Document capture and OCRInfor LNRuns on-prem

Affinda and Infor LN: AI document capture for invoices and orders

Affinda is a cloud AI document extraction service that lists Infor, with LN among the supported products, as an integration target. Its page does not document the exact LN mechanism, so treat the integration as something to scope with Affinda: typically extracted fields are returned as structured data and loaded into LN through your own mapping. If documents cannot leave your network, plan for that early.

How Affinda document capture for Infor connects to Infor LN

Extraction API plus a mapping layer you own

Affinda's page lists Infor but does not detail the LN method. The general pattern for a capture service is: send the PDF or image, receive JSON fields (supplier, invoice number, dates, lines, totals), then post them to LN. In LN that post is usually done through ION and a BOD, a Business Interface, or a data import session, whichever your team already supports.

Review queue before posting

Low-confidence fields should land in a human review step, not go straight into LN. Decide whether review happens in Affinda's tooling or in an internal screen, and keep the original document linked to the LN record for audit.

What data moves

FromToDataWhen
Supplier invoice (PDF, email)AffindaDocument image or PDFMailbox rule or upload
AffindaMapping layerExtracted header and line fields with confidence scoresExtraction complete
Infor LNMapping layerOpen POs, suppliers, tax codes, currencies for matchingLookup at validation time
Mapping layerInfor LNValidated invoice for posting or approvalPasses validation or reviewer approves
Rejected documentsAP clerkFields that failed match or confidence checksValidation failure

Setting it up

  1. 1Confirm the LN mechanism with AffindaAsk for the written method they support for your LN version, since the public page does not describe it.
  2. 2Decide data residencyCheck where Affinda processes and stores documents and whether that fits your contracts and any export-control rules.
  3. 3Define the document typesStart with supplier invoices only. Add order confirmations or delivery notes later, each with its own extraction model.
  4. 4Build the supplier and PO lookupMatch on LN business partner ID, tax number and PO number. Cache lookups so validation is fast.
  5. 5Choose the LN entry pointPick ION BOD, Business Interface or import session and test posting a single invoice in a non-production company.
  6. 6Set confidence thresholdsRoute anything under the threshold, or any new supplier layout, to human review.
  7. 7Run parallel for a cycleProcess one month both manually and through capture, and compare totals and tax before cutting over.

What usually breaks

  • !Invoices from the same supplier with several layouts or languages lowering extraction accuracy until each is tested.
  • !Tax codes and withholding handled differently in LN than on the document, so totals match but tax does not.
  • !Duplicate postings when the same invoice arrives by email and by portal; use supplier plus invoice number as a key.
  • !Line-level matching failing when the PO line was changed in LN after the supplier invoiced.
  • !Currency and rounding differences between the document and the LN exchange rate on the posting date.
  • !Confidential drawings or pricing in attachments leaving the network without anyone having decided that is acceptable.

A private AI layer across both systems

Exception triage

A private assistant reads rejected documents and the matching LN PO and receipt, then explains in plain language why each failed and what the clerk should check.

Supplier layout drift

It compares recent extraction errors by supplier and flags layouts that changed, so templates can be retrained before AP backs up.

Plain-language AP questions

Let AP ask which invoices are waiting on a receipt, with the underlying LN query shown, read-only.

On-prem extraction option

Where documents must stay inside the network, an open-weight vision-language model served on your GPUs can handle extraction for the document types you select, with a human approving what posts to LN.

Try it here, free

AP Invoice Automation ROI Calculator

Open full tool

Estimate the annual savings, payback period, and three-year ROI of automating accounts payable invoice capture, matching, and posting.

When something else fits better

  • Use an AP automation product with a documented LN connector if you want a supported path rather than a mapping layer you maintain.
  • Use EDI or supplier portal invoicing for your top suppliers, which avoids OCR errors entirely.
  • Keep manual entry if monthly invoice volume is low; capture only pays off with steady volume.

Frequently asked questions

Does Affinda have a native Infor LN connector?

Its integrations page lists Infor and names LN among the supported products, but it does not describe the mechanism. Ask Affinda for the specific method and the LN versions they have tested before you plan the project.

Can document capture run fully on-prem?

Affinda is a cloud service. If documents must stay inside your network, you would look at a self-hosted extraction approach instead, or confirm Affinda's deployment and residency options in writing.

How does extracted data get into LN?

Usually through ION and a BOD, a Business Interface, or an import session, driven by a mapping layer that validates against LN suppliers and POs first. Which one you choose depends on your LN version and what your team already supports.

Should every invoice be auto-posted?

No. Post automatically only when supplier, PO and amounts match within tolerance and confidence is high. Everything else should go to a person, and approvals should stay in LN's normal workflow.

Pairing documented at preview.affinda.com/integrations/infor . Affinda document capture for Infor is a product of Affinda; Netray is independent and not affiliated with either vendor.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations