Predictive Maintenance Alert Work Request Template
A good condition monitoring finding is useless if the planner cannot act on it. This template structures the finding, evidence and urgency in a form that can be attached to or copied into a maintenance notification.
Fill in
Predictive Maintenance Alert Work Request Template
Predictive Maintenance Work Request
Company: Acme Precision Ltd Asset: P-101 Cooling water pump Location: Utility room, Plant 2 Date of finding: 2026-10-20 Analyst: R. Singh
Detection
Technique: Vibration analysis Severity: Alert
Finding and evidence
Drive end bearing shows rising 1x and bearing defect frequency peaks. Overall velocity increased from 1.8 to 3.4 mm/s RMS in six weeks.
Readings
| Point | Measurement | Baseline | Current | Alert limit | Alarm limit |
|---|---|---|---|---|---|
| DE horizontal | |||||
| DE vertical | |||||
| NDE horizontal |
Recommended action
Inspect and regrease DE bearing, verify alignment, plan bearing replacement at next scheduled stop if trend continues.
Plan work by: 2026-11-10
Approvals
Attach spectra, trend plots or thermal images to the request. Close the loop after the repair by recording what was found, so the finding can be validated and the alarm limits tuned.
Draft findings automatically
Optional: discuss generating work requests from monitoring data for human approval.
Optional. The tool and every export work without this. No spam.
How to use it
Fill in the asset, technique, severity and a short finding written for a planner, not another analyst. Add the readings against baseline and limits, state the recommended action and a date by which work should be planned. Export to PDF or Word, attach spectra or thermal images, and file it with the notification in your CMMS or ERP maintenance module.
What makes a finding actionable
State what changed, how fast, and what you expect to happen if nothing is done. Give a recommended action and a deadline rather than only a diagnosis. Keep severity definitions consistent across techniques so planners can prioritize across vibration, thermography and oil analysis in one list.
- Watch: trend monitored, no work needed
- Alert: plan inspection within weeks
- Alarm: plan repair at next opportunity
- Critical: stop or reduce load until inspected
Closing the loop
After the repair, record the as-found condition and the cause. This feedback is what separates a working predictive program from an expensive data collection exercise. It tells you which alarms were true, which were nuisances and how much warning time you actually had, which feeds back into limits and route frequency.
- Compare predicted and actual fault
- Record warning time in days
- Update limits and route frequency
Frequently Asked Questions
Who should receive this work request?
The maintenance planner or scheduler, with a copy to the production supervisor who controls access to the machine. The planner needs evidence and a date, not a full analysis report.
How urgent is an alert versus an alarm?
Define it in your own program. A common pattern is that alert means plan an inspection within weeks and alarm means plan a repair at the next opportunity. Critical means act immediately.
What evidence should I attach?
Trend plots, a spectrum or waveform for vibration, a thermal image with reference temperature for infrared, or the lab report for oil analysis, plus the baseline for comparison.
Can I use this with SAP PM or other systems?
Yes. Copy the text into a maintenance notification long text and attach the exported file. The fields map naturally to notification fields in most CMMS and ERP systems.
Netray can draft these findings from monitoring data and create the notification in your ERP for a person to review and approve.
Related Tools
Condition Monitoring Alarm Limit Worksheet (Statistical Baseline)
Editable worksheet that sets alert (mean + 2 sigma) and alarm (mean + 3 sigma) limits per asset and measurement.
Maintenance & ReliabilityVibration Velocity, Acceleration and Displacement Converter
Convert a single-frequency vibration reading between velocity, acceleration and displacement, with a frequency sweep chart.
Maintenance & ReliabilityBearing L10 Life Calculator (ISO 281)
Basic and adjusted rating life of ball and roller bearings from C, P and rpm, with a load sweep chart.
Discrete ManufacturingPredictive Maintenance ROI Calculator
Predictive and condition-based maintenance ROI calculator: compare baseline unplanned downtime cost against monitoring cost to see net annual savings across your asset fleet.
More Maintenance & Reliability tools
See all- Preventive Maintenance Schedule Template
- Maintenance Work Order Template
- Inherent vs Operational Availability Calculator (MTBF, MTTR)
- Spare Parts Criticality Scoring Worksheet
- Maintenance Backlog Calculator (Weeks of Work and Crew Size)
- PM Compliance and Schedule Compliance Calculator
- Reliability Centered Maintenance (RCM) Worksheet
- Maintenance Cost per Unit Produced Calculator
- Optimal PM Interval Calculator (Weibull Cost Model)
Keep exploring
Free tools
- Predictive Maintenance Data Readiness AssessmentTen questions that show whether your asset data, failure history and sensor coverage can support predictive maintenance, and what to fix first.
- Predictive Maintenance ROI CalculatorPredictive and condition-based maintenance ROI calculator: compare baseline unplanned downtime cost against monitoring cost to see net annual savings across your asset fleet.
- Maintenance Work Order TemplateFill-in maintenance work order form covering request, safety, tasks, parts, completion data and sign-offs, with PDF and Word export.
ERP fixes and how-tos
- Infor LN General Table Maintenance: Finding and Editing Tables SafelyWhere general table maintenance sits in Infor LN, how to find the right session for a table, and how to change table data safely, no direct DB edits.
- How to Send SyteLine Business Event Alerts to Infor Ming.leHow to turn SyteLine business events into Infor Ming.le alerts and notifications: event handlers, ION, recipients, noise control and a decision guide.
- How to add a private AI layer to an on-prem CMMSHow to add a private AI assistant to an on-prem CMMS: read-only data access, work order retrieval, local models, permissions, approval-based write-back.
Runs with your ERP
- Oracle Fusion Cloud Maintenance with Fusion ERP and SCMHow Oracle Fusion Cloud Maintenance handles work orders, preventive maintenance and warranty on Fusion SCM: data flows, setup, pitfalls and private AI ideas.
- Prometheus Planning & Scheduling with SAP Plant MaintenanceHow Prometheus Planning and Scheduling works with SAP Plant Maintenance work orders on S/4HANA and ECC: data flows, setup, pitfalls and a private AI layer.
- Prometheus Planning & Scheduling with JD Edwards EnterpriseOne maintenanceHow Prometheus Group's planning and scheduling tool works with JD Edwards EnterpriseOne maintenance: Gantt scheduling, time confirmation, setup and pitfalls.
Guides
- AI Predictive Maintenance Integrated with ERP: From Sensor Data to Automated Work OrdersIntegrate AI predictive maintenance with your ERP system. Reduce unplanned downtime by 45% using sensor data, ML models, and automated work order generation.
- Predictive Analytics for Manufacturing ERP SystemsImplement predictive analytics in manufacturing ERP systems for demand forecasting, maintenance prediction, quality trend analysis, and yield optimization.
- IoT-Triggered Field Service and Predictive Maintenance with ERPImplement IoT-triggered field service with predictive maintenance models that create ERP work orders automatically based on sensor data and failure predictions.
AI on your ERP
- AI for SAP Plant Maintenance: Notifications, Work Orders, and Predictive SignalsAI grounded on SAP PM data that triages notifications, drafts work orders, standardizes failure codes, and flags predictive maintenance signals, on-prem.
- AI for IFS Cloud Maintenance: Work Orders, PM Plans and Spares Answered in Plain EnglishPrivate AI on IFS Cloud maintenance: ask questions across work orders, equipment objects, PM plans, spares and fault history, read-only, on your own servers.
Integrations
- How to add Slack to Infor SyteLineConnect Slack to Infor SyteLine with slash commands, interactive approval messages and event alerts built on the IDO REST service, AES and ION.
- How to add Slack to ERPNextAdd Slack to ERPNext: the built-in Slack Webhook URL and Notification channel, slash commands, interactive approvals and a Slack app that calls the REST API.