Costing & FinanceFree calculatorPDF, Excel, Word exportMetal Finishing

Rack vs Barrel Plating Cost Per Part Calculator

Choosing rack or barrel is a cost question driven by part size, volume and quality needs. This calculator compares the two on a per-part basis using labor, line time, rack upkeep, metal and rejects, and shows how barrel load size changes the answer.

Your numbers

parts
dm2
um
g/cm3

Zinc 7.14, nickel 8.9, copper 8.96, tin 7.31.

$/kg
%

Share of purchased metal that ends up as deposit after dragout and sludge losses.

$/h
$/h

Depreciation, chemicals, utilities, wastewater and floor space per line hour.

parts
min/rack
min/rack

Time the line is occupied per rack position, set by the hoist cycle.

$/use
%
1,500 parts
min/load
min
barrels
%

Barrel plating gives wider thickness spread, so more average metal is deposited to meet the minimum.

%

Your results

Rack cost per part
$0
Barrel cost per part
$0
Rack metal cost per part
$0
Deposit mass in grams is area x thickness x density / 100; divided by 1000 to kg, priced, then divided by utilization.
Racks required
417
Barrel loads required
7
Rack total lot cost
$3,330
Barrel total lot cost
$154
Barrel advantage per part (negative = rack cheaper)
$0

Model uses direct labor, line time and metal. It excludes quality inspection, setup, masking, packaging, waste treatment surcharges and tax, which should be loaded through your overhead rate.

Free, optional. Reopen it on any device.
Save results:

Cost per part vs parts per barrel load

Sweeps Parts per barrel load from 200 to 5000, holding your other inputs fixed.

Finishing cost model review

Want plating costs calculated from live routing and rate data? We can discuss how to set up a private cost assistant.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter lot size, area, thickness and metal price. Then fill in the rack side (parts per rack, handling time, line index time, strip cost, rejects) and the barrel side (parts per load, handling, cycle time, simultaneous barrels, uniformity penalty, rejects). Compare the two per-part costs. The chart sweeps barrel load size, which shows the point at which barrel overtakes rack. Small, bulk, robust parts typically favor barrel; larger or cosmetic parts, and anything that tangles or dents, favor rack.

  • Use your loaded labor rate, not the hourly wage
  • Set line overhead from annual line cost divided by productive hours
  • Reflect reject rates from real data, not goals
  • Run the sweep to see sensitivity to load size

How the cost model works

Metal cost per part is deposited mass priced by weight and divided by utilization. Rack cost adds handling labor per rack, line occupancy at the hoist index time, and rack strip or repair per use. Barrel cost adds handling per load and line time of cycle time divided by the number of barrels processed together. Barrels get a metal penalty because thickness spreads more widely, so more average deposit is needed to meet a minimum. Total cost is divided by the good-yield fraction to include rework or scrap.

Reading the result

At small areas and large volumes the barrel is far cheaper because handling and line time are shared across thousands of parts. As parts get bigger the barrel load shrinks and the advantage collapses. Cosmetic requirements, thickness tolerance and part damage in tumbling can force rack work even when it costs more. If the two are within a few cents per part, quality risk should decide, not the calculator.

Common mistakes

Shops often compare cycle times but not line occupancy, ignore rack strip and repair cost, and forget that barrel work needs extra metal for uniformity. Another mistake is using a single overhead rate for different lines. If barrel and rack lines have different costs per hour, run the model with each line's rate.

Frequently Asked Questions

When is barrel plating cheaper than rack?

Barrel is usually cheaper for small, durable parts in large quantities, because handling and line time are spread across thousands of pieces. It struggles with parts that nest, tangle, scratch, or need tight thickness distribution.

What does plating cost per part include?

Direct labor for racking and unracking, line time (chemicals, utilities, depreciation), metal, rack or barrel wear, and scrap or rework. This model leaves out inspection, packaging, masking and treatment surcharges, which you can load through overhead.

How do I set the line overhead rate?

Divide the annual cost of the line, including depreciation, chemicals, power, wastewater, maintenance and space, by its productive hours. Separate rates for rack and barrel lines give a better comparison.

Why does barrel plating use more metal?

Barrel parts see widely varying current density as they tumble, so thickness spreads more widely than on a rack. To ensure every part meets the minimum, the average deposit must be thicker, which consumes more metal.

If your job costs are in an ERP, we can help build an assistant that applies routing times, rates and yield data to quote plating work consistently, hosted on your own infrastructure.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring