Pallet Sizes and Dimensions Reference by Region
Pallet size is one of the first questions in any warehouse, rack, trailer or container plan, and the answer changes by region. This lookup lists the common footprints in both millimetres and inches so you can check a supplier spec or a customer requirement in seconds.
| Pallet | Footprint (mm) | Footprint (in) | Main region | Typical use |
|---|---|---|---|---|
GMA / North American standard | 1219 x 1016 | 48 x 40 | North America | Grocery, general freight, most US racking and trailers |
Square drum pallet | 1219 x 1219 | 48 x 48 | North America | Drums, bagged goods, heavy bulk |
Drum pallet | 1118 x 1118 | 44 x 44 | North America | Drums and chemical containers |
ISO 42 x 42 | 1067 x 1067 | 42 x 42 | North America, also listed in ISO 6780 | Paint, telecom, tile and some packaged goods |
Dairy pallet | 1016 x 1016 | 40 x 40 | North America | Dairy and beverage cases |
Square beverage pallet | 914 x 914 | 36 x 36 | North America | Beverage and small-footprint loads |
Half pallet | 610 x 1016 | 24 x 40 | North America | Retail displays and light loads |
EUR 1 / EPAL 1 | 1200 x 800 | 47.2 x 31.5 | Europe | Standard European exchange pallet |
EUR 2 / EPAL 2 | 1200 x 1000 | 47.2 x 39.4 | Europe | Industrial and chemical goods |
EUR 3 / EPAL 3 | 1000 x 1200 | 39.4 x 47.2 | Europe | Industrial goods, same footprint as EUR 2 rotated |
EUR 6 / EPAL 6 half pallet | 800 x 600 | 31.5 x 23.6 | Europe | Retail and display loads |
Quarter pallet | 600 x 400 | 23.6 x 15.7 | Europe | Retail display units |
ISO 1200 x 1000 | 1200 x 1000 | 47.2 x 39.4 | Europe, Asia | Export loads, chemicals, general industry |
Asian standard pallet | 1100 x 1100 | 43.3 x 43.3 | Japan, Korea, China, parts of Asia | Domestic distribution in Asia |
ISO 1140 x 1140 | 1140 x 1140 | 44.9 x 44.9 | Australia (ISO 6780 listing) | Industrial and packaged goods |
Australian standard pallet | 1165 x 1165 | 45.9 x 45.9 | Australia | Domestic Australian distribution, fits local rail and road |
Air freight PAG | 2235 x 3175 | 88 x 125 | Global air cargo | Air cargo base for built-up unit loads |
Air freight PMC | 2438 x 3175 | 96 x 125 | Global air cargo | Air cargo base for built-up unit loads |
Footprints are nominal. Real pallets vary by a few millimetres, and load height, weight rating and entry type (two-way or four-way) are set by the specific pallet spec. Confirm with your pallet supplier and racking vendor before committing to a footprint.
Pallet master data review
Want pallet type and dimensions maintained cleanly in your ERP or WMS item master? We can review how it is stored and used.
Optional. The tool and every export work without this. No spam.
How to use the table
Type a region, a footprint such as 1200 or a use case into the search box and the table filters instantly. Use the metric column for export documents and the inch column for US racking and trailer calculations. Export to Excel to attach the relevant rows to a customer packaging requirement or a supplier agreement.
- Search by footprint to see every pallet that shares it
- Filter by region to compare what a customer in Europe expects versus North America
- Export the rows you need to PDF for a packaging spec
Why regions use different pallets
Pallet sizes grew up around local trailers, rail cars, doorway widths and product packaging modules. North American pallets are built around a 48 inch by 40 inch grocery standard, European pallets around a 1200 by 800 millimetre footprint that matches the 600 by 400 millimetre packaging module. ISO 6780 lists six pallet footprints as an international reference, but real trade still uses local standards. Check the receiving end before choosing a pallet for export.
What to check beyond the footprint
The footprint is only the start. Rated static, dynamic and racked load, deck board spacing, entry type, material (wood, plastic, metal) and wood treatment all matter. International wood pallets generally need ISPM 15 treatment and marking for export. Racking beams, conveyor widths and AS/RS handling all assume a specific pallet quality, so ask for the supplier data sheet and not just the nominal size.
Common mistakes
The most frequent mistake is mixing 1200 by 800 and 1200 by 1000 pallets in the same rack bay, which wastes space or overhangs the beam. Another is assuming a 48 by 40 pallet and a 1200 by 1000 pallet are interchangeable because they look close; they differ by about 19 millimetres on one side and 16 on the other, enough to fail a rack clearance or a container fit plan.
Frequently Asked Questions
What is the most common pallet size in the US?
The GMA pallet, 48 inches by 40 inches (about 1219 by 1016 millimetres), is the most common in North America. It was built around the grocery industry and is the default assumption for most US racking and trailers.
Is a EUR pallet the same as an EPAL pallet?
EPAL is the association that licenses and audits the standard EUR pallet. An EPAL 1 and a EUR 1 pallet share the 1200 by 800 millimetre footprint. Look for the EPAL or EUR branding to confirm it is the exchange pallet.
Which pallet sizes does ISO list?
ISO 6780 lists six footprints: 1200 by 800, 1200 by 1000, 1219 by 1016, 1140 by 1140, 1100 by 1100 and 1067 by 1067 millimetres. Many other local sizes are still used in trade.
Do I need ISPM 15 stamped pallets?
For most international shipments in solid wood packaging, yes. ISPM 15 requires heat treatment or fumigation and a stamp. Plastic and engineered wood pallets are generally exempt, but check the import rules of the destination country.
If your WMS or ERP stores a pallet type per item or per customer but you still rebuild pallet plans by hand, we can help connect that master data to your load and slotting logic.
Related Tools
Shipping Container Specifications and Capacity Reference
Typical internal dimensions, door size, cubic capacity, tare weight and payload for common ISO containers, plus pallet floor counts.
Supply Chain & InventoryWarehouse KPI Formulas and Definitions Reference
A lookup of the common warehouse and distribution KPIs with how each is calculated, what it tells you and where it misleads.
Costing & FinanceWarehouse Cost per Pallet Position Calculator
Turn monthly facility, labor, utilities and equipment cost into a cost per pallet position and per occupied pallet, and see how utilization moves it.
SAPSAP EWM Pallet Position Requirement Calculator
Estimate the storage bins or pallet positions you need to configure from stock levels, pallet quantities and a safe occupancy target.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- Pallet Dimensions by Region ReferenceCompare the common pallet footprints used in North America, Europe, Asia and Australia, with floor area in square metres.
- Pallet Load CalculatorWork out how many cartons fit on a pallet by layer pattern, height limit and weight limit, and see how much of the pallet footprint you use.
- Pallet Pattern Cases per Layer and Pallet CalculatorCompare the two basic case orientations on a pallet, then get cases per layer, layers, cases per pallet, area utilisation and total pallet weight.