Print Job Estimate Worksheet
A good print estimate lists every cost between artwork and delivery, then adds markup so the quote protects margin. This worksheet gives estimators a repeatable layout for sheetfed, web or flexo jobs that exports straight to Excel.
| Cost item | Category | Quantity | Rate | Markup % (%) | Cost | Selling price | |
|---|---|---|---|---|---|---|---|
$85 | $106 | ||||||
$88 | $110 | ||||||
$330 | $396 | ||||||
$56 | $70 | ||||||
$350 | $438 | ||||||
$120 | $156 | ||||||
$90 | $99 |
Set the markup per line to reflect risk and your pricing policy. Divide the total price by run quantity to get a price per piece, and add spoilage to paper quantity before you quote.
Connect estimates to actual job costing
Optional: we review how job costing is captured in your ERP and where estimate variances can be reported.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add a row for each cost item and pick its category. Enter quantity and rate in the unit that applies, such as plates, sheets, kilograms or hours, and set a markup percentage. Cost is quantity times rate. Selling price adds the markup. Totals and gross margin appear underneath. Replace the example rows with your own and keep the template as a starting point for every quote. Add spoilage to paper quantity before you enter it.
- Paper: add makeready and running spoilage sheets
- Press time: include makeready, not only running time
- Plates: one per colour per side unless reused
- Finishing: fold, die cut, laminate, bind
What a print estimate normally includes
Most print jobs break into prepress, plates or cylinders, substrate, ink, press time, finishing, packing and delivery. Outside services such as foil or embossing add another line. Estimators calculate press time from impressions, speed and makeready, and paper from sheets including spoilage. Ink follows coverage. Some shops price per thousand with run-length breaks, which you can reproduce by copying the sheet for each quantity. This sheet does not replace a print MIS but is the check most estimators build in Excel.
Reading margin and markup
Markup is added to cost, margin is measured against price. A 25 percent markup on cost is a 20 percent margin on price. The sheet shows the real gross margin so you can compare it to your target. A high markup on press time with a low markup on bought-in paper is common because paper has pass-through risk. If gross margin is below your floor, look at spoilage, makeready and outside services first, because they are the lines estimators often undercount.
Common mistakes and ERP notes
The usual errors are ignoring makeready, not adding spoilage, missing finishing speeds, forgetting freight, and quoting without a cost-per-piece check. In an ERP, a print job maps to a routing with operations for prepress, press and finishing, and a bill of materials for paper and ink. Compare your actual job cost to the estimate after each job, and feed the variance back into the rates in this sheet.
- Include makeready and spoilage
- Record actual versus estimate per job
- Keep hourly rates current by press
- Add outside services and freight
Frequently Asked Questions
How do I estimate the cost of a print job?
List every cost: prepress, plates, paper with spoilage, ink, press time including makeready, finishing, packing and delivery. Add the lines for total cost, then apply markup or a target margin to reach the selling price.
What is the difference between markup and margin?
Markup is the percentage added to cost. Margin is profit as a percentage of price. A 25 percent markup gives a 20 percent margin. Quoting on margin target needs price equal to cost divided by one minus margin.
How much paper spoilage should I add?
Spoilage depends on press, colour count and finishing. Offset jobs commonly need a few percent plus makeready sheets per colour, and finishing operations add more. Use your press log history rather than a flat guess.
Can I get a price per thousand?
Yes. Divide total selling price by the run quantity and multiply by 1,000. Repeat the sheet for different run lengths because makeready is fixed, which makes longer runs cheaper per piece.
If estimate versus actual job cost is hard to compare in your ERP, we can build an agent that reads job costing data and summarises variances. Ask for a short review.
Related Tools
Packaging Cost Per Unit Worksheet
Build up the full packaging cost for one sellable unit from bottle to pallet, with scrap allowance per line, and export it to Excel.
Discrete ManufacturingInk Coverage and Consumption Calculator
Estimate ink usage and cost for a print run from sheet or web area, average coverage, ink laydown in grams per square metre and a waste allowance.
Discrete ManufacturingLabel Roll Length and Outer Diameter Calculator
Enter label size, gap, core and material thickness to get roll length in metres, the finished roll diameter, and the most labels that fit under a diameter limit.
MES & Shop FloorPrint Press Run Log Worksheet
An editable run log that computes total waste, waste percent and average run speed for every job on the press.
More Costing & Finance tools
See all- Offset Press Job Time and Hourly Rate Cost Calculator
- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
- Distributor Customer Profitability Worksheet
- Distributor GMROI and Inventory Turns Calculator
- Vendor Early Pay Discount Worksheet
Keep exploring
Free tools
- Print and Packaging Plant ERP and MIS Readiness AssessmentScore how well your current systems support estimating, job costing, material tracking and traceability in a print or packaging plant.
- Job Shop Quote Price, Margin and Markup CalculatorTurn cost inputs into a unit price at your target gross margin, including scrap, setup and outside processing, and see the markup it equals.
- Print Press Run Log WorksheetAn editable run log that computes total waste, waste percent and average run speed for every job on the press.
ERP fixes and how-tos
- SAP QM Sample Label Printing: How to Print Physical Sample LabelsHow SAP QM sample label printing works: physical samples on an inspection lot, the QPR print transactions, the form behind the label and printer checks.
- Infor LN Reports Stuck in the Print Queue: Device and Spooler FixInfor LN reports sit in the print queue and never print when a device goes offline. Check the device definition, the spooler, and fix the queue fast.
- How to Print or Reprint a Customer Invoice in SyteLineHow to print, reprint or save a customer invoice as PDF in SyteLine/CSI: the invoice printing form, reprint option, report options and what to check when it fails.
Runs with your ERP
- BarTender and Oracle E-Business Suite: Label Printing from OracleHow BarTender prints labels from Oracle EBS using Oracle XML print requests and Integration Builder: methods, data flows, setup steps, pitfalls and AI help.
- BarTender with Infor SyteLine: how label printing is wired upHow SyteLine sites print labels with BarTender: SQL table triggers on-prem, and Mongoose or IDO patterns in the cloud. Setup steps, pitfalls and alternatives.
- Loftware Label Printing with Oracle Fusion Cloud SCMHow the Loftware adapter for Oracle Integration turns Oracle SCM Cloud business events into label print jobs and returns status: flows, setup and pitfalls.
Guides
- Job Costing and Margin by Job for Label and Packaging ConvertersHow converters compare estimate to actual by job: material and waste, press hours, outside services, overs and unders, and finding the jobs that lose money.
- SyteLine Printing Issues: Diagnosis and ResolutionResolve SyteLine printing failures including print job stuck in queue, barcode label errors, and network printer configuration for CloudSuite Industrial.
- AI for Estimating Label and Packaging Converting JobsHow AI can read customer inquiries and artwork specs, find similar past label and carton jobs, and draft an estimate for review, plus its limits.
AI on your ERP
- AI for ERP in Packaging and Printing: Estimating, Waste and Job TicketsPrivate AI on your ERP for converters and printers: job estimating, substrate and ink usage, make-ready waste, die tooling, proofs and food-contact records.
- AI on Infor SyteLine for Packaging ManufacturersAI on Infor SyteLine for packaging makers: substrate and ink costing, job repeats, die and plate tracking, food-contact records, and short-run scheduling.