Press Brake Tooling Inventory Log Worksheet
Press brake tooling is expensive and easy to misplace or overload. This worksheet is a simple register of punches and dies with the specs operators need to pick the right set and the rated load limits that keep tooling safe.
| Tool ID | Type | V opening (mm) | Angle (deg) | Length (mm) | Rated load per meter (t/m) | Max load for this segment (t) | Rack location | Last inspected | Status | |
|---|---|---|---|---|---|---|---|---|---|---|
83.5 | ||||||||||
30 | ||||||||||
100.2 | ||||||||||
83 | ||||||||||
66.8 |
Rated load per meter must come from your tooling manufacturer's data for each specific profile. The values in the sample rows are placeholders for illustration only.
Link tooling records to your maintenance system
Optional: a short review of tooling and asset records in your ERP or CMMS.
Optional. The tool and every export work without this. No spam.
How to use the log
Add one row per tool or tool segment. Give every piece an ID that is also stamped or labeled on the tool. Fill in V opening for dies, angle, length, the rated load per meter from the tooling maker and the rack location. Update the status and last inspection date when you check for wear, chips or damage. Export the sheet to print for the tool crib.
Why record load ratings
Every punch and die profile has a rated maximum load per meter of length. The weakest tool in the stack sets the limit. Multiplying the rating by segment length gives the maximum load for that piece. When you form a part, the required force must stay below the lowest limit of the punch, die and adapters in use, as well as below the machine capacity.
- Use manufacturer data, not guesses
- Short segments carry less total load
- Air bending and bottoming load differ
- Check the machine rating separately
Inspection and regrind
Inspect tool tips and die shoulders for chips, galling and wear. Worn radii change bend angle and can mark parts. Record the date and status so a tool that needs regrind does not go back on the rack. Some shops schedule a quarterly check for tools in constant use, and an annual check for rarely used profiles.
Common mistakes
Shops often stack mixed tooling without checking the lowest rating. Another is losing tooling because rack locations are not recorded. Retiring a damaged tool in the log, rather than leaving it on the shelf, prevents an accident or a scrapped lot. Keep tooling IDs stable so setup sheets can refer to them.
Frequently Asked Questions
Where do I find the rated load per meter?
It is in the tooling manufacturer's catalog or on the tool itself for many profiles. Use the data for the exact profile. If you cannot find it, contact the supplier before using the tool at high tonnage.
What does Max load for this segment mean?
It is the rated load per meter multiplied by the segment length in meters. It is the most force the segment should take. The lowest limit in the stack, and the machine rating, set the real limit.
How often should tooling be inspected?
There is no single rule. Many shops check tools visually at setup and run a recorded inspection every few months for busy tools. Follow your own procedure and the tooling maker's guidance.
Can I track more than brake tooling?
Yes. The Type column is a dropdown, and you can export to Excel and add columns for punch press turret tools or laser nozzles as needed.
If you manage tooling in an ERP or maintenance system, we can help link tool records to work orders and setup data.
Related Tools
Press Brake Setup Sheet Template
A setup sheet for press brake jobs listing punch, die, bend sequence, angle targets and backgauge positions so repeat jobs set up fast.
Industry TemplatesSheet Metal Job Traveler Template
A printable job traveler for laser, punch, brake, weld and finish routings with material heat lot, program names and operator sign-offs.
Quality & InspectionSheet Metal Nonconformance Report Template
An NCR form for fabricated parts covering defect description, quantity affected, containment, cause, disposition and corrective action.
Industry TemplatesSheet Metal Cut List and Material Takeoff Worksheet
Enter blank sizes, thickness and quantity to get area and weight per line and totals, ready to order sheet or plate.
More Maintenance & Reliability tools
See all- MTBF and MTTR Worksheet
- TPM Autonomous Maintenance CIL Standard Template
- TPM Autonomous Maintenance Standard Template
- TPM Pillars and Autonomous Maintenance 7 Steps Reference
- Preventive Maintenance Schedule Template
- Maintenance Work Order Template
- Inherent vs Operational Availability Calculator (MTBF, MTTR)
- Spare Parts Criticality Scoring Worksheet
- Maintenance Backlog Calculator (Weeks of Work and Crew Size)
Keep exploring
Free tools
- Press Brake Setup and First Piece Inspection ChecklistA shop floor checklist for press brake job setup, first piece verification and release to production.
- Press Brake Setup Sheet TemplateA setup sheet for press brake jobs listing punch, die, bend sequence, angle targets and backgauge positions so repeat jobs set up fast.
- Press Brake Bend Cost per Part CalculatorSplits press brake cost into setup and run time, shows cost per bend and per part, and charts how quantity spreads setup cost.
Guides
- Sheet Metal Shop Scheduling Around the Press Brake BottleneckSchedule a sheet metal shop around the real constraint: press brake tooling changeovers, laser nesting batches, weld cells, and outside finishing lead time.
- ERP for Metal Fabrication: Nesting, Traceability, and Job CostingERP for metal fabrication: laser and press brake routings, nesting and drop tracking, mill test report traceability, weld inspection and real-time job costing.
- Sheet Metal Job Costing: Comparing Actual and Estimated MarginCompare estimated and actual cost on fabrication jobs: laser, brake, weld and finishing hours, scrap, nest variance, and the reports that show real margin.
AI on your ERP
- AI for Dynamics 365 Business Central in Metal FabricationPrivate AI for Business Central metal fabricators: quote-to-job costing, heat-lot traceability, outside processing and remnant stock grounded in your data.
- AI for ERP in Metal Fabrication: Nesting, Traceability and QuotingPrivate AI on your ERP for fab shops: nesting yield, remnants, MTR and heat traceability, weld procedure records, outside processing and quote turnaround.