Data Integrity ALCOA+ Audit Checklist for GMP Operations
ALCOA+ is the shorthand regulators use for good data practice: attributable, legible, contemporaneous, original and accurate, extended by complete, consistent, enduring and available. This checklist turns the principles into audit questions you can walk through on the floor and in the lab.
0 of 36 items complete
11 critical items still open - these are the highest-risk gaps.
Attributable and legible
Contemporaneous and original
Accurate and complete
Consistent, enduring and available
Governance and system controls
Count the items answered yes. Any critical item answered no should be raised as an observation and risk assessed before the audit is closed.
Evidence-based data integrity reviews
An optional discussion of pulling audit trail and access data from your systems into one private review view.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Work through one system or process at a time, such as an HPLC with its data system, a weigh and dispense station or an electronic batch record. Tick each item as you observe it, not as it is described, and keep notes against the critical items. Export the result to PDF or Excel to attach to the audit report and the CAPA record.
The principles behind it
ALCOA appears in FDA guidance on data integrity and compliance with CGMP, and the extended principles are used by EMA, MHRA and PIC/S guidance. The expectation is that data is trustworthy across its lifecycle, from creation to archive, whether it is on paper or electronic. The checklist groups the principles into five areas so audits stay manageable.
What to sample
Do not audit from the SOP alone. Pick a recent batch or test and trace the raw data: the instrument audit trail, the processing method, the reviewer sign-off and the stored file. Look for gaps in time stamps, repeated injections with no explanation, shared accounts and deleted files. A small number of well-traced samples reveals more than a long list of document checks.
- Compare audit trail entries with the reported results.
- Check who has administrator rights on each system.
- Test one backup restore during the audit.
Common mistakes
Teams often assume a validated system is automatically compliant, but controls such as audit trail review and role separation must also be applied in daily use. Another trap is treating hybrid systems, where a printout is signed but the electronic file is the true record, as paper only. Decide which record is the original and control it.
Frequently Asked Questions
What does ALCOA+ stand for?
ALCOA stands for attributable, legible, contemporaneous, original and accurate. The plus adds complete, consistent, enduring and available. Together they describe how GMP data should be created, kept and retrieved over its whole lifecycle.
Does this checklist cover 21 CFR Part 11?
It covers many of the same controls, such as audit trails, access and signatures, but it is a data integrity audit, not a Part 11 assessment. Use it alongside a Part 11 gap assessment for systems with electronic records and signatures.
How often should I audit data integrity?
Many companies run a risk based programme, with high risk systems such as QC lab data systems audited at least annually and others on a cycle. Also audit after a data integrity deviation, a system change or an inspection finding.
What counts as a critical finding?
Typically, deleted or hidden data, disabled audit trails, shared logins for GMP work, or retesting without documentation. Your quality system defines the severity scale, but these items threaten the reliability of released product data and need prompt escalation.
Netray can help build a private, on-prem way to pull audit trail and access data from your ERP and lab systems into a single review view, so data integrity checks run on evidence rather than samples alone.
Related Tools
GxP Audit Trail Entry JSON Generator
Build a structured audit trail record with user, time, change, reason and signature meaning for a regulated integration.
Compliance & ContractsPharma GMP Inspection Readiness Assessment
Score how ready your site is for a regulatory GMP inspection and see where to focus first.
ERP OperationsFDA 21 CFR Part 11 Readiness Assessment
Answer 8 questions on e-signatures, audit trails, access control, and validation status to see how ready your electronic records and systems are for FDA scrutiny.
SAPSAP Batch Management GMP T-Codes and Tables Reference
A lookup of SAP transactions, tables and movement types for batch genealogy, inspection and release.
More Compliance & Contracts tools
See all- GMP Change Control Form Template
- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
Keep exploring
Free tools
- Pharma GMP Inspection Readiness AssessmentScore how ready your site is for a regulatory GMP inspection and see where to focus first.
- Pharma Batch Genealogy SQL Query GeneratorFill in plant, material and batch to produce SQL for forward and backward batch traces on SAP material documents.
- Pharma Stage Yield and Reconciliation WorksheetEnter input, output, samples and rejects for each manufacturing stage to see yield and unaccounted loss that needs an explanation.
Guides
- Infor M3 Pharmaceutical Compliance and Regulatory SetupHow Infor M3 supports quality, product traceability and compliance in regulated manufacturing like pharma: audit trails, e-signatures, lot genealogy.
- How to Configure Audit Trail in SyteLineStep-by-step guide to configuring audit trail functionality in Infor SyteLine. Set up change tracking, user activity logging, data integrity controls, and compliance reporting for regulatory requirements.
- ERP Data Validation and Testing GuideValidate ERP data after migration with automated reconciliation, business rule testing, and statistical sampling. Ensure data integrity before go-live.
AI on your ERP
- AI for ERP in Pharmaceutical Manufacturing Under GMPPrivate AI on the ERP of a GMP pharmaceutical plant: batch genealogy, deviation and CAPA triage, release readiness and Part 11 aware, read-only access.
- AI for Oracle EBS in Pharmaceuticals: Batch Genealogy, Quality Data, and Validation-Aware DesignAI for Oracle E-Business Suite in pharma: batch records, lot genealogy, OPM quality results and deviations, private, read-only and designed for validated environments.
Manufacturing hubs
- Pharma and life sciences manufacturing in Philadelphia and southeastern PennsylvaniaGuide to pharma and life sciences manufacturing in Philadelphia and southeastern Pennsylvania: ecosystem, GMP requirements, ERP and quality system needs, private AI.
- Pharmaceutical and Chemical Manufacturing in New JerseyNew Jersey pharmaceutical and chemical manufacturing: industries, associations, FDA cGMP, Part 11 and OSHA PSM requirements, and ERP and batch record data problems.