Refrigerant Leak Rate and Repair Log Worksheet
Refrigerant top-ups are one of the most overlooked sources of scope 1 emissions, and some regulations require leak checks and repair records. This worksheet turns service records into a leak rate and tonnes of CO2e per appliance.
| Appliance | Refrigerant | Full charge (kg) | Added in year (kg) | Annual leak rate (%) | GWP (100 yr, AR4) | Lost CO2e (t) | Repair done | Technician | |
|---|---|---|---|---|---|---|---|---|---|
11.8% | 9.396 | ||||||||
5.5% | 2.1288 | ||||||||
18.5% | 47.064 | ||||||||
0% | 0 | ||||||||
15% | 1.629 |
GWP values shown are IPCC AR4 100 year figures, widely used in inventories. Use the AR set your reporting scheme requires. Leak rate thresholds that trigger repair vary by regulation and appliance type, so check your local rule.
Connect maintenance data to emissions
Optional: ask how service records in your ERP can feed a scope 1 inventory.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
List each appliance with its refrigerant type and nameplate charge. After each year, or after each service visit, enter the kilograms of refrigerant added. The annual leak rate divides the amount added by the full charge. The CO2e column multiplies kilograms added by the global warming potential and divides by 1,000 to give tonnes. Record the repair date and the technician so you can show follow-up on any leak.
- Use the mass added to restore full charge, not the mass bought
- Count recovered refrigerant separately
- Keep technician certificates on file
- Track appliances with no top-ups too, as they show good control
The method
The simplest approach in the GHG Protocol is a mass balance: refrigerant purchased or added, minus returned or recovered, adjusted for inventory change. Where only service top-up is known, it is treated as the loss for the year. Multiply the mass of each gas by its GWP to get CO2e. Fugitive refrigerant is reported under scope 1.
Reading the results
Rank appliances by leak rate and by CO2e. A small unit with a high percentage may be cheap to fix, while a large rack with a modest percentage can dominate the emissions. Older gases such as R-22 and R-404A have high GWP or phase-out status, so replacement planning belongs in your capital review.
Common mistakes
Mixing refrigerant blends with single components, using a GWP from the wrong assessment report, and ignoring appliances that were topped up by a contractor without a record. Ask contractors for a service report each visit.
Frequently Asked Questions
Is refrigerant a scope 1 emission?
Yes. Leakage from owned or controlled cooling equipment is a fugitive emission and belongs in scope 1 under the GHG Protocol. Equipment you do not control, such as a landlord's chiller, may be scope 3 or excluded, depending on your boundary.
Which GWP values should I use?
Use the values required by your reporting framework. Many programmes still use IPCC AR4 or AR5 values, while others have moved to AR6. State the source in your report and keep the same set from year to year for comparability.
How do I handle blends like R-410A?
Use the published GWP for the blend, which is already weighted for its components. For example, R-410A is a blend of R-32 and R-125. Do not add the two components again.
Do I need to repair every leak?
That depends on local rules. Many regulations set leak rate thresholds that trigger repair and re-test for larger systems, and some require leak detection. Check your jurisdiction, and keep a record of each repair attempt either way.
If maintenance work orders in your ERP already record refrigerant top-ups, we can help extract them for scope 1 reporting.
Related Tools
Compressed Air Leak Cost and CO2 Calculator
Estimate how much air, electricity, money and carbon your plant's air leaks waste each year.
Safety & WorkforceEnvironmental Aspects and Impacts Register Worksheet
Score each activity's environmental aspect for severity, frequency and control, and see which ones rank as significant.
Compliance & ContractsEnvironmental Compliance Obligations Register Worksheet
Track every permit, regulation and customer requirement with owner, frequency and next due date, and see overdue items at a glance.
Safety & WorkforceHazardous Waste Container Inspection Log Worksheet
Log each container's label, closure, condition and days accumulated, and flag anything nearing your storage time limit.
More Safety & Workforce tools
See all- Hazard Identification and Risk Ranking Worksheet
- Plant HR and Labor KPI Definitions Reference
- Shift Work Fatigue Risk Assessment
- New Operator First Week Onboarding Checklist
- Production Supervisor Capability Self-Assessment
- Toolbox Talk Record Template
- Confined Space Entry Permit Template
- Hot Work Permit Template
- Emergency Action Plan Template
Keep exploring
Free tools
- Refrigerant Leak Rate and CO2e CalculatorAnnualize a refrigerant leak rate, check it against a repair threshold and convert the loss to CO2e and cost.
- Compressed Air Leak Cost CalculatorConvert a leak rate into lost compressor energy and annual cost, then test the payback of an ultrasonic leak survey and repair.
- Scope 1 and 2 Emissions CalculatorConvert natural gas, diesel, refrigerant leaks and purchased electricity into tonnes of CO2e, split by Scope 1 and Scope 2, with intensity per unit produced.