Other ERPsFree referencePDF, Excel, Word exportSage X3All Sage X3 and Sage 100 tools

Sage X3 4GL Syntax Reference: Loops, Database, Errors and Functions

A searchable reference of the Sage X3 4GL (L4G) keywords developers look up most on V11 and V12: loops, database reads and writes, transactions, error handling, string, number and date functions. Each row gives a one-line syntax example and the practical gotcha, and the fstat return codes are listed with their constant names.

Download:
KeywordGroupSyntax (example)Notes
For ... To ... Next
Loops
For I = 1 To 10 : ... : Next I
Counter loop; a Step clause changes the increment.
For (list of values)
Loops
For CODE = "A", "B", "C" : ... : Next CODE
Loops over an explicit list of values.
For [table] Where
Loops
For [ITM]ITM0 Where ITMSTA = 1 : ... : Next
Database read loop on a key with optional Where; fields land in [F:ITM].
For ... Sql ... As
Loops
For (Char ITMREF(20)) From "<db type>" Sql "select ITMREF_0 from ..." As [YSQL]
Loop over a native SQL statement; database type code is a string.
While ... Wend
Loops
While I < 10 : I += 1 : Wend
Tests the condition before each pass.
Repeat ... Until
Loops
Repeat : I += 1 : Until I >= 10
Body runs at least once.
If ... Elsif ... Else ... Endif
Conditions
If A = 1 : ... : Elsif A = 2 : ... : Else : ... : Endif
Elsif avoids nested If blocks.
Case ... When ... Endcase
Conditions
Case STA : When 1 : ... : When 2, 3 : ... : When Default : ... : Endcase
When Default handles all other values.
Local File
Database
Local File ITMMASTER [ITM]
Opens a table with an abbreviation for the current script level.
Read
Database
Read [ITM]ITM0 = "A100"
Reads one record by key; also First, Last, Next, Prev, Curr, and <=, >= modes. Check fstat after.
Readlock
Database
Readlock [ITM]ITM0 = "A100"
Reads and locks the line until the end of the transaction or Unlock. Use inside Trbegin.
Look
Database
Look [ITM]ITM0 = "A100"
Tests existence; same syntax as Read but [F] fields are not loaded. Not usable on Link joins.
Write
Database
Write [ITM]
Inserts the current [F:ITM] record; fstat 3 means duplicate key.
Rewrite
Database
Rewrite [ITM]
Updates the line read previously; fstat 6 means another user changed it (updtick).
Delete
Database
Delete [ITM]ITM0 = "A100"
Deletes a line; fstat 7 is a delete conflict.
Update ... Where ... With
Database
Update [ITM] Where ITMSTA = 6 With ITMDES2 = "OBSOLETE"
Set-based update of many lines in one statement.
Link
Database
Link [SOP] With [SOH]SOH0 = [F:SOP]SOHNUM As [LNK]
Declares a join read with one Read or For on [LNK].
Filter
Database
Filter [ITM] Where TCLCOD = "FG"
Applies a persistent Where to later reads; an Order By clause can change the access key. Filter [ITM] alone removes it, and a new Filter replaces the previous one.
Columns
Database
Columns [ITM] (ITMREF, ITMDES1)
Limits the columns loaded by For loops; add Extended to apply it to Read and Readlock too. Columns [ITM] alone restores all columns.
fstat
Error handling
If fstat <> [V]CST_AOK : ... : Endif
Status after every database instruction; compare with constants, not numbers.
fstat 0 [V]CST_AOK
Error handling
fstat = [V]CST_AOK
Operation succeeded.
fstat 1 [V]CST_ALOCK
Error handling
fstat = [V]CST_ALOCK
Record locked by another user.
fstat 2 [V]CST_AOUTSEARCH
Error handling
fstat = [V]CST_AOUTSEARCH
Read with <= or >= found a record whose key is not an exact match.
fstat 3 [V]CST_ADUPKEY
Error handling
fstat = [V]CST_ADUPKEY
Duplicate value on a unique index.
fstat 4 [V]CST_AOUTKEYS
Error handling
fstat = [V]CST_AOUTKEYS
Key value is below or above all existing keys.
fstat 5 [V]CST_ANOREC
Error handling
fstat = [V]CST_ANOREC
No record read (no current record).
fstat 6 [V]CST_ARECTICKUPD
Error handling
fstat = [V]CST_ARECTICKUPD
Update conflict: the updtick value changed since the read.
fstat 7 [V]CST_ARECTICKDEL
Error handling
fstat = [V]CST_ARECTICKDEL
Delete conflict on updtick.
Onerrgo
Error handling
Onerrgo ERR_LBL
Branches to a label on a runtime error; Onerrgo alone cancels it.
Resume
Error handling
Resume
Returns from an Onerrgo label to the instruction after the error.
errn / errmes$ / errl
Error handling
MSG = errmes$(errn) + " line " + num$(errl)
Error number, message for a number, and line of the last error.
Trbegin
Transactions
Trbegin [ITM]
Starts a transaction; only one level is supported, test adxlog first.
Commit
Transactions
Commit
Only valid in the script or subprogram level that ran Trbegin.
Rollback
Transactions
Rollback
Undoes all updates since Trbegin, including tables opened before it.
adxlog
Transactions
If adxlog : ... : Endif
1 when a transaction is already in progress, otherwise 0.
format$
Strings
format$("N3:10.2", AMT) ; format$("D:DD[/]MM[/]YYYY", date$)
Type letter K, N, D or LAnnn, options, colon, mask; bracketed text is literal.
num$
Strings
num$(QTY)
Converts any value (number, date, uuid) to its string form.
val
Numbers
val("12.5")
Converts a string to a number.
left$ / right$
Strings
left$(ITMREF, 3) ; right$(ITMREF, 4)
right$ takes the substring from the given position to the end.
mid$
Strings
mid$(STR, 2, 3)
Substring from a start position for a length.
seg$
Strings
seg$(STR, 4, 6)
Substring from a start position to an end position.
len
Strings
len(STR)
Length of the string.
instr
Strings
instr(1, STR, "GHI")
Position of a substring, searching from a start position; 0 if absent.
string$
Strings
string$(5, "-")
Repeats a string or character code n times.
toupper / tolower
Strings
toupper(STR)
Case conversion.
ctrans
Strings
ctrans(STR) ; ctrans(STR, "ab", "AB")
Removes accents by default, or maps characters with your own tables.
date$
Dates
D = date$
Current date.
gdat$
Dates
gdat$(1, month(date$), year(date$))
Builds a date from day, month and year.
eomonth
Dates
eomonth(date$)
Last day of the month of the given date.
addmonth
Dates
addmonth(date$, 6)
Adds months to a date.
nday
Dates
nday(D)
Days since 1/1/1600; same as D - [1/1/1600].
day / month / year
Dates
year(date$)
Extracts parts of a date as integers.
Call
Subprograms
Call CONTROL(ITMREF, OK) From YSPEITM
Calls a Subprog in another script.
Subprog ... End
Subprograms
Subprog CONTROL(ITMREF, OK) : Value Char ITMREF() : Variable Integer OK : ... : End
Value parameters are copies, Variable parameters are by reference.
Funprog ... End
Subprograms
Funprog TOTAL(A, B) : Value Decimal A, B : End A + B
Function returning a value; called with func SCRIPT.TOTAL(1, 2).
Gosub ... Return
Subprograms
Gosub CALC : ... : $CALC : ... : Return
Jumps to a label in the same script; labels start with $.
Raz
Variables
Raz [F:ITM]
Sets variables or a whole class to null values.

Syntax and fstat values follow the Sage X3 V12 developer help (V7DEV 4GL pages). Check your version's help for exact optional clauses. Examples are illustrative; adapt table abbreviations and fields to your folder.

Get your specific code reviewed

Send us a Sage X3 script that misbehaves under load or after an update and we will review its transaction and error handling.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Type in the search box to filter by keyword or group, for example fstat, Readlock or format$. The syntax column is written the way you type it in the editor, with colons standing in for line breaks. Export the table to Excel if you want a desk copy for a project team. The notes column holds the behaviour that trips people up, such as Look not loading [F] fields or Commit only working at the level that ran Trbegin.

  • Filter by group to see all database instructions together.
  • Use the constant names, not numbers, when testing fstat.
  • Keep the export with your specific-development standards.

Where this lives in Sage X3

From V7 onward, 4GL scripts are edited in the Eclipse-based Sage X3 development environment connected to a folder, or in the classic process editor under Development > Processes. Specific and vertical scripts conventionally start with Y, Z or X and are protected by activity codes so patches do not overwrite them. Tables are declared with Local File and an abbreviation, and the current record of a table lives in the [F:abbreviation] class. Database instructions set fstat; runtime errors set errn and can be trapped with Onerrgo.

Worked example: safe update of one item

To change ITMDES2 on item A100 safely: test adxlog and start Trbegin [ITM] only if no transaction is running. Readlock [ITM]ITM0 = "A100" and check fstat: CST_ALOCK means another user holds it, CST_ANOREC means it does not exist. Set [F:ITM]ITMDES2, then Rewrite [ITM]. If fstat is CST_ARECTICKUPD someone changed the record since your read, so Rollback and report; otherwise Commit. The same pattern applies inside a For loop, but keep transactions short so locks are not held across hundreds of lines.

Version differences and gotchas

Only one transaction level exists, so a subprogram called inside a transaction must not start its own; check adxlog. Rollback covers tables opened before Trbegin too. Rewrite and Delete compare the updtick column, which is why fstat 6 and 7 exist. Onerrgo is scoped to the current script level; a called subprogram needs its own if you want it to trap errors. format$ masks put literal separators in square brackets, as in D:DD[/]MM[/]YYYY.

Frequently Asked Questions

How do I write a For loop on a table in Sage X3?

Declare the table with Local File ITMMASTER [ITM], then use For [ITM]ITM0 Where ITMSTA = 1 followed by your instructions and Next. Each pass loads the record into [F:ITM]. Add Columns to limit fields and keep the Where on indexed columns where possible for large tables.

How do I format a number or date with format$ in Sage X3?

format$ takes a mask and a value. The mask starts with a type letter (N for number, D for date, K for string), optional option letters, a colon, then positions. format$("N3:10.2", AMT) groups thousands with two decimals; format$("D:DD[/]MM[/]YYYY", date$) prints a day-month-year date with literal slashes.

What does fstat 6 mean in Sage X3?

fstat 6, constant [V]CST_ARECTICKUPD, is an update conflict: the line no longer has the updtick value it had when you read it, so another process changed it. Roll back, reread the record and retry or report the conflict to the user instead of overwriting their change.

How does error handling work in Sage X3 4GL?

Database instructions return a status in fstat, which you test after each call. Runtime errors are trapped with Onerrgo LABEL; inside the label, errn gives the error number, errmes$(errn) the message and errl the line. Use Resume to continue after the failing instruction, or exit cleanly with a Rollback.

If you want a private assistant that answers questions about your Sage X3 data and specific code from your own servers, we can set that up.

Get Sage X3 and Sage 100 alerts

Support and maintenance deadlines, release changes that affect Sage X3 and Sage 100 sites, and new free Sage X3 and Sage 100 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Sage X3 and Sage 100: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Sage X3 and Sage 100? Start with the Sage X3 and Sage 100 guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations

Software