Pallet Load Calculator: Cases per Pallet
This pallet load calculator tells you how many cartons fit on one pallet once you apply the real limits: the footprint, the height cap and the weight cap. Use it to set standard pack quantities, quote freight, or check a supplier's stated cases per pallet.
Your numbers
48 x 40 in is the common GMA pallet.
Set by truck, rack beam level or customer rule.
Excluding the pallet itself.
Your results
Geometry check only. Confirm crush strength, overhang rules, stretch wrap and carrier limits before changing a pallet pattern.
Cartons per pallet vs carton height
Sweeps Carton height from 4 to 20, holding your other inputs fixed.
Check packaging data in your ERP
Optional: have an expert compare ERP pallet quantities and units of measure against real pack-outs.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the pallet and carton dimensions in the same unit, then the maximum loaded height and the maximum product weight. The calculator tests the two basic orientations for a layer, picks the better one, stacks as many layers as the height allows and then caps the total at the weight limit. Set the maximum height from the tightest constraint in your chain, such as a rack beam opening or a customer receiving rule, not just the truck.
- Measure outside carton dimensions, including bulge
- Subtract the pallet deck height from the height limit
- Use product weight excluding the pallet
- Round carton sizes up, never down
The method
Cartons per layer is the product of how many cartons fit along the pallet length and how many fit across the width, using whole numbers only. Rotating the carton 90 degrees gives a second pattern, and the larger wins. Layers equal the available height divided by carton height, rounded down. The load is the lower of the height-limited count and the weight-limited count. Footprint use shows how much of the deck the pattern covers; below roughly 90 percent there may be room to change carton size.
Worked example
A 48 by 40 in pallet with a 16 by 12 by 10 in carton gives 3 by 3 in pattern A and 4 by 2 in pattern B, so 9 and 8 cartons per layer. With a 60 in cap and a 5.5 in deck, 5 layers fit, giving 45 cartons. At 18 lb each that is 810 lb, well under a 2,000 lb limit, so height is the constraint. If a design change raised the carton height to 11 in, only 4 layers would fit, and the pallet would drop to 36 cartons. That kind of cliff is exactly what the chart shows.
Common mistakes
Teams often forget that a pallet quantity entered in the ERP must match the real pallet build, otherwise ASN, picking and freight data drift apart. Others ignore crush strength: stacking five layers can fail on a lower layer even when geometry works. Mixed-SKU pallets, overhang, and column-stack versus interlock patterns are not modelled here. In SAP, Oracle, Infor or Epicor, store the result as the unit of measure conversion for the pallet, and record the pattern in the packaging instruction.
Frequently Asked Questions
How many boxes fit on a standard pallet?
It depends on box size, height limit and weight. A 48 by 40 inch pallet commonly takes 8 to 12 cartons per layer for mid-sized boxes, and total height is usually capped near 48 to 72 inches depending on the carrier or rack.
What pallet size should I enter for Europe?
The EUR pallet is 1200 by 800 mm, or about 47.2 by 31.5 inches. Enter both in the same unit as your carton dimensions, for example all in millimetres, and set the height limit accordingly.
Does this include the weight of the pallet?
No. Enter the maximum product weight, which is the pallet capacity minus the pallet itself and any wrap or dunnage. Add pallet weight afterwards when calculating gross shipping weight.
Can a pinwheel pattern fit more cartons?
Sometimes. Pinwheel and mixed patterns can add a carton or two when the footprint has leftover space. This calculator tests the two block orientations only, so treat the result as a safe minimum.
If your pallet quantities in the ERP no longer match what is built on the floor, Netray can help check unit-of-measure and packaging data across your items.
Related Tools
Shipping Container Load Calculator (20ft, 40ft)
Estimate how many cartons fit in a 20ft, 40ft or 40ft high cube container based on carton size, weight and container payload.
Supply Chain & InventoryWarehouse Space Utilization Calculator
Turn your building size, aisle share and pallet counts into position, cube and overall space utilization so you know when you are really full.
Supply Chain & InventoryWarehouse Slotting Worksheet
An editable slotting worksheet that sizes forward pick slots from pick velocity, unit cube and days of supply so fast movers sit where picking is cheapest.
Supply Chain & InventoryDock Schedule Template
A fill-in daily dock appointment schedule with door assignment, carrier, PO or order number, trailer and status, ready to print or share.
More Supply Chain & Inventory tools
See all- Warehouse Pick Rate Productivity Calculator
- Cycle Count Program Planning Worksheet
- Warehouse Receiving Inspection Checklist
- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
Keep exploring
Free tools
- Pallet Pattern Cases per Layer and Pallet CalculatorCompare the two basic case orientations on a pallet, then get cases per layer, layers, cases per pallet, area utilisation and total pallet weight.
- Truckload Freight Cost per Pallet CalculatorSee what a truckload costs per pallet, whether you are limited by space or weight, and the price of an under-filled trailer.
- Warehouse Cost per Pallet Stored CalculatorFind what each occupied pallet position and each pallet handled really costs, and see how occupancy changes it.