MRPeasy vs Katana: Which Cloud MRP Fits Your Shop?
Small manufacturers often shortlist MRPeasy and Katana because both are cloud based and priced for small teams. They are built around different assumptions, so the right choice depends on how you sell and how you make things. This scorecard turns ten practical questions into a fit score.
1. How do most of your orders arrive?
Order channel shapes how much integration you need to storefronts versus manual quoting.
2. How complex are your routings?
3. How many active SKUs and BOM levels do you manage?
4. How do you plan material purchases today?
5. Do you need shop floor tracking by operation and worker?
6. Do you need capacity planning against machines or people?
7. How important are lot or serial traceability and quality records?
8. How many people will use the system daily?
9. Which accounting and sales tools must connect?
Check current integration lists on each vendor site before deciding.
10. How soon do you need to be live?
How to use the scorecard
Answer each question for how your business operates today, not for the company you hope to be in three years. Higher scores mean you need more planning depth, routing control and shop floor tracking. Lower scores mean you mostly need stock control, sales orders and simple manufacturing orders tied to a storefront. The result is a direction, not a verdict, because vendors change features and tiers often. Use it to decide what to test in trials.
- Answer as a team: operations, purchasing and finance often disagree on routing complexity.
- Use real order and BOM counts rather than estimates.
- Save the result and repeat it before renewal.
What separates the two styles of tool
Katana style tools centre on live inventory, sales order to manufacturing order flow and connections to online stores and accounting. MRPeasy style tools lean toward classic MRP: routings with work centers, time-phased purchasing suggestions, capacity planning and shop floor reporting. Neither description is absolute, and both vendors keep adding features, so treat the differences as tendencies and verify in a live demo. Feature names, limits and pricing tiers change, so confirm each against the vendor's current documentation.
A worked example
A candle maker selling through a web store, with one-step pouring and 150 SKUs, scores around 10 to 20 percent. A lighter tool is probably enough. A machine shop with six-step routings, outside plating, lot traceability for aerospace customers and 12 daily users scores above 80 percent and needs real routings, scheduling and quality records. A contract assembler in between scores near 50 percent and should run a two-week trial in each product using one real job before choosing.
Common mistakes when comparing cloud MRPs
Teams compare feature lists rather than workflows. Plan one complete order end to end: quote, sales order, material shortage, purchase order, receipt, production, shipment, invoice. Another common error is ignoring data migration effort. Messy BOMs and inconsistent units of measure cause more delay than software choice. Finally, small shops underestimate outgrowing a tool. If you can see a path to routings, traceability or multiple sites within two years, favour a tool with headroom.
- Do not choose on entry price alone, check the tier that includes the features you need.
- Test the import of your real BOMs, not the demo data.
- Ask how integrations behave when an order is edited after sync.
Frequently Asked Questions
Is Katana or MRPeasy better for a small manufacturer?
Neither is better in general. Katana style tools suit product businesses with storefront integrations and simple production. MRPeasy style tools suit shops needing routings, capacity planning and shop floor tracking. Run your own order through a trial of each and compare the planning output.
Can I switch between them later?
Yes, but expect to export items, BOMs, suppliers and open orders as CSV and re-import them. History usually does not carry over cleanly. Keep clean item codes and consistent units of measure so migration stays cheap.
Should I consider Odoo or ERPNext instead?
If you need broader modules such as accounting, CRM and HR, or want to customise heavily, open-source ERPs are worth a look. They need more implementation effort, so budget for setup time or a consultant.
How accurate is a scorecard like this?
It is a screening tool built from common selection criteria. It cannot know your exact workflows or current vendor features. Use it to prepare trial scenarios, then decide based on how real orders behave in each system.
If your answers point to a bigger ERP, or you want the cloud MRP connected to private AI and reporting, Netray can review your shortlist and data readiness.
Related Tools
Small Manufacturer ERP Cost Calculator
Total cost of ownership calculator for cloud MRP and ERP projects in small plants, covering subscription, users, one-time services and hidden internal time.
ERP Migration & SelectionSpreadsheet to MRP Migration Checklist
A phased checklist to move planning, BOMs and inventory out of spreadsheets and into a cloud MRP or ERP without losing control during cutover.
Other ERPsOdoo Manufacturing Setup Checklist
A practical checklist for configuring Odoo Manufacturing from inventory foundations through BOMs, work centers, planning and go-live.
Other ERPsERPNext BOM Import Template
An editable BOM worksheet with finished item, component, quantity, UoM and rate columns, calculating extended and rolled up cost before you import to ERPNext.
More ERP Migration & Selection tools
See all- ERP TCO Comparison Calculator (5-Year)
- ERP Migration Risk Assessment
- Data Migration Effort Calculator
- ERP Selection Scorecard for Manufacturers
- ERP Go-Live Readiness Checklist
- ERP Change Management Readiness Assessment
- ERP Integration Complexity Calculator
- Cloud vs On-Premise ERP Cost Calculator
- ERP Upgrade vs Replace Assessment
Keep exploring
Free tools
- Small Manufacturer MRP Readiness AssessmentScore your readiness for MRPeasy, Katana, Odoo, ERPNext or a similar system, and see what to fix before you buy.
- Small Manufacturer ERP Requirements Document TemplateA fill-in requirements document you can send to MRPeasy, Katana, Odoo, ERPNext or Fishbowl resellers so every vendor quotes the same scope.
- PLM Selection Scorecard WorksheetA weighted scorecard to compare three PLM candidates on change management, BOM, CAD and ERP integration, cost and vendor fit.
ERP fixes and how-tos
- Katana MRP Integrations and the MRPeasy REST APIKatana MRP integrations and the MRPeasy REST API: what the Shopify, accounting and marketplace connectors sync, where the API fits and how to avoid sync gaps.
- How to Compare Planned vs Actual Cost in MRPeasyHow to compare planned and actual cost on MRPeasy manufacturing orders, find why a product cost looks wrong, and trace material, labour and overhead variance.
- MRPeasy Custom FieldsHow to approach custom fields in MRPeasy on items, customer orders and BOMs: where to add them, what they can drive, reporting limits and API alternatives.
AI on your ERP
- AI for MRPeasy Manufacturing ERPAdd private AI to MRPeasy: natural-language answers over production, inventory, and lot traceability data, plus MRP exception and PO follow-up agents, without a public AI reading your data.
- AI for Katana Cloud ManufacturingAdd private AI on top of Katana: natural-language answers across Katana, Shopify, and QuickBooks Online, plus agents for reorder points and channel demand, without a public model reading your data.
Integrations
- How to add an AI chatbot to KatanaAdd an AI chatbot to Katana: answer order and stock questions for staff and customers, grounded in the Katana API, with guardrails, handoff and a private-model option.
- How to use ChatGPT with KatanaConnect ChatGPT to Katana: custom GPT actions over the REST API, exports versus live access, enterprise data controls, and when a private model is the better call.
Software
- MRPeasyMRPeasy is a cloud MRP and ERP system for small manufacturers. See its modules, integrations, limitations and alternatives for shortlisting.
- KatanaKatana is a cloud inventory and manufacturing system for small product makers. See its modules, integrations, limits and alternatives before you choose.