Supply Chain & InventoryFree templatePDF, Excel, Word exportSage EvolutionSouth Africa

Sage Evolution Stock Adjustment Request Form

A stock adjustment changes the balance sheet and can hide theft or process failure. This form gives every adjustment a reason, an investigation note and approvals, whether you post it in Sage Evolution, SYSPRO or another ERP.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Sage Evolution Stock Adjustment Request Form

Highveld Fabrication (Pty) Ltd: Stock Adjustment Request

Request no: SA-2026-0187 Date: 2026-10-30 Warehouse: MAIN

Item details

Stock codeDescriptionSystem qtyCounted qtyUnit cost
FST-M10X40Hex bolt M10 x 40 zinc plated120011303.20

Reason and investigation

Reason: Count variance

Recount performed by two people. Possible unrecorded issue to job 4412 on 14 October. Production confirmed 70 bolts used without a transaction.

Value of adjustment

Adjustment quantity = counted quantity minus system quantity. Adjustment value = adjustment quantity times unit cost.

Calculated adjustment for this request: write the figure here after checking: ______

Checks before posting

[ ] Recount done by a second person [ ] Unprocessed receipts, issues and transfers checked [ ] Lot or serial numbers confirmed where used [ ] Correct warehouse and bin confirmed [ ] Adjustment posted in the ERP with this request number as reference

Approvals

Requested by (storeman) / Date
Reviewed by (stores manager) / Date
Approved by (financial manager) / Date
Posted by (inventory controller) / Date

Set approval limits by value in your own policy, for example a higher level for large write offs. Quote the request number as the reference on the ERP adjustment so the audit trail is complete.

Analyse your stock adjustment history

Optional: a read only analysis of adjustments by item, reason and user to find patterns.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Complete one form per item and warehouse. Enter the system and counted quantity, the unit cost and the reason, then explain what you checked. After exporting, work through the checks, collect the signatures and post the adjustment in the ERP using the request number as reference. File the signed form with the stock count sheets for the audit trail.

The control behind it

The control is separation of duties. The person who counts does not approve, and the person who approves does not post. The investigation line forces someone to look for unprocessed transactions before writing stock off, which removes many apparent variances. Value thresholds let small differences be cleared quickly and large ones get senior attention.

  • Counter, approver and poster are different people
  • Reason codes support later trend analysis
  • Value limits set by policy
  • Request number recorded in the ERP

Common mistakes

Adjusting before checking for unposted goods receipts, job issues or transfers is the most frequent error, and it creates a second error when the late transaction is posted. Using the wrong reason code makes shrinkage invisible. Adjusting at the wrong unit cost distorts valuation, so check the cost the ERP will apply.

Frequently Asked Questions

Is this form specific to Sage Evolution?

No. The fields apply to any ERP. We named Sage Evolution because many South African stores teams use it. Replace the field values with your own stock codes and warehouse names.

Who should approve adjustments?

Set limits in your policy. A stores manager can clear small values, and the financial manager or a director approves larger ones. The person posting should not be the person who counted.

Should I adjust every variance?

Only after investigation. Check unposted receipts, issues, transfers and returns first. Adjust the remainder, and track reasons so you can fix root causes rather than repeat the same write offs.

How do I handle serial or lot items?

Record the specific lot or serial numbers affected and adjust at that level in the ERP. Adjusting the total quantity alone leaves the traceability records wrong.

If variances keep recurring, we can analyse your adjustment history and show which items, bins and reasons drive them.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring