Other ERPsFree checklistPDF, Excel, Word exportSage 100All Sage X3 and Sage 100 tools

Sage 100 Version Upgrade and Data Migration Checklist

This checklist covers moving Sage 100 Standard, Advanced or Premium to a new major version (for example 2023 or 2024 to 2025) with a parallel install and the Parallel Migration Wizard. It focuses on what breaks: enhancements, Custom Office, scripts, forms and integrations.

0%

0 of 32 items complete

8 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

1. Plan

2. Install

3. Migrate

4. Test

5. Go-live

Critical items are the ones that most often stop a Sage 100 upgrade: wrong upgrade path, uncertified enhancements, panel customizations and integrations still pointing to the old home path.

Planning a Sage 100 upgrade?

Send us your current version, enhancements and integrations and we will flag what needs attention before you migrate.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Work through the five groups in order and give each item an owner. Start the Plan group weeks before the install, because third-party enhancement versions and the supported upgrade path decide whether the project can happen at all. Run the Migrate and Test groups at least once against a copy before the real go-live weekend; most issues show up in the first trial migration. Export the checklist to PDF and keep it with the version numbers you installed.

Parallel install and migration

Sage 100 major versions install side by side: the new version goes into its own folder, and the Parallel Migration Wizard copies system and company data from the old installation. The old version keeps working until you switch users over, which gives you a rollback path and lets you run trial migrations. After migration, each company is converted to the new data format in Company Maintenance. Custom Office panels come forward with the Customizer Update Utility, and Crystal forms with the Crystal Report Conversion Wizard. Check the exact steps in the Installation and System Administrator's Guide for your target version.

  • Old install stays live until go-live.
  • Run at least one trial migration.
  • Convert data per company after migrating.

Worked example: integrations

A company runs a BOI script that creates sales orders from a web store, using the home path C:\Sage\Sage 100 2024\MAS90\Home. After migration to a new folder for the target version, the script still points at the old path, so orders keep landing in the old version. The test group catches it: repoint the Init path, run a test order, and update ODBC data sources the same way.

Gotchas

An enhancement that is not certified for the target version is the most common blocker, so ask early. Panel customizations that were never documented come forward only partly; test every customized screen. Scripts must be recompiled after migration. Install the workstation on every client, because older workstation installs cannot connect to the new server version. Premium needs a supported SQL Server version on the server before you start.

Frequently Asked Questions

Can I upgrade Sage 100 directly from 2023 to 2025?

That depends on the migration paths Sage supports for the target release, which are listed in its Installation and System Administrator's Guide. Most recent releases migrate directly from several prior versions, but older installs may need an intermediate step. Check the guide for the exact source versions before planning, and confirm every enhancement is certified for the target.

What is the Parallel Migration Wizard in Sage 100?

It is the utility, run from the new installation, that copies system and company data from an existing Sage 100 installation into the new one. Because the new version is installed in parallel, the old installation stays usable, which allows trial migrations and a rollback path. After migrating, convert each company's data in Company Maintenance.

How do I install the Sage 100 workstation?

After the server install and product update, run the workstation setup from the server's installation share on every client that will use Sage 100, then launch it once to confirm it connects. Workstations must match the server version and product update. For Premium, the workstation also needs network access to the SQL Server.

What happens to my Custom Office customizations when I upgrade?

Panel customizations, UDFs and scripts come across with the data, but panels must be brought forward with the Customizer Update Utility and scripts recompiled. Panels Sage changed in the new version may lose some modifications or raise Error 65. Test every customized screen and keep screenshots from the old version for comparison.

If you want a private AI layer on your upgraded Sage 100 that answers questions about orders and stock on your own servers, we can add it once the upgrade is stable.

Get Sage X3 and Sage 100 alerts

Support and maintenance deadlines, release changes that affect Sage X3 and Sage 100 sites, and new free Sage X3 and Sage 100 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Sage X3 and Sage 100: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Sage X3 and Sage 100? Start with the Sage X3 and Sage 100 guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software