blueprint Generator

Fill in your environment and get an architecture plan for a private AI assistant on AVEVA PI System: components, security controls, rollout phases and open questions for IT.

AVEVA System Platform and Historian Private AI Layer Blueprint Generator

Fill in your environment and get an architecture plan for a private AI assistant on AVEVA System Platform and Historian: components, security controls, rollout phases and open questions for IT.

Rockwell FactoryTalk Private AI Layer Blueprint Generator

Fill in your environment and get an architecture plan for a private AI assistant on Rockwell FactoryTalk: components, security controls, rollout phases and open questions for IT.

Ignition SCADA Private AI Layer Blueprint Generator

Fill in your environment and get an architecture plan for a private AI assistant on Ignition SCADA: components, security controls, rollout phases and open questions for IT.

Siemens Opcenter Execution Private AI Layer Blueprint Generator

Fill in your environment and get an architecture plan for a private AI assistant on Siemens Opcenter Execution: components, security controls, rollout phases and open questions for IT.

GE Proficy Private AI Layer Blueprint Generator

Fill in your GE Proficy environment and get a shareable architecture plan for a private, read-only AI layer: components, controls, rollout and open questions.

Kepware and OPC UA Private AI Layer Blueprint Generator

Fill in your Kepware and OPC UA environment and get a shareable architecture plan for a private, read-only AI layer: components, controls, rollout and open questions.

Custom MES on SQL Server Private AI Layer Blueprint Generator

Fill in your Custom MES on SQL Server environment and get a shareable architecture plan for a private, read-only AI layer: components, controls, rollout and open questions.

SCADA Alarm and Event Log Private AI Layer Blueprint Generator

Fill in your SCADA Alarm and Event Log environment and get a shareable architecture plan for a private, read-only AI layer: components, controls, rollout and open questions.

Worksheets

Infor VISUAL Shop Labor Ticket Log Worksheet

An editable log of labor entries by work order operation with hours, rate, setup versus run and computed labor cost.

Plex Downtime Reason Log and OEE Worksheet

Editable shift log of planned time, downtime, parts made and scrap that computes availability, performance, quality and OEE per workcenter.

Job Shop On-Time Delivery Tracker Worksheet

An editable tracker that computes days late per job and the shop on-time delivery rate from promised and actual ship days.

Line Balancing Worksheet

Fill in work content per station against takt time and see load percent, idle seconds, balance efficiency and balance delay for an assembly line.

SMED Changeover Reduction Worksheet

Break a changeover into elements, classify each as internal or external, set a target time and see the machine downtime you can remove.

Finite Capacity Scheduling Worksheet

Load jobs against a work center with setup, run time and available hours per day, and see the hours and days of work you are committing.

Daily Production Schedule Board Worksheet

An editable job board that totals setup and run hours per line so a scheduler can see whether the day fits the shift.

Changeover Sequence Planning Worksheet

List jobs in running order with setup and run minutes to see how much of the day is lost to changeovers and compare sequences.

Schedule Adherence Tracking Worksheet

Record planned and actual units per day with the miss reason to measure schedule attainment and find the biggest cause of misses.

Critical Ratio Job Sequencing Worksheet

Rank open jobs by critical ratio and slack so the most behind jobs run first. Editable table that exports to Excel.

Six Big Losses OEE Worksheet

An editable worksheet that records the six big losses per line and shift in minutes, computes OEE per row and totals each loss as a share of planned time.

SMED Changeover Analysis Worksheet

Break a changeover into steps, mark what can move outside machine stoppage, and total the minutes you recover.

Micro Stop Log Worksheet

Tally minor stops by cause on the line, convert them to lost minutes, and export a clean log for OEE analysis.

OEE Loss Pareto Worksheet

Enter losses by reason code, get minutes per event and totals, and use the list to pick the next improvement target.

Run Rate and Cycle Time Study Worksheet

Time three cycles per part, compare against the standard cycle, and see the speed percentage that drives the OEE performance factor.

Standard Work Combination Sheet Worksheet

Record each work element with manual, machine and walk times and get the operator's total cycle time to compare with takt.

CNC Tool List and Offset Log Worksheet

An editable tool list that tracks tool numbers, holders, stick-out and offsets, and flags the net wear on each tool.

CNC Tool Life Tracking Log Worksheet

An editable log of tool life in parts and cutting minutes, with tool cost per part so you can set change intervals.

Turning Insert Tool Life Log Worksheet

Track how many parts each insert edge produces, why edges were changed, and the resulting tooling cost per part.

Drilling Feeds and Speeds Planning Worksheet

List each hole with surface speed, feed per revolution and depth, and get RPM, feed rate and drilling time per hole automatically.

Lathe Tool Offset Record Worksheet

Keep a written record of geometry and wear offsets per turret station so you can rebuild a setup or spot tools that drift.

Turning Speeds, Feeds and Cycle Time Setup Sheet

An editable operation table that computes rpm, feed rate and cutting time per pass and totals the part's cutting time.

Mold Changeover Time Log Worksheet

Log each mold change by phase, total the minutes and see which jobs miss your changeover target.

Scientific Molding Viscosity Curve Worksheet

Log a rheology (viscosity curve) study at several injection speeds and see relative viscosity and shear rate index calculated per run.

Heat Treatment Furnace Load Worksheet

Build a furnace load sheet row by row: pieces, unit weight, section thickness and process, with total load weight and a planning soak time.

SMT Line Balancing Worksheet

List each SMT line station with its cycle time and see the bottleneck, line UPH and balance efficiency.

SMT Line Changeover and Feeder Setup Worksheet

Plan the daily SMT schedule with changeover, feeder setup and run time per job so you can see true line utilization.

Fab Step Cycle Time and X-Factor Worksheet

An editable route worksheet that adds queue, process and move time per step, calculates X-factor and flags the steps where lots wait longest.

Apparel Time and Action (TNA) Calendar Worksheet

An editable time and action plan that lists order milestones, owners, planned and actual days, and shows total delay.

Print Press Run Log Worksheet

An editable run log that computes total waste, waste percent and average run speed for every job on the press.

Packaging Line Downtime and OEE Log Worksheet

A shift-by-shift log that computes availability, performance, quality and OEE for each packaging line.

Injection Molding Press Selection Worksheet (Tonnage and Shot Utilization)

List each mold with projected area, cavities, cavity pressure and the press you plan to use. The sheet computes required tonnage, clamp utilization and shot utilization for every row.

Bearing Replacement and L10 Life Schedule Worksheet

List the bearings on your drives with load, speed and catalog rating, and the sheet computes L10 life in hours against the life you need.

Prepreg Out-Time Tracker Worksheet

Track every freezer exit and return per prepreg roll, with cumulative out-time, remaining out-life and percent used calculated for you.

Converting Line Roll Waste Reconciliation Worksheet

Reconcile input footage against good output, makeready, trim and rejects per job, and see unaccounted loss, yield percent and the dollar cost of waste.

Manufacturing Capacity Planning Template (Excel)

An editable capacity plan by work center. Enter machines, shifts, efficiency and load hours; see utilization and overload automatically and export to Excel.

Manufacturing Daily Production Report Format

An editable daily or shift production report by machine, with planned and good quantity, scrap, downtime and labor, plus calculated yield and plan attainment.

Manufacturing Production Report Format (Excel)

An editable production report: enter planned time, downtime, ideal rate, produced and good units per shift and line, and get OEE per row.

Calculators and simulators

Oracle Fusion OEE Work Center Calculator

Calculate overall equipment effectiveness for a work center from production reporting figures, and see how downtime moves OEE.

VISUAL Shop Load Versus Capacity Calculator

Enter load hours and shift pattern for a work center to see utilization, overload hours and the weeks needed to clear the backlog.

VISUAL Shop Resource Capacity and Load Calculator

Find available capacity hours, load percentage and the number of machines needed for a work center, plus an efficiency sweep.

OEE Calculator for Plex and MES Data

Compute overall equipment effectiveness and its three factors from a shift or day of production data, and see how rejects move the result.

Takt Time and Machine Count Calculator

Convert monthly demand, shifts and breaks into takt time, then find how many machines are needed at your cycle time and OEE.

Job Shop Setup Cost and Minimum Lot Size Calculator

See how setup cost is absorbed as lot size grows, and find the smallest order that breaks even or keeps setup under a chosen share of price.

Odoo Work Center Capacity Calculator

Work out how many units a work center can make per week and how loaded it is, using the same fields you enter in Odoo: capacity, time efficiency, OEE target, setup and cleanup.

WIP Cash Tied Up Calculator Using Little's Law

Estimate how much cash sits in work in process from output rate and flow time, and what a shorter flow time would release.

Bottleneck Analysis Calculator

Enter process time, machine count and OEE for three resources, then see weekly capacity, which one is the bottleneck, and how utilization rises with demand.

Drum Buffer Rope Buffer Sizing Calculator

Start from touch time and lead time, apply a buffer percentage, and get the buffer in hours and days, the three buffer zones and the expected WIP in front of the constraint.

Production Schedule Adherence Calculator

Measure how well the floor followed the plan: schedule attainment, on-time job completion, missed jobs and schedule stability after expedites.

Overtime vs Added Shift Cost Calculator

Compare the weekly cost of covering a machine-hour shortfall with overtime against running an extra shift.

Little's Law WIP and Lead Time Calculator

Turn work in process and daily throughput into average lead time, flow efficiency and the WIP cap needed to hit a lead time goal.

Minimum Batch Size and Setup Cost Calculator

Find what each changeover really costs and the smallest batch that keeps setup cost below a chosen share of unit cost.

Overtime vs Extra Shift Cost Calculator

Compare weekly overtime cost with the cost of running an extra crew when production is short of hours.

Queue Time vs Utilization Calculator (Kingman Formula)

Estimate average queue time at a work center from utilization, arrival variability and process variability.

Job Run Time and Completion Date Calculator

Estimate how many hours and calendar days a production order needs on one machine, given rate, OEE, setup and shift pattern.

Constraint Product Mix Throughput Calculator

Rank two products by throughput per bottleneck minute and see the best weekly mix when constraint time is limited.

Critical Ratio Dispatch Calculator

Enter days to due date, remaining work and operations left to get critical ratio, slack and the expected lateness for one job.

TEEP Calculator (Total Effective Equipment Performance)

Calculate TEEP from calendar time, scheduled time, downtime and production counts, and see how much capacity is hidden outside the schedule.

OEE World Class Gap Simulator

Enter your current availability, performance and quality, set a target, and see the OEE gap in points, units and margin per year.

SMED Changeover Reduction Calculator

Estimate the annual hours and cost recovered by moving setup work outside machine stoppage and trimming the rest.

OEE Improvement Payback Calculator

Convert a planned OEE improvement into extra units, margin, payback and ROI so the project can be funded on numbers.

Speed Loss and Micro-Stoppage Calculator

Separate the performance loss in OEE into reduced speed and minor stops, and see the parts each one costs per shift.

Bottleneck Improvement Throughput Gain Calculator

Find the real system throughput and annual value from improving the constraint, including when the next resource takes over.

Line Balancing Efficiency Calculator

Enter station cycle times and takt time to find the bottleneck, balance efficiency, balance delay and the theoretical minimum number of stations.

Pitch Interval Calculator

Calculate takt time and pitch (takt times pack-out quantity) to set the rhythm of production control and material withdrawal.

Lean Cell Operator Staffing Calculator

Work out how many operators a cell needs at a given takt time, allowing for walking time and personal allowances, and see utilization.

CNC Drilling Cycle Time Calculator

Calculate spindle speed, feed rate and total time for a drilling job with peck cycles, and see how peck depth affects time.

Constant Surface Speed G96 Spindle RPM Calculator

See what rpm your lathe will actually run under G96 as the diameter shrinks, where the spindle speed limit kicks in, and how long a facing cut takes.

Injection Molding OEE Calculator

Calculate availability, performance, quality and overall equipment effectiveness for a molding press from a shift or day of production data.

Cutting Speed to RPM and Feed Rate Calculator

Convert surface speed in m/min to spindle RPM and SFM, then calculate milling feed rate and material removal rate from tooth count and chip load.

Fab Equipment Utilization Calculator (SEMI E10 Style)

Break tool time into SEMI E10 style states and calculate availability, utilization and throughput efficiency.

Automotive Line Rate and Capacity Calculator

Convert cycle time, shifts and OEE into annual capacity, then compare to customer demand to get utilization, takt time and the OEE you need.

Required OEE for OEM Volume Calculator

Back solve the OEE a cell needs to deliver a customer volume plus flex, and see the headroom or shortfall at your current OEE.

Sewing Line Balancing Calculator

Calculate takt time, required operators, line balance efficiency and daily output for a sewing line from SAM and bottleneck time.

Garment SAM Daily Output and Labor Cost Calculator

Turn style SAM, operators, hours and line efficiency into daily output, labor cost per piece and days to complete an order.

China Golden Week Production Capacity Calculator

Estimate how many units a Chinese plant can really make across the Golden Week period and how much to pre-build or order early.

Turning Tool Wear Cost per Part Calculator

Use Taylor tool life, insert price and tool change time to get wear cost per part and find the speed that minimizes total cost.

CNC Turning Cycle Time and Metal Removal Rate Calculator

Calculates spindle rpm, passes, cutting time, metal removal rate and parts per hour for an OD turning operation, with a surface speed sweep.

Turning Insert Tool Life and Tool Cost per Part Calculator

Applies the Taylor tool life equation to show how cutting speed changes tool life, tooling cost per part, tool change cost and total cost per part.

Laser Cut Cycle Time Calculator (Perimeter, Pierces, Traverse)

Builds a per-part laser cycle time from cut length, pierces, non-cut traverse and sheet load time, then converts it to cost and parts per hour.

Rubber Cure Time and Press Cost Calculator

Scales a known cure time to a new thickness and mold temperature, builds the full press cycle, and returns parts per hour and machine plus labor cost per part.

Wire Harness Assembly Labor Time Calculator

Build up harness labor minutes from operation counts and time standards, apply efficiency and difficulty, and see how setup spreads across lot size.

Quote Turnaround Time KPI and Queue Calculator

Model how RFQ volume, quoting effort and estimator headcount drive utilization, queue wait and turnaround days.

Medical Device Lot Start Quantity and Rolled Yield Calculator

Multiplies step yields and sterilization loss into a rolled yield, then solves for the start quantity needed to ship the order plus retains and an overage cushion.

Induction Furnace Melt Energy Cost Per Ton Calculator

Calculate kWh per ton, energy cost per ton, melt loss cost and refractory for an induction heat, with a sweep on furnace efficiency.

Multi-Pass Weld Pass Count and Arc Time Calculator

Turn groove area, bead size and travel speed into pass count, arc time, interpass wait and filler needed for a joint.

Autoclave Cure Cycle Time and Capacity Calculator

Compute autoclave cycle time from ramp rates, dwell holds and cooldown, then convert it to runs and parts per week for capacity planning.

Slitter Rewinder Master Roll Trim Waste Calculator

Work out how many slit rolls come off a master roll, the edge trim waste and how many masters to pull for a customer order.

AM Parts per Build Plate Nesting Calculator

Grid nesting estimate for AM build plates with spacing, edge margin and practical nest efficiency, plus packing density and annual machine hours.

Infor Factory Track AI Assistant Sizing and Value Calculator

Size the GPUs and estimate the monthly value and payback of an on-prem AI assistant for Infor Factory Track users.

AVEVA PI System AI Assistant Sizing and Value Calculator

Estimate peak concurrency, GPU count, index size, hours saved and payback for a private on-prem AI assistant on AVEVA PI System.

AVEVA System Platform and Historian AI Assistant Sizing and Value Calculator

Estimate peak concurrency, GPU count, index size, hours saved and payback for a private on-prem AI assistant on AVEVA System Platform and Historian.

Rockwell FactoryTalk AI Assistant Sizing and Value Calculator

Estimate peak concurrency, GPU count, index size, hours saved and payback for a private on-prem AI assistant on Rockwell FactoryTalk.

Ignition SCADA AI Assistant Sizing and Value Calculator

Estimate peak concurrency, GPU count, index size, hours saved and payback for a private on-prem AI assistant on Ignition SCADA.

Siemens Opcenter Execution AI Assistant Sizing and Value Calculator

Estimate peak concurrency, GPU count, index size, hours saved and payback for a private on-prem AI assistant on Siemens Opcenter Execution.