Quality & InspectionFree calculatorPDF, Excel, Word exportPharma and Life Sciences

Content Uniformity Acceptance Value Calculator

Acceptance value is the number that decides whether a batch passes uniformity of dosage units by content. It combines how far the mean sits from the target with how scattered the individual results are.

Your numbers

%
%

15.0 in the compendial tests for T equal to 100 percent.

Your results

Acceptance value
5.04
Pass indicator (1 pass, 0 fail)
1
Reference value M
99.2
Applies when target content T is 100 percent of label claim.
Headroom to limit
9.96
Largest SD that still passes at this mean
6.25

Simplified for target content T equal to 100 percent. Compendial rules include further criteria for stage 2, individual unit limits and other targets. Confirm with the current official text.

Free, optional. Reopen it on any device.
Save results:

Acceptance value vs standard deviation

Sweeps Standard deviation from 0 to 8, holding your other inputs fixed.

Quality results trending

Optional expert review of how lab results and batch data could be trended from your systems.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter the mean content as a percentage of label claim and the sample standard deviation, then choose how many units were tested. The calculator reports the acceptance value, whether it falls under 15, and how much standard deviation you could still afford at that mean. Use the chart to see how quickly a rising spread consumes the limit.

The formula

AV = |M - mean| + k x s. M equals the mean if it lies between 98.5 and 101.5 percent. If the mean is below 98.5, M is 98.5, and if above 101.5, M is 101.5. The constant k is 2.4 for 10 units and 2.0 for 30 units. A mean of 99.2 with SD 2.1 gives AV near 5.0, a comfortable pass. A mean of 95 with SD 3 gives AV above 10.

Common mistakes

Using population rather than sample standard deviation is the most common one: the sample SD divides by n minus 1. Others include entering results as absolute mg instead of percent of label claim, and forgetting that the individual unit limits (such as a unit more than 25 percent from M) still apply in the full test. Treat this as a screening aid for trending.

Frequently Asked Questions

Is AV the only pass criterion?

No. The compendial test also limits individual units relative to M and moves to a second stage when the first fails. This calculator covers the main AV step only.

Why does k change with sample size?

Larger samples give a better estimate of the true spread, so the penalty factor on the standard deviation is smaller.

What if my target is not 100 percent?

The reference value M follows different rules for other targets. Use the official text for those cases.

Can I use it for blend uniformity?

It is useful as a trending screen, but blend uniformity criteria are set in your validation protocol and are not the same as dosage unit acceptance.

Netray can feed LIMS results and batch records into a single quality review view on your own infrastructure. Ask for an expert review.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs