SAPFree referencePDF, Excel, Word exportSAPPharma and Life Sciences

SAP Batch Management T-Codes, Tables and Movement Types for GMP

In a GMP plant, SAP batch management is the backbone of traceability: every receipt, issue, inspection and release is tied to a batch number. This lookup lists the transactions, tables and movement types that quality and IT teams use most.

Download:
Code or tableTypeDescriptionGMP use
MSC1N
Transaction
Create Batch
Create a batch master record before goods receipt or production
MSC2N
Transaction
Change Batch
Update shelf life dates, status and batch characteristics
MSC3N
Transaction
Display Batch
Review batch master data during release or investigation
MSC4N
Transaction
Display Batch Changes
Review change documents for a batch master
MB56
Transaction
Batch Where-Used List
Trace a component batch forward or a finished batch backward
MB51
Transaction
Material Document List
List goods movements by material, plant and batch
MB52
Transaction
List of Warehouse Stocks on Hand
Stock by batch and storage location
MB5B
Transaction
Stock on Posting Date
Reconstruct batch stock as of a past date
MMBE
Transaction
Stock Overview
Check quality inspection, blocked and unrestricted stock by batch
COR3
Transaction
Display Process Order
Review components and batches consumed in a process order
CO03
Transaction
Display Production Order
Review components and batches consumed in a discrete order
QA32
Transaction
Inspection Lot List
List inspection lots by material and batch
QA03
Transaction
Display Inspection Lot
Review specification, results and status for a lot
QA11
Transaction
Record Usage Decision
Accept or reject the lot and trigger stock posting
QE51N
Transaction
Results Recording Worklist
Enter lab results against inspection characteristics
QM01
Transaction
Create Quality Notification
Raise a deviation or complaint record
QM03
Transaction
Display Quality Notification
Review a deviation or complaint record
QP01
Transaction
Create Inspection Plan
Define test steps for a material
QS21
Transaction
Create Master Inspection Characteristic
Define reusable test characteristics and limits
CT04
Transaction
Characteristics Maintenance
Define batch characteristics such as potency or assay
CL30N
Transaction
Find Objects in Classes
Search batches by characteristic values
BMBC
Transaction
Batch Cockpit
Review batch master, stocks and where-used in one screen
MCH1
Table
Batches, cross-plant
Batch master data at material level
MCHA
Table
Batches, plant level
Batch master data at plant level
MCHB
Table
Batch Stocks
Stock quantities by batch, plant and storage location
MKPF
Table
Material Document Header
Posting date and document header for goods movements
MSEG
Table
Material Document Segment
Material, batch, quantity, movement type and order number per line
AFKO
Table
Order Header Data
Order dates and header data for production and process orders
AFPO
Table
Order Item
Order item, material and planned quantity
QALS
Table
Inspection Lot Record
Inspection lot header with material, batch and plant
QAVE
Table
Inspection Usage Decision
Usage decision code and date per lot
QMEL
Table
Quality Notification
Notification header for deviations and complaints
KLAH
Table
Class Header Data
Class definitions used by batch classification
AUSP
Table
Characteristic Values
Stored characteristic values, including batch values
INOB
Table
Link Between Object and Classification
Links a batch object to its class
101
Movement type
Goods receipt
Receipt against a purchase order or process order
261
Movement type
Goods issue for order
Component consumption into a production or process order
262
Movement type
Reversal of goods issue for order
Return of components from an order
321
Movement type
Transfer posting, quality inspection to unrestricted
Release after a positive usage decision
322
Movement type
Transfer posting, unrestricted to quality inspection
Move stock back into inspection
343
Movement type
Transfer posting, blocked to unrestricted
Release blocked stock after investigation
344
Movement type
Transfer posting, unrestricted to blocked
Quarantine suspect stock
551
Movement type
Goods issue for scrapping
Destruction of rejected stock
601
Movement type
Goods issue for delivery
Shipment of released batches to customers

Transaction availability depends on SAP release, role design and add-ons. Table and field names are standard SAP, but custom enhancements are common in regulated plants. Verify in your system with SE11 and SE93.

Ask SAP batch questions in plain language

An optional review of a read-only, on-prem assistant for batch genealogy and release status.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the list

Search for a batch task such as where-used, release or scrap and the rows show the transaction, the tables behind it and the movement type it posts. Filter by type to list only tables when you are building a report, or only transactions when you are writing a work instruction for operators. Export the filtered list to Excel for a validation traceability matrix or a role design workshop.

Batch traceability in practice

Forward trace starts at a component batch and finds every order that consumed it through movement 261. Backward trace starts at a finished batch, finds the order that received it through movement 101, then reads the components consumed by that order. MB56 performs this in the SAP GUI, while a SQL or ABAP query over MSEG and MKPF can handle bulk traces during a recall.

Quality release and stock status

A batch usually enters inspection stock after goods receipt, an inspection lot is created, results are recorded and a usage decision moves the stock. Movement 321 releases inspection stock to unrestricted use, while 343 and 344 move stock between blocked and unrestricted status. Control who can post these movements, because they are the point where a quality decision becomes a stock change.

  • Restrict QA11 and release movements to authorised roles.
  • Review change documents with MSC4N for batch master edits.
  • Check stock status with MMBE before shipment.

Common mistakes

People trace only the plant they know and miss transfers between plants. Others rely on MCHB for history, but it holds current stock rather than movements. Use MSEG and MKPF for history. In validated systems, also remember that custom Z transactions and enhancements can change the standard behaviour listed here.

Frequently Asked Questions

Which SAP transaction shows where a batch was used?

MB56, the Batch Where-Used List, shows forward and backward relationships for a batch. For large recalls or custom reports, teams often query the material document tables MSEG and MKPF directly, filtering by batch and movement type.

What is the difference between MCHA and MCHB?

MCHA holds batch master data at plant level, such as dates and status. MCHB holds the stock quantities for each batch by plant, storage location and stock category. Neither holds the movement history, which is in MSEG and MKPF.

Which movement type releases a batch from quality inspection?

Movement 321 transfers stock from quality inspection to unrestricted use. It is normally posted automatically from the usage decision when a lot is accepted, but some plants post it manually under controlled authorisations.

Are these codes the same in S/4HANA?

Most are, but S/4HANA changes some data models, for example material documents and batch handling, and certain tables may be compatibility views. Check each object in your own release with SE11 and your vendor documentation.

Netray can build a private, read-only tracing assistant on top of your SAP batch data, so quality can ask for a forward or backward trace in plain language and see the query behind the answer.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring