SAPFree referencePDF, Excel, Word exportSAP HANAAll SAP HANA and Basis tools

SAP HANA SQL Error Codes: Meaning, Cause and First Fix

This reference lists common SAP HANA 2.0 SQL error codes, from 4 (cannot allocate enough memory) through lock and deadlock rollbacks to privilege, syntax and data errors, with the first diagnostic and fix for each. Developers and DBAs can filter by code or by text.

Download:
CodeError textTypical causeFirst diagnosticFix
4
Cannot allocate enough memory
Statement or service hit the allocation limit or statement_memory_limit
OOM trace (*.rtedump.*.oom.trc) in the trace directory; M_SERVICE_MEMORY; M_EXPENSIVE_STATEMENTS
Fix the statement (filters, joins), reduce memory consumers, or adjust limits after sizing review
7
Feature not supported
SQL feature or syntax not available for this object type or revision
SQL reference for your SPS
Rewrite the statement or check revision support
10
Authentication failed
Wrong user or password, locked user, or failed SSO
M_CONNECTIONS; USERS view (USER_DEACTIVATED, INVALID_CONNECT_ATTEMPTS)
Check credentials and user status; reset or unlock the user
129
Transaction rolled back by an internal error
A follow-on error rolled back the transaction
The preceding error in the indexserver trace
Fix the underlying error shown before it
131
Transaction rolled back by lock wait timeout
Waited longer than the lock wait timeout for a lock held by another transaction
M_BLOCKED_TRANSACTIONS; M_TRANSACTIONS for the lock owner
Find and fix the long-holding transaction; shorten transactions and commit sooner
133
Transaction rolled back by detected deadlock
Two transactions waited for each other's locks
Indexserver trace deadlock information
Access tables and rows in a consistent order; retry logic in the application
139
Current operation cancelled by request and transaction rolled back
Statement cancelled by a user, client timeout or ALTER SYSTEM CANCEL SESSION
Who cancelled: client logs, M_CONNECTIONS
Find why it ran so long (plan cache, expensive statements)
146
Resource busy and NOWAIT specified
SELECT FOR UPDATE NOWAIT or lock statement found the row or table locked
M_BLOCKED_TRANSACTIONS
Retry later or remove NOWAIT
257
SQL syntax error
Invalid SQL, often reserved words or quotes
Position given in the error message
Correct the syntax; quote reserved identifiers with double quotes
258
Insufficient privilege
User lacks the object, schema, system or analytic privilege
Error text names the missing privilege in newer revisions; EFFECTIVE_PRIVILEGES view; system procedure GET_INSUFFICIENT_PRIVILEGE_ERROR_DETAILS
Grant the specific privilege or role, not broad schema rights
259
Invalid table name
Table does not exist in the current schema or name case mismatch
TABLES view; CURRENT_SCHEMA
Qualify with schema; use correct case in double quotes
260
Invalid column name
Column misspelled, wrong case or not in that table
TABLE_COLUMNS view
Correct the column name or alias
261
Invalid index name
Index does not exist
INDEXES view
Correct the name or create the index
268
Column ambiguously defined
Same column name in more than one joined table without alias
Statement joins
Prefix columns with table aliases
274
Inserted value too large for column
Value longer than the column length
TABLE_COLUMNS LENGTH
Truncate or validate input, or enlarge the column
287
Cannot insert NULL or update to NULL
NOT NULL column received NULL
TABLE_COLUMNS IS_NULLABLE
Supply a value or a default
288
Cannot use duplicate table name
CREATE TABLE for a name that already exists
TABLES view
Drop, rename or use a different name
301
Unique constraint violated
Insert or update duplicates a primary key or unique index
Error names the index; check existing rows
Fix the data or use UPSERT where appropriate
304
Division by zero undefined
Divisor evaluated to 0 in an expression
The expression in the statement
Use NULLIF(divisor, 0) or a CASE expression
305
Single-row query returns more than one row
Scalar subquery or SELECT INTO returned several rows
Run the subquery alone
Add filters, aggregate, or use TOP 1 with ORDER BY
314
Numeric overflow
Result exceeds the data type range or precision
Data types of the expression
Cast to a larger type such as BIGINT or DECIMAL with more precision
328
Invalid name of function or procedure
Function or procedure does not exist in that schema
FUNCTIONS and PROCEDURES views
Qualify the schema or create the object
339
Invalid number
String that is not a number converted to a numeric type
Source column values
Clean data or use a safe conversion with CASE checks
340
Not all variables bound
Prepared statement executed with missing parameter values
Client code binding parameters
Bind every ? parameter before execute
362
Invalid schema name
Schema does not exist or user cannot see it
SCHEMAS view
Correct the schema or grant access
383
Invalid identifier
Identifier name not valid, often unquoted special characters
Statement text
Quote identifiers with double quotes
414
User is forced to change password
Initial or reset password must be changed at first logon
USERS view PASSWORD_CHANGE_NEEDED
Log on interactively and change it, or disable the requirement for technical users (ALTER USER ... DISABLE PASSWORD LIFETIME)
416
User is deactivated
User deactivated, often after too many failed logons
USERS view USER_DEACTIVATED, INVALID_CONNECT_ATTEMPTS
ALTER USER <user> ACTIVATE USER NOW after fixing the client that sent the wrong password
613
Execution aborted by timeout
Statement exceeded a configured statement or client timeout
Client timeout settings; M_EXPENSIVE_STATEMENTS
Tune the statement or raise the timeout deliberately
2048
Column store error
Generic column store engine error; the detail text after it matters
Full error text and indexserver trace
Act on the detail (for example table not loaded, merge or memory issue)

Codes and texts are those returned by SAP HANA 2.0 SQL. The full list is in the SQL Error Codes page of the SAP HANA SQL Reference, and also in system view M_ERROR_CODES (columns CODE, CODE_STRING, DESCRIPTION) in your own database. Query it to confirm any code: SELECT * FROM M_ERROR_CODES WHERE CODE = 258.

Recurring HANA errors in production?

Send us the error text and the relevant trace excerpt and we will return a reviewed cause and fix.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Take the numeric code from the error, for example SQL error 131 or SAP DBTech JDBC: [258], and filter the table. The first diagnostic column names the system view or trace to open. To get the exact text for any code on your own revision, query M_ERROR_CODES, which lists every code with its CODE_STRING and DESCRIPTION; that view is the authoritative source for your system and covers codes not listed here. Codes in the 100s are mostly transaction and lock errors, 250 to 450 are SQL, object and user errors, and higher codes come from specific engines such as the column store (2048).

Out of memory (error 4) and OOM dumps

Error 4 means the statement or service could not get memory within its limit. HANA writes an OOM trace file in the trace directory, named like indexserver_<host>.<port>.rtedump.<timestamp>.oom.trc, which shows the memory state, the allocators and the statement that failed. Read the top allocators and the failing statement first. If one statement regularly runs out, statement_memory_limit (section memorymanager in global.ini) can cap a single statement so that it fails instead of the whole service; check its current value in M_INIFILE_CONTENTS. If many statements fail, the system is undersized or a memory consumer such as a large delta store or cache needs attention.

Worked example: error 131 every morning

A batch load fails at 07:10 with error 131, transaction rolled back by lock wait timeout. At 07:05 a query on M_BLOCKED_TRANSACTIONS during the next run shows the load blocked on table ZSALES_STAGE, and LOCK_OWNER_TRANSACTION_ID points to a connection in M_CONNECTIONS from a reporting tool that started an update and never committed. The fix is in the tool (commit or use autocommit for that step), not in raising the lock wait timeout. Raising the timeout only makes the load wait longer before it fails.

Common mistakes

Error 258 is often solved by granting a whole schema or a powerful system privilege; grant the specific object privilege or role instead, and use the insufficient privilege details the system provides. Division by zero (304) is best handled in SQL with NULLIF. Errors 259 and 260 are frequently case problems: unquoted names are converted to upper case, quoted names are not. And 129 is never the real error: look for what happened just before it.

Frequently Asked Questions

What is SAP HANA error code 4?

Error 4 is cannot allocate enough memory. A statement or service reached its allocation limit or the statement memory limit. Check the OOM trace file in the trace directory, M_SERVICE_MEMORY and expensive statements, then fix the statement or review sizing before raising limits.

How do I fix the SAP HANA division by zero error?

Error 304, division by zero undefined, comes from an expression whose divisor is 0. Wrap the divisor with NULLIF(divisor, 0) so the result becomes NULL, or use a CASE expression to return 0 or another value when the divisor is zero.

Where can I find the full list of SAP HANA error codes?

In the SQL Error Codes section of the SAP HANA SQL Reference on help.sap.com, and directly in your database through the system view M_ERROR_CODES, which returns CODE, CODE_STRING and DESCRIPTION for every code known to your revision.

What does SAP HANA error 258 insufficient privilege mean?

The user lacks an object, schema, system or analytic privilege needed by the statement. Newer revisions add details about the missing privilege and offer a procedure to retrieve them. Grant the specific privilege or a role that contains it rather than broad rights.

If you want your team to paste a HANA error and get the likely cause from your own system views, answered privately on your servers, we can set that up.

Get SAP HANA and Basis alerts

Support and maintenance deadlines, release changes that affect SAP HANA and Basis sites, and new free SAP HANA and Basis tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP HANA and Basis: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations