Warehouse Slotting Worksheet
Slotting decides where each item lives, and it quietly drives pick rate, travel and replenishment workload. This worksheet sizes the slot each SKU needs from its velocity, cube and days of supply so you can compare against the location sizes you actually have.
| SKU | Assigned zone | Picks per day | Avg units per pick | Cube per unit (cu ft) | Days of supply in slot | Units per day | Cube per day | Slot cube needed | |
|---|---|---|---|---|---|---|---|---|---|
360 | 18 | 36 | |||||||
380 | 45.6 | 136.8 | |||||||
40 | 32 | 128 | |||||||
66 | 26.4 | 132 | |||||||
4 | 26 | 260 | |||||||
3 | 27 | 378 |
Rank rows by picks per day, then assign the highest-velocity items to the most ergonomic, closest locations. Re-run slotting at least quarterly or after a major product mix change.
Get slotting suggestions from your history
Optional: discuss producing a slotting recommendation from ERP or WMS pick history.
Optional. The tool and every export work without this. No spam.
How to use it
List your SKUs with the average picks per day, average units per pick, cube per unit and the days of supply you want to hold in the pick face. The sheet computes units per day, cube per day and the cube the slot must hold. Then sort or review by picks per day, and assign the busiest items to the golden zone, usually waist to shoulder height near the pack or dock end, and slower items to higher or deeper locations.
- Use at least 8 to 12 weeks of pick history
- Treat seasonal items separately
- Use net cube including packaging
- Keep heavy and fragile rules in mind
The slotting logic
Velocity slotting ranks items by pick frequency so the items with the most touches have the shortest walks. Cube-per-order index and pick-density approaches refine this by also considering size. Days of supply controls replenishment: a slot holding two days of demand is replenished often but keeps the pick face compact, while ten days reduces replenishment but uses more premium space. Slot cube needed equals daily cube times days of supply, plus an allowance because slots are never filled perfectly.
Reading the result
Compare slot cube needed with the available cube of the candidate location, such as a carton flow lane, shelf bay or pallet face. Items whose need exceeds the slot will starve the picker; items far below it waste space. Total slot cube against your forward pick capacity shows how much of your demand can really sit in the fast area. If most picks come from a few SKUs, protect those locations and consider replenishment triggers by min and max quantity.
Common mistakes
Slotting once and never revisiting is the usual issue; assortments and seasons change. Another is optimising for picking alone and forgetting replenishment, which can double-handle fast items. Co-pick affinity also matters: parts ordered together should often be near each other. In SAP EWM, Oracle WMS, Infor and Epicor warehouses, storage type and bin definitions limit what you can assign, so check configuration capacity before moving stock. Move in waves, off peak, with counts to confirm.
Frequently Asked Questions
What is warehouse slotting?
Slotting is the process of assigning each product to a storage location based on velocity, size, weight and handling rules, so the most frequently picked items are the easiest to reach and replenishment stays efficient.
What is the golden zone?
The golden zone is the set of pick locations between roughly knee and shoulder height that are easiest and fastest to reach, usually close to the pack or dock area. Fast movers belong here.
How often should I re-slot?
Review quarterly for most operations and more often with strong seasonality or frequent new products. Smaller adjustments can be made weekly based on velocity changes, but each move has a labor cost.
How much days of supply should a pick face hold?
Enough to avoid replenishment during a pick wave, usually one to five days for fast movers, balanced against slot size. Slow movers can hold more because they take little space per pick.
If velocity data already exists in your ERP transaction history, Netray can help turn it into a repeatable slotting recommendation your team reviews before any move.
Related Tools
Warehouse Pick Rate Productivity Calculator
Convert hours worked and lines picked into lines per hour, percent to target and cost per line, and see how volume changes unit cost.
Supply Chain & InventoryWarehouse Space Utilization Calculator
Turn your building size, aisle share and pallet counts into position, cube and overall space utilization so you know when you are really full.
Supply Chain & InventoryPallet Load Calculator
Work out how many cartons fit on a pallet by layer pattern, height limit and weight limit, and see how much of the pallet footprint you use.
Supply Chain & InventoryCycle Count Program Planning Worksheet
An editable worksheet that turns SKU counts and count frequency by ABC class into daily counts and the labor hours your cycle count program needs.
More Supply Chain & Inventory tools
See all- Dock Schedule Template
- Warehouse Receiving Inspection Checklist
- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
Keep exploring
Free tools
- Warehouse Pick Rate Productivity CalculatorConvert hours worked and lines picked into lines per hour, percent to target and cost per line, and see how volume changes unit cost.
- Warehouse Labor Cost per Order CalculatorTurn pick, pack and ship times into labor cost per order, daily hours and the headcount you need.
- Warehouse Space Utilization CalculatorTurn your building size, aisle share and pallet counts into position, cube and overall space utilization so you know when you are really full.
ERP fixes and how-tos
- Infor LN 10.7 Pick Note Configuration in Warehouse OutboundConfigure pick notes in Infor LN 10.7 warehouse outbound: the parameters, outbound procedures, document layout and the checks that stop picking documents printing.
- Pick Line vs Wave Line in Infor M3Pick line versus wave line in Infor M3: what each represents in warehouse picking, how waves group work, and how to decide which applies in your setup.
- Infor LN 10.7 Picking Mission and Picking Profile SetupHow picking works in Infor LN 10.7 Warehousing: outbound advice, warehouse orders, picking missions and profiles, setup order and the pitfalls that stall picks.
Runs with your ERP
- NetSuite Mobile Warehouse Management: receiving, picking and cycle counts on handheldsHow NetSuite's native mobile warehouse management works: SCM Mobile and the WMS SuiteApp, receiving, putaway, picking, cycle counts, pitfalls and AI options.
- Piccolinet WMS ONE and SAP Business One: cloud warehouse management for SMEsHow Piccolinet WMS ONE embeds a cloud warehouse system in SAP Business One for inbound, putaway, picking, shipping and cross-docking, plus setup and AI.
- Descartes OzLink Mobile Warehouse and Oracle NetSuiteOzLink Mobile Warehouse is a barcode-driven NetSuite app for receiving, picking, packing, counts, moves, replenishment and labor tracking.
Guides
- AI-Powered Warehouse AutomationAutomate warehouse operations with AI. WMS optimization, pick path intelligence, labor management, and seamless ERP integration for Infor and Salesforce.
- Infor LN Warehouse Management System ConfigurationConfigure warehouse management in Infor LN with location structures, inventory handling rules, pick strategies, and RF/barcode integration for WMS optimization.
- Infor LN Warehouse Management: Setup, Flows, and OptimizationInfor LN warehouse management setup guide: warehouse types, locations, inbound and outbound flows, handling units, and cycle counting optimization that cuts errors.
AI on your ERP
- AI for Infor LN Warehousing: Inventory, Inbound and Outbound Exceptions Made SearchableAI for Infor LN Warehousing: trace inventory discrepancies and inbound or outbound exceptions in plain language. On-prem option, approval on writes.
- AI for Fishbowl Manufacturing and WarehouseFishbowl on-premise API for custom integrations: socket API, REST API and read-only replica options, plus private AI that leaves the QuickBooks sync alone.