Quote Assumptions and Exclusions Template
Most quote disputes start with something the estimator assumed and never wrote down. This page lists the assumptions, price basis and exclusions beside the price so both sides read the same thing. Fill the fields, preview and export a PDF or Word page.
Fill in
Quote Assumptions and Exclusions Template
Quote Assumptions and Exclusions
From: Acme Precision Ltd To: Northfield Aerostructures Quote: Q-26-1184 Date: 2026-10-20 Part: BRK-4410 Rev C
Pricing basis
Quantity breaks priced: 10, 50, 250 pieces Price basis: Ex works This quote is valid for 30 days from the quote date. Prices are not guaranteed for quantities or releases that differ from those listed.
Material assumption
Priced on 6061-T6 plate at the supplier price on the quote date. Material is surcharged if the market moves more than 5 percent before order.
Exclusions
Tooling or fixtures not listed. First article inspection report unless stated. Special packaging. Export licences. Changes to drawing revision after quote date.
Customer confirmations required before order
| Item | Assumed in this quote | Customer confirms |
|---|---|---|
| Drawing revision | BRK-4410 Rev C | |
| Annual volume or release schedule | 10, 50, 250 pieces | |
| Inspection and documentation level | Standard certificate of conformance | |
| Delivery terms | Ex works |
Acceptance
This template is a starting point, not legal advice. Have your own counsel review any terms that become part of a contract. Keep wording generic and balanced so it can be attached to quotes from any customer.
Draft quote notes from your ERP estimate
Optional: we can show how assumptions pages are generated from estimate data with human approval.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill the header, then state the quantity breaks you actually priced. Pick the price basis and write the material assumption in the form the estimator used: alloy, form, supplier price date and any surcharge trigger. List exclusions as plain nouns the customer can check against their drawing. Export the page and attach it behind the price sheet so it travels with the quote through approval, order entry and the first invoice.
- One page per quote number, not per customer
- Name the drawing revision priced
- Keep exclusions specific, not generic
- Update the date whenever you reprice
What belongs in the assumptions
Good assumptions are the inputs that move cost: quantity, material form, tolerance class, finishing route, inspection level, packaging and delivery terms. A price built on 250 pieces is not a price for 10 pieces, because setup spreads differently. Validity matters because raw material and subcontract rates move. If the quote depends on a customer-supplied drawing, model or specification, say which one. The test is simple: if this input changed, would you reprice?
Reading and checking the result
Read the exported page as the customer's buyer would. Every exclusion should match a real cost you did not carry. Every assumption should match what is in the estimate file. Check that the price basis agrees with the freight lines in the quote and that the validity date will not expire before the customer's approval cycle ends. Where the customer must confirm something, the confirmation table gives you a record to point to later.
Common mistakes
The usual faults are an unnamed drawing revision, exclusions copied from another job, missing validity, and silence on material price movement. Another is writing terms that contradict the customer's purchase order terms, which creates a battle of forms. Keep this page to commercial and technical assumptions, and leave warranty, liability and payment terms to your standard terms and conditions.
Frequently Asked Questions
How long should a quote stay valid?
Thirty days is common, but match it to how fast your material and subcontract prices move. For volatile metals or long customer approval cycles, use a shorter validity or a material surcharge clause so you are not holding a price you cannot honor.
Should exclusions be in the quote or the terms and conditions?
Job-specific exclusions belong on the quote itself, next to the price. General exclusions such as liability limits belong in your standard terms. Putting job-specific items only in the terms means the buyer may never see them.
Does this replace a contract?
No. It documents the technical and commercial basis of a price. It is not legal advice and does not replace a purchase order or supply agreement. Have counsel review anything that becomes binding.
What if the customer changes the drawing revision?
Treat it as a new quote basis. Review the change for cost impact, update the revision and date on this page, and reissue the price. Quoting a revision you did not price is a common source of margin loss.
If your quotes come out of an ERP, we can draft the assumptions page automatically from the estimate, routing and BOM data, with an estimator approving before it is sent.
Related Tools
Estimate Review and Approval Form Template
A one-page gate that records cost, margin, risks and approvals before a manufacturing quote is released.
Costing & FinanceTooling and NRE Amortization Quote Worksheet
Spread tooling, fixtures, gauges and engineering NRE across the quoted volume, net of what the customer pays up front.
Costing & FinanceSubcontract and Outside Processing Cost Worksheet
Cost each outside operation with price per piece, vendor minimum charge and freight, and see the true cost per part.
Discrete ManufacturingJob Shop Quote Worksheet
Quote a machined part operation by operation: setup hours, run minutes per piece, shop rate and material. Totals the cost and shows the price at a target margin.
More Costing & Finance tools
See all- Manufacturing KPI Formula and Definitions Reference
- Manufacturing Cost Variance Types Reference
- Price, Volume and Cost Margin Variance Calculator
- Month End Reporting Readiness Checklist for Manufacturers
- OEE Improvement Value Calculator
- Improve OEE vs Buy a New Machine Calculator
- Six Sigma Project Savings Tracker Worksheet
- Should Cost Model Worksheet for Machined Parts
- Overhead Cost Pool Allocation Worksheet
Keep exploring
Free tools
- CNC RFQ Quote Assumptions and Exclusions TemplateFill in fields and export a clean quote with quantity breaks, stated assumptions, exclusions, inspection and delivery terms.
- Job Shop Quote Cover Letter TemplateA fill-in quote letter for machined parts with quantity price breaks, assumptions, exclusions and standard terms.
- Sheet Metal Quote Terms and Assumptions TemplateA fill-in quote document that records price breaks, material, tolerances, finish, lead time and the assumptions that protect margin.