Other ERPsFree referencePDF, Excel, Word exportSage 100All Sage X3 and Sage 100 tools

Sage 100 Table and Module Prefix Reference

Sage 100 tables are named with a module prefix, an underscore and a descriptive name, which makes them easy to read through ODBC. This lookup lists the prefixes and the tables people search for most.

Download:
Table or prefixModuleWhat it stores
AR_
Accounts Receivable
Prefix for receivables tables
AP_
Accounts Payable
Prefix for payables tables
GL_
General Ledger
Prefix for general ledger tables
CI_
Common Information
Prefix for shared item, code and master tables
IM_
Inventory Management
Prefix for warehouse level inventory tables
SO_
Sales Order
Prefix for sales order tables
PO_
Purchase Order
Prefix for purchase order tables
BM_
Bill of Materials
Prefix for bill of materials tables
SY_
System
Prefix for system level tables such as company and user
CI_Item
Common Information
Item master
AR_Customer
Accounts Receivable
Customer master
AP_Vendor
Accounts Payable
Vendor master
GL_Account
General Ledger
Chart of accounts
IM_ItemWarehouse
Inventory Management
Item quantities and costs by warehouse
SO_SalesOrderHeader
Sales Order
Sales order headers
SO_SalesOrderDetail
Sales Order
Sales order lines
PO_PurchaseOrderHeader
Purchase Order
Purchase order headers
PO_PurchaseOrderDetail
Purchase Order
Purchase order lines
BM_BillHeader
Bill of Materials
Bill headers
BM_BillDetail
Bill of Materials
Bill component lines

Sage 100 data is normally read through the Sage 100 ODBC driver, which exposes these names. Table availability depends on your edition and installed modules, and names can vary slightly by version. Confirm in your own dictionary before building reports, and do not write through ODBC.

Sage 100 reporting and migration review

Optional: a short expert review of your Sage 100 reporting setup.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the lookup

Filter by module or by a word like order or bill to find the table you need, then use that name in Crystal Reports, Excel or an ODBC query. Exporting to Excel is useful when you build a mapping for a migration. The first rows show the module prefixes themselves, which helps when you meet an unfamiliar table in a report written years ago.

Reading the structure

Headers and details are separate tables, joined by the document number. Item data is split between the shared CI_Item master and warehouse level tables in Inventory Management. Because Sage 100 data can be exposed through ODBC, reporting tools connect easily, but the driver is a read channel for reports rather than a safe way to update data.

  • Join header and detail on the document number
  • CI_Item is the shared item master
  • Use business objects for any updates

Common mistakes

Frequent errors are reporting on warehouse quantities without a warehouse filter, ignoring edition differences when a module is not installed, and relying on a table name that was renamed in a newer version. Test every query against a copy and keep the ODBC login read only.

Frequently Asked Questions

How do I connect to Sage 100 data?

Most reporting tools connect through the Sage 100 ODBC driver, set up as a data source on the server or workstation. Use a dedicated read-only user.

Where are item quantities stored?

Item definitions are in CI_Item, and quantities and costs by warehouse are in the Inventory Management warehouse table. Always filter by warehouse in reports.

Are these table names guaranteed?

They are widely used, but modules, editions and versions differ. Verify in your own installation before relying on a name in production reports.

Can I write to these tables?

Not safely. Use Sage 100 business objects, Visual Integrator or supported import tools so validation and related updates run.

Many Sage 100 users reach a point where reports and integrations need rethinking. We can help assess the options.

Get Sage X3 and Sage 100 alerts

Support and maintenance deadlines, release changes that affect Sage X3 and Sage 100 sites, and new free Sage X3 and Sage 100 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Sage X3 and Sage 100: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Sage X3 and Sage 100? Start with the Sage X3 and Sage 100 guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software