Purchase Price Variance Worksheet
Purchase price variance compares what you paid with what the standard cost assumed. It is one of the first numbers a controller reviews at month end, and the one buyers are most often asked to explain. This worksheet computes it line by line and in total.
| PO number | Part | Supplier | Qty received | Standard price | Actual price | Standard value | PPV (positive = unfavorable) | PPV % | |
|---|---|---|---|---|---|---|---|---|---|
$27,600 | $2,160 | 7.8% | |||||||
$7,200 | -$160 | -2.2% | |||||||
$13,440 | $720 | 5.4% | |||||||
$17,200 | -$720 | -4.2% | |||||||
$14,850 | $1,170 | 7.9% |
PPV is measured at receipt or at invoice match depending on your system. Use the same basis for the whole sheet. Freight and duty variances are often tracked separately from price variance.
PPV exception report from live ERP data
Optional: we can outline a read-only report that surfaces the largest variances by supplier and buyer.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Paste or type receipt lines: PO, part, supplier, quantity, standard price and actual price. The sheet calculates the extended standard value, the PPV in currency and the PPV percent for every line. Totals show overall PPV and the share of standard spend. Sort in Excel by PPV to see the five or ten lines that explain most of the movement. Positive numbers are unfavorable, negative numbers are favorable.
- Use quantity received, not quantity ordered
- Convert prices to the same unit of measure as the standard
- Convert foreign currency at the rate your policy requires
- Flag lines with a variance above your threshold for buyer comment
Formula and accounting
PPV = quantity received x (actual unit price - standard unit price). When material is received at standard cost, the difference is posted to a purchase price variance account at the moment of receipt or invoice. Inventory then stays at standard, and the P and L carries the variance. If the part has already been consumed, some systems post part of the variance to cost of goods sold or a capitalization account instead.
Reading the result
In the example, steel and castings are unfavorable and the PCBA is favorable. Net PPV is the sum, and about 2 to 3 percent of spend is typical for a commodity-exposed basket, though your own history is the better benchmark. Split each large variance into market movement, supplier increase, and wrong standard. Only the second is a negotiation issue. The first and third are solved by indexing or by revising the standard.
Common mistakes and ERP notes
Do not net unrelated favorable and unfavorable items without looking at both. Do not let standards lag a year behind a moving market. In SAP the variance is posted on goods receipt or invoice receipt under the PRD account when price control is standard (S); in SyteLine, Epicor and NetSuite it is posted at receipt against the item standard cost. If you use moving average price, there is no PPV, and price changes flow through inventory instead.
Frequently Asked Questions
Is a negative PPV always good?
Not always. A favorable variance can mean a cheaper supplier with quality issues, a smaller order or a standard set too high. Check that the part is the same and that the savings are real before celebrating.
How do I handle invoice price differing from PO price?
Many systems record PPV at receipt using PO price, then post an invoice price variance later. For this sheet, use the price basis your general ledger posts to the variance account for consistency.
How often should standards be updated to limit PPV?
At least annually, and more often for commodity-driven parts. A rising persistent PPV on the same parts is the clearest sign that standards need revising.
Is PPV the same as savings?
No. PPV is relative to standard, and the standard may itself be out of date. True savings are measured against a validated baseline such as last year paid price or an index-adjusted price.
We can build a PPV exception report on top of your ERP receipts that lists the largest variances with supplier and buyer attached. Ask for an expert review.
Related Tools
SAP Purchase Price Variance and Moving Average Price Calculator
See the price difference posted at goods receipt for a standard price material and the new moving average price for a MAP material.
Costing & FinanceInventory Valuation Comparison Worksheet (FIFO, Average, Standard)
Compare ending inventory value under FIFO, weighted average and standard cost for each item, and see the total gap between methods.
Costing & FinanceDirect Labor Rate and Efficiency Variance Calculator
Break the difference between actual and standard direct labor cost into a rate variance and an efficiency variance.
Costing & FinanceManufacturing Month-End Close Checklist
A practical close checklist for manufacturing plants: cut-off, receipts, WIP, variances, overhead, inventory and reconciliations.
More Costing & Finance tools
See all- Manufacturing KPI Formula and Definitions Reference
- Manufacturing Cost Variance Types Reference
- Price, Volume and Cost Margin Variance Calculator
- Month End Reporting Readiness Checklist for Manufacturers
- OEE Improvement Value Calculator
- Improve OEE vs Buy a New Machine Calculator
- Six Sigma Project Savings Tracker Worksheet
- Should Cost Model Worksheet for Machined Parts
- Quote Assumptions and Exclusions Template
Keep exploring
Free tools
- Purchase Price Variance CalculatorCalculate purchase price variance from standard and actual price, see percent variance, annual impact and how PPV moves as price changes.
- Purchase Price Variance Analysis WorksheetList received parts with standard and purchase price to see PPV in currency and percent, and which items drive it.
- Price, Volume and Cost Margin Variance CalculatorEnter budget and actual units, price and unit cost to see how much of the margin gap came from price, volume and cost.
ERP fixes and how-tos
- SAP Purchase Price Variance (PPV) Report: T-Codes, Accounts and AnalysisHow purchase price variance arises in SAP, the PRD price difference account, and the tcodes and tables to report and analyze PPV by material and vendor.
- Contract, MMBE and PPV Reports in SAP MMRun contract reports in SAP MM with ME2M and ME2N, check stock with MMBE, report purchase price variance and build custom MM reports with SQ01 and CDS views.
Guides
- Setting Up Cost Variance Analysis in SyteLineConfigure cost variance analysis in Infor SyteLine for material, labor, and overhead variances. Set up variance reporting for standard cost manufacturing environments.
- Investigating Costing Variances in SyteLineInvestigate SyteLine costing variances: identify the variance type, trace purchase price and job variances, and reconcile the results to the general ledger.