Wire Harness Voltage Drop and Power Loss Calculator by AWG
Long wire runs on vehicles, shelters and aircraft quietly consume supply voltage and turn it into heat. This calculator gives the voltage drop, percentage loss and I squared R heating for a copper run by gauge.
Your numbers
Solid copper DC resistance at 20 C. Stranded wire is slightly higher; use the wire spec value for final design.
Length from source to load; the return path is added automatically.
For example 28 V DC aircraft or vehicle bus.
Copper resistance rises about 0.39 percent per degree C above 20 C.
Your results
DC resistance estimate for copper. It does not cover ampacity, bundle derating, altitude, insulation temperature rating or connector and contact resistance. Use the applicable wire specification and your harness design rules for current ratings.
Voltage drop vs one-way length
Sweeps One-way run length from 1 to 100, holding your other inputs fixed.
Harness and BOM data in one private search
Optional: discuss making wire lists, BOM and ECO history searchable inside your network.
Optional. The tool and every export work without this. No spam.
How to use it
Select the wire gauge, enter load current and one-way length, then supply voltage and conductor temperature. The tool doubles the length to include the return conductor, applies a temperature correction to copper and returns the drop in volts and percent, the load voltage, the wire heating loss and the longest run that stays within your allowed drop. Use the chart to compare how drop grows with length.
- Enter one-way length; do not double it yourself.
- Use hot conductor temperature for worst case.
- Set the allowed drop from your interface requirement.
The formulas
Resistance equals the wire resistance per 1000 ft times round trip length divided by 1000, corrected for temperature with R(T) = R20 x (1 + 0.00393 x (T - 20)) for copper. Voltage drop is I x R and wire loss is I squared x R. The AWG resistances used are standard values for bare copper at 20 C. Real wire to a military wire specification may be tin or silver plated and stranded, so check the specification resistance.
Worked example
A 5 A load on 25 ft of AWG 18 at 28 V has round trip resistance 6.385 x 50 / 1000, or 0.319 ohm. Drop is 1.6 V, about 5.7 percent of supply, and the wire dissipates 8 W. If the budget is 3 percent, the longest run is about 13 ft, or you can move to AWG 14 which cuts the drop to roughly 0.63 V. Voltage drop is separate from the current carrying limit, so always check ampacity too.
Common mistakes
Using only the one-way length is the classic error and halves the answer. Others ignore connector and splice resistance, which can add as much drop as several feet of wire in a harness with many mating pairs. For AC or high frequency, inductance and skin effect change the picture. For safety, size wire for both ampacity and voltage drop and take the worse case.
Frequently Asked Questions
Why is the length doubled?
Current flows out on the supply conductor and returns on the ground or return conductor, so the voltage drop includes both. If a chassis return is used, replace the return length with the chassis path resistance.
Does temperature matter?
Yes. Copper resistance increases about 0.39 percent for each degree C above 20 C, so a hot harness drops more voltage than the table value. Use worst-case conductor temperature.
Is this the same as wire ampacity?
No. Ampacity is limited by heating, insulation rating, bundle size and altitude. A wire can satisfy voltage drop and still be overloaded thermally, so check both limits.
What allowed drop should I use?
Use the figure in your interface control document, power budget or customer specification. Many designs allow only a few percent in distribution wiring, but there is no universal value.
If harness definitions and wire lists live in PLM and ERP systems, Netray can discuss how to make that data searchable and traceable on your own infrastructure.
Related Tools
Electronic Component Junction Temperature Derating Calculator
Find junction temperature and thermal headroom against a derated limit, and sweep power to see where a part runs out of margin.
Supply Chain & InventoryDMSMS Last Time Buy Quantity and Cost Calculator
Calculate how many parts to buy when a component goes end-of-life, what it costs to hold them, and when a redesign becomes cheaper.
Quality & InspectionPCBA Rework Cost Tracking Worksheet
Log rework events by work order, defect type, time and material, and get rework cost per line and per board.
More Engineering & PLM tools
See all- PCB Trace Width and Current Capacity Calculator (IPC-2221)
- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
- SAP Engineering Change Affected Materials Impact Worksheet
Keep exploring
Free tools
- PCB Trace Resistance and Voltage Drop CalculatorCompute DC resistance, voltage drop and I squared R loss for a copper trace including the temperature coefficient of copper.
- EV Busbar Weight, Cost and Power Loss CalculatorSize a rectangular copper or aluminum busbar for weight, blank cost, resistance, voltage drop and resistive loss at a given current.
- Wire and Cable Length Cost Calculator for Harness BuildsTurn finished wire length, twist take-up and scrap into feet per harness, reels to buy and wire cost per unit and per lot.
Guides
- How to Quote a Wire Harness From a Customer DrawingStep-by-step wire harness quoting: read the drawing, build the BOM, price wire and connectors, time every termination, and add NRE, test and scrap.
- Wire Harness Costing: Copper Prices, Scrap and Protecting MarginHow to cost wire harnesses so margin survives copper swings, connector price changes, scrap and rework: standard vs actual cost, surcharges and repricing.
- ERP for Cable Assembly and Wire Harness Manufacturers: What to RequireWhat a cable assembly or wire harness shop needs from ERP: BOM by drawing revision, wire by the foot, lot traceability, kitting, and test records.