OCR Pilot Test Plan Template
Most OCR pilots fail because nobody agreed up front what good looks like. This plan fixes the scope, sample set, measures and decision rules before any software runs.
Fill in
OCR Pilot Test Plan Template
Supplier invoice capture pilot
Company: Acme Precision Ltd Sponsor: Controller Pilot owner: AP manager Dates: 2026-11-02 to 2026-12-11 Hosting: On-premises
Objective
Decide with evidence whether document capture can read the documents below at an acceptable accuracy and cost, before committing to a full rollout.
Scope
Supplier invoices (PO-backed), credit notes. Excluded: freight bills, utilities.
Sample set
300 documents from 25 suppliers, drawn from the last 90 days, including 40 scanned and 20 non-English documents.
A person who is not on the project team will key the correct values for each sample document before the pilot starts. This is the answer key.
Success criteria
Primary metric: Field-level accuracy Target: Header fields 97 percent correct, line items 93 percent correct
Secondary measures: exception rate, minutes of human review per document, data stays inside the agreed boundary.
Method
| Step | Activity | Owner | Date |
|---|---|---|---|
| 1 | Collect sample and build answer key | ||
| 2 | Configure and run extraction | ||
| 3 | Compare output to answer key by field | ||
| 4 | Review errors with AP and quality users | ||
| 5 | Decision meeting |
Risks
| Risk | Mitigation | Owner |
|---|---|---|
| Sample not representative | Draw across all suppliers and months | |
| Confidential data exposure | Run inside the agreed network boundary | |
| Answer key errors | Second reviewer checks 10 percent |
Decision and approval
A starting template. Adjust scope, measures and approvals to your own governance process.
Run the pilot on your own hardware
Optional: talk through a private, on-prem document AI pilot scoped to your sample set.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill in the pilot name, dates, scope and target, then export to PDF or Word and circulate before kickoff. Get the sponsor to sign the success criteria. Changing the target after seeing results is the most common reason pilots produce a false yes or false no, so treat the signed criteria as fixed.
Building the sample set
Pick documents that represent real volume, not the clean ones. Include scanned pages, multi-page invoices, credit notes, non-English documents and the suppliers that cause you the most exceptions. Three hundred documents across twenty or more suppliers is a workable starting size for a header-level read, but line items need more lines, not more documents. Keep a hold-out set that the vendor never sees.
Measures that matter
Field-level accuracy compares each extracted value with the answer key. Touchless rate is the share of documents that post with no human touch. Report both, because high accuracy with low confidence still sends many documents to review. Also record review minutes per document so you can calculate cost, not just accuracy.
Common mistakes
Do not let the software vendor choose the sample. Do not count a document as correct when the total is right but the PO number is wrong, since that breaks matching. Do not skip the data governance question, especially for defense, aerospace and export-controlled documents, where where the model runs may matter as much as how well it reads.
Frequently Asked Questions
How long should an OCR pilot last?
Four to six weeks is common: one week for the sample and answer key, two for configuration and runs, and the rest for review and decision. Longer pilots tend to drift in scope without producing better evidence.
Who builds the answer key?
A person independent of the vendor and project team, ideally an AP clerk or quality technician who knows the documents. Have a second person check a subset to catch keying errors in the key itself.
What accuracy should we target?
It depends on your downstream controls. Set targets by field, with stricter values for amounts, PO numbers and vendor identity than for descriptive text, and agree them with the process owner before the pilot.
Can I use this for quality documents?
Yes. Replace the document types with certificates of conformance or test reports, and add the fields that matter, such as heat number, part number and specification revision.
Netray runs pilots with open-weight models on your own hardware, so documents never leave your network. We can help build the answer key and scorecard.
Related Tools
AI Extraction Human Review SOP Template
A fill-in SOP for human-in-the-loop review of OCR and AI extraction, with thresholds, roles, sampling and escalation.
AI Agents & AutomationOCR Human Review Staffing Calculator
Estimate reviewer hours and full-time staff needed for the share of documents that fall out of straight-through processing.
AI Agents & AutomationVendor Invoice Layout Registry Worksheet
A registry of supplier invoice layouts with format, language, volume and capture status, so you know which vendors need template work.
AI Agents & AutomationOCR Exception Queue Triage Worksheet
Log each document that falls out of OCR into an exception queue, tag the root cause, and see aging and hours lost per category.
More AI Agents & Automation tools
See all- Manual Keying Correction Log Worksheet
- Business Process Automation ROI Calculator
- AI Agent Use Case Prioritizer
- Document Processing Automation Savings Calculator
- AP Invoice Automation ROI Calculator
- Order Entry Automation Savings Calculator
- Quote-to-Cash Cycle Time Calculator
- Manufacturing AI Readiness Assessment
- RPA vs AI Agent Selector
Keep exploring
Free tools
- Document AI and OCR Pilot Readiness ChecklistA practical checklist covering sample selection, ground truth labeling, success metrics, security and ERP posting before you start an OCR or document AI pilot.
- AI Pilot Charter TemplateA one-to-two page charter for an AI or agent pilot on your ERP: scope, success metrics, data access, risks, budget and stop rules.
- OCR Accuracy CalculatorTurn a reviewed sample of documents into field accuracy, document level accuracy and the correction effort hiding behind them.
Guides
- From AI Pilot to Production: A Manufacturing PlaybookMove an AI pilot to production: environment promotion, monitoring, rollback plans, and the ERP integration hardening manufacturers need before go-live.
- Your First AI Agent in Manufacturing: A Practical PlaybookYour first AI agent in manufacturing: pick a bounded ERP use case, scope data access, set guardrails, and ship a working pilot in 6 to 8 weeks.
- Building an AI Document Processing Pipeline: OCR to ValidationHow to build an AI document processing pipeline: OCR quality, LLM extraction, schema validation, and the human review layer that catches what slips through.
AI on your ERP
- A 90-Day ERP AI Pilot Plan With Real Success CriteriaA week-by-week 90-day plan for piloting AI on your ERP, with defined success criteria for each phase so the pilot ends in a clear go or no-go decision.
- Dynamics 365 AI Demo and Proof of Concept: Testing AI on Your Own Data in 30 DaysHow to run a Dynamics 365 AI demo or proof of concept on your own data: sandbox setup, use cases, test sets, security, success criteria and a 30-day plan.
Integrations
- How to add document OCR to Infor SyteLineCapture vendor invoices, packing slips and certificates of conformance into Infor SyteLine with OCR, confidence thresholds, PO matching and a human review queue.
- How to add document OCR to Infor LNCapture invoices, packing slips, certificates of conformance and drawings into Infor LN with OCR, confidence thresholds, ION posting and human review.