Costing & FinanceFree calculatorPDF, Excel, Word exportPlex Smart Manufacturing PlatformDiscrete Manufacturing

Cost Per Good Part Calculator

Part cost is where quoting, scheduling and improvement priorities meet. This calculator builds a cost per good part bottom-up so you can see what efficiency and scrap are really worth.

Your numbers

$
%
people

Use a fraction if one operator tends several machines.

$ per hour

Depreciation, power, tooling, maintenance and floor space.

seconds per part
85 %
%
$
$
parts

Your results

Cost per good part
$6
Spreads the cost of scrapped parts over the good ones.
Scrap cost carried per good part
$0
Parts per hour
76.5
Labor cost per machine hour
$49
Conversion cost per part
$1
Labor plus machine cost per part made.
Setup cost per part
$0

Simplified cost model. Apply your own overhead allocation rules and check the scrap treatment against your costing policy.

Free, optional. Reopen it on any device.
Save results:

Cost per good part vs efficiency

Sweeps Efficiency from 40 to 100, holding your other inputs fixed.

Part costing review

Optional review of how standard cost and actual cost compare for your top parts.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter the operator wage, burden and the number of operators per machine, then the machine hour rate from your costing. Add the standard cycle time and the efficiency you actually achieve, then scrap rate, material per part, setup cost and lot size. The output is the conversion cost per part and the cost per good part with scrap loaded in. Drag the efficiency slider to see how much each point of efficiency is worth, which is useful when justifying a fixture or training.

  • Use actual efficiency from production data
  • Keep the machine rate consistent with your cost system
  • Include fringe and payroll taxes in burden
  • Test a small lot to see setup impact

The build-up

Parts per hour equal 3600 divided by cycle time, times efficiency. Labor cost per machine hour is wage times one plus burden, times operators. Conversion cost per part is labor plus machine rate, divided by parts per hour. Setup per part is setup cost over lot size. Cost per good part is material plus conversion plus setup, divided by the good fraction, which loads scrap cost, including material, onto the parts shipped.

Reading the result

Because conversion cost divides by parts per hour, cost per part rises sharply as efficiency falls, and the chart curves upward at the left. A few points of scrap on a part with expensive material can outweigh a larger efficiency gain. Compare the scrap cost line with your quality improvement budget: if scrap adds several cents to each part, you can price a corrective project directly. Also compare the result with the quoted price to see the margin left.

Common mistakes

Using standard instead of actual efficiency produces a cost that is too low for the shop to hit. Applying scrap only to conversion and not material understates the loss. Forgetting setup on small lots hides why short runs are unprofitable. Missing overhead such as quality, supervision and facility cost is also common; add it through the machine rate or as a separate allocation, and keep the method the same across quotes.

Frequently Asked Questions

Is machine hour rate the same as overhead?

Not exactly. A machine hour rate usually bundles depreciation, power, maintenance and tooling for that machine. Plant overhead such as supervision and facilities may be added separately, depending on your costing policy.

Why divide by the good fraction?

Scrapped parts consume material and time but earn no revenue. Dividing by the good fraction moves their cost onto the good parts, which is the true cost of what you ship.

How does lot size affect cost?

Setup cost is fixed per job, so larger lots spread it thinner. Doubling a 250-part lot cuts setup cost per part in half, which is why small orders carry a premium.

Can I use this for quoting?

It is a good cross-check. Add your overhead, profit and any tooling or packaging separately, and compare against what your ERP costing returns for the same routing.

Netray can help compare standard and actual part cost from your ERP data and explain variances in plain language. Ask if you want to see how.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software