Engineering & PLMFree worksheetPDF, Excel, Word exportDiscrete Manufacturing

PLM Selection Scorecard Worksheet

Choosing a PLM system is a multi-year commitment, and the decision is usually argued from feature lists. A weighted scorecard forces you to agree on what matters first and then compare vendors against the same yardstick.

Free, optional. Reopen it on any device.
Download:
CriterionWeight (1-10)Vendor A score (0-5)Vendor B score (0-5)Vendor C score (0-5)Weighted AWeighted BWeighted C
40
30
50
36
36
27
45
27
36
30
40
40
32
32
32
15
15
20
28
28
21
24
40
24
16
32
24
24
12
30
24
18
18
Total weight
86
Total weighted A
314
Total weighted B
310
Total weighted C
322
Vendor A, percent of maximum
73%
Vendor B, percent of maximum
72.1%
Vendor C, percent of maximum
74.9%

Rename Vendor A, B and C in your export. Agree the weights with stakeholders before scoring any vendor, and score from demonstrations and reference calls, not brochures. Scores are your judgment, and no product is rated here.

PLM to ERP integration risk review

Optional: we can look at how a shortlisted PLM would release items, BOMs and changes into your ERP and list the integration risks.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the PLM scorecard

Start with the criteria and edit them to fit your needs, adding rows for anything specific such as a particular CAD system or regulatory requirement. Set weights from 1 to 10 with your stakeholders before looking at any vendor, so the weights are not bent to favor a favorite. Then score each candidate from 0 to 5 per criterion, using demonstrations of your own scenarios and reference calls. The sheet multiplies weight by score, totals each vendor and shows the percentage of the maximum possible. Export to Excel to share with the steering group, and keep the weighted totals alongside a short written rationale.

  • Agree weights before any vendor demonstration
  • Score from scripted demos using your own parts and changes
  • Use the same scoring scale definitions for everyone
  • Include IT, manufacturing, quality and purchasing in the scoring

Criteria that usually matter most

For manufacturers, the highest-impact criteria are engineering change management, BOM handling (engineering versus manufacturing BOM and variants), CAD integration, and the integration with the ERP that executes the BOM. A PLM that cannot release items, BOMs and changes cleanly to the ERP leads to double entry and errors. Next come document and revision control, compliance and audit trail for regulated work, usability, because adoption decides whether the system is actually used, and total cost of ownership including implementation, licensing, integration and upgrades. Deployment options matter if you work with controlled or classified data that cannot go to a public cloud.

Reading the result

The sample weights and scores are illustrative placeholders, not a rating of any real product. A vendor scoring above roughly 75 percent is a strong fit against your own criteria, but small gaps between vendors are within the noise of subjective scoring. If two vendors are within about five points, run a deeper proof of concept on the highest-weight criteria, particularly the ERP integration and engineering change workflow. Also check that no vendor scores 0 or 1 on a must-have criterion, since a weighted total can hide a fatal gap.

Common mistakes

Selecting PLM from a feature checklist means everyone ticks yes and nothing is learned. Better to ask vendors to demonstrate a real change from request to ERP release. Another common mistake is underestimating data migration and the cost of cleaning part and BOM data, which often exceeds the license cost. A third is letting one department choose: PLM touches engineering, manufacturing, quality and purchasing, and a tool that suits only the design team is poorly used elsewhere. Finally, many small manufacturers need less than a full PLM; a controlled ERP change process may be enough.

Frequently Asked Questions

What are the key criteria for selecting a PLM system?

Engineering change management, BOM management, CAD integration, ERP integration, document control, compliance, usability, total cost of ownership, deployment options and vendor support. Weight them according to your products and industry.

Do I need PLM or is my ERP enough?

If you have few products, simple BOMs and few changes, ERP-based change control may be enough. PLM becomes valuable with complex products, many revisions, multiple CAD systems or strong regulatory traceability needs.

How many vendors should I score?

Three to five serious candidates is practical. Screen a longer list with must-have criteria first, then use the weighted scorecard on the shortlist, supported by scripted demonstrations and reference calls.

How do I avoid bias in scoring?

Agree the weights first, use written scoring definitions, have multiple people score independently and average, and base scores on demonstrations of your own scenarios instead of presentations.

Netray does not sell PLM. If useful, we can review how a candidate would exchange items, BOMs and changes with your ERP and flag integration risks before you decide. The scorecard is free to use as is.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Software