Free SAP tools
477 templates, calculators, worksheets and reference tables. Each runs in your browser and exports to PDF, Excel, Word or CSV.
Templates and forms
SAP Release Strategy Design Template
Fill-in design document for a classic SAP release procedure: groups, codes, characteristics, approval levels and test cases.
SAP Physical Inventory Count Sheet Template
Fill in a count plan and count sheet for SAP physical inventory (MI01, MI04, MI07) and export it as a document.
SAP Purchase Requisition Approval Form Template
An approval form that mirrors the fields of an SAP purchase requisition so approvers see what they release in ME54N.
SAP Material Master Creation Request Form Template
A request form for new SAP materials that collects the views, MRP and costing data master data teams need before running MM01.
SAP Goods Receipt Discrepancy Report Template
Document shortages, overages, damage and wrong items found at receipt against the PO, and send the report to the vendor.
SAP MRP Controller Daily Worklist Template
A fill-in daily worklist for MRP controllers to record exception reviews, actions taken and open items from MD04, MD06 and MD07.
SAP Work Center Master Data Request Template
A request form for creating or changing an SAP PP work center, covering basic data, capacity, scheduling and costing so master data gets it right the first time.
SAP PP Master Data Change Request Template
A controlled change form for BOMs, routings, work centers and MRP data with impact assessment, approvals and rollback.
SAP Production Order Variance Review Template
A structured review document for investigating production order variances before settlement, with causes and corrective actions.
SAP PP Business Blueprint Workshop Template
A workshop record for the SAP PP blueprint phase capturing scope, org structure, process flow, master data and open gaps.
SAP Delivery Block Reasons Template
A fill-in document to define a new delivery block reason or record a block on an order, with level, justification and release rules.
SAP SD Enhancement Functional Specification Template
A fill-in functional spec for SD enhancements: requirement, trigger point, logic rules, data touched, test cases and sign-off. Exports to PDF or Word.
SAP SD Partner Determination Design Template
Document your partner functions, partner determination procedures and sources per document level, then export a design page for review.
SAP SD Rebate Agreement Request Form Template
A request form for creating a volume rebate agreement in SAP SD: who qualifies, what is measured, scale, accrual treatment and approval.
SAP GL Account Master Data Request Template
A fill-in request form for creating or changing a G/L account in SAP, with the settings your FS00 or master data team needs to see.
SAP Vendor Master Change Request Form Template
A controlled form for vendor bank, payment term and address changes in SAP, with a call back verification record to reduce payment fraud.
SAP Internal Order Budget Request Template
A request form to open an SAP CO internal order with its budget, responsible person and settlement receiver.
SAP QM Sampling Procedure Design Template
Fill in the key choices for a sampling procedure and produce a design document you can review with quality and the SAP team.
SAP QM Inspection Plan Design Template
A design document you fill in before building an inspection plan in QP01: scope, operations, characteristics, sampling and sign-off.
SAP QM Quality Notification 8D Report Template
An 8D problem-solving report laid out to match the data in a SAP QM quality notification, so the document and the SAP record stay aligned.
SAP QM Certificate of Analysis Profile Template
A requirements document for the certificate of analysis your customers expect from SAP QM, with the layout and sample certificate content in one place.
SAP Functional Location Structure Template
Document your SAP PM functional location hierarchy, structure indicator and labeling rules in one clean design document.
SAP Equipment Master Data Template
Collect the data needed to create an equipment master record in SAP PM and export it as a clean data sheet.
SAP PM Breakdown Notification Request Form Template
A paper-or-PDF form that captures every field a planner needs to key a malfunction report (M2) into SAP PM, so nothing is chased by phone afterwards.
SAP PM Shutdown and Turnaround Work Package Template
A structured work package document for one job in a planned shutdown, linking the SAP order, notification, permits, parts and crew in one place.
SAP PM Work Clearance and Work Permit Template
A permit-to-work form tied to a SAP maintenance order, covering isolation, hazards, authorizations and close-out signatures.
SAP Handling Unit Label Template
Fill in handling unit data and get a label layout with SSCC and GS1 application identifiers, ready to hand to a label developer or warehouse team.
SAP EWM Go-Live Cutover Plan Template
A fill-in document template for planning an SAP EWM warehouse cutover, from freeze and physical count to reconciliation and go/no-go.
SAP EWM Warehouse Order Creation Rule Design Template
A fill-in design document for how warehouse tasks are bundled into warehouse orders in SAP EWM, with filters, limits and sorting captured.
SAP EWM Inbound Delivery Discrepancy Report Template
A fill-in report to document shortages, overages and damage found at goods receipt against an inbound delivery in SAP EWM.
ABAP Naming Convention Template
A fill-in development standard that defines prefixes for variables, parameters, classes, DDIC objects, programs and CDS views.
ABAP Functional Specification Template
A fill-in functional spec for RICEFW objects that functional consultants hand to ABAP developers. Exports to PDF or Word.
ABAP Technical Design Document Template
A technical specification skeleton for ABAP developers: repository objects, data access, error handling, performance and testing.
ABAP Technical Specification Template
A fill-in technical design document for a custom ABAP object that exports to PDF or Word, ready for review and sign-off.
SAP User Access Review Template
A fill-in document template for SAP user access reviews that records scope, method, findings and approvals, ready to hand to auditors.
SAP Background Job Scheduling Template
A fill-in job request form that captures everything a Basis admin needs to schedule a background job in SM36 and monitor it in SM37.
SAP Firefighter Emergency Access Request Template
A fill-in emergency access request and post-use review form for SAP firefighter or privileged IDs. Exports to PDF or Word for your audit file.
SAP Role Change Request Form Template
A fill-in change request for adding or removing authorizations in an SAP role, with SoD check and test evidence sections.
SAP Security Incident Report Template
A structured incident report for suspicious SAP activity such as misused accounts, unexpected RFC calls or unauthorized changes.
SAP CPI iFlow Design Template
A fill-in design document for an SAP Cloud Integration iFlow, covering adapters, mappings, exception handling and monitoring, ready to hand to reviewers.
SAP IDoc Partner Profile (WE20) Setup Template
A fill-in setup sheet for WE20 partner profiles, WE21 ports and the inbound and outbound parameters behind each IDoc partner.
SAP IDoc Error Incident Ticket Template
A structured ticket for IDoc failures: control record details, status history, root cause, fix and prevention actions.
SAP IDoc Reprocessing Runbook Template
A fill-in runbook that tells support staff how to select, check and reprocess failed IDocs for one interface, with approvals and rollback notes.
SAP Integration Technical Specification Template
A technical specification document for one SAP interface: purpose, data flow, technology, error handling, security and monitoring.
SAP IDoc Interface Specification Document Template
Fill in a structured functional and technical specification for an IDoc-based interface and export it as a clean document.
SAP Go-Live Hypercare Plan Template
A fill-in hypercare plan for the weeks after SAP go-live, with severity targets, war room schedule, exit criteria and approvals.
SAP S/4HANA Project Charter Template
A fill-in charter for an ECC to S/4HANA program: objectives, scope, conversion approach, governance and sign-off. Exports to PDF or Word.
SAP S/4HANA Steering Committee Status Report Template
A one-page monthly status report for SAP S/4HANA steering committees: RAG by workstream, milestones, top risks and decisions needed.
SAP B1 Approval Procedure Template
Fill in thresholds and approvers to generate a written SAP Business One approval procedure you can sign and configure from.
SAP B1 Business Partner Master Data Request Form
A fill-in request form for creating or changing a customer or vendor in SAP Business One, with the fields finance needs and an approval block.
SAP Business One Implementation Project Charter Template
A fill-in charter that sets scope, modules, phases, roles and risks for a Business One rollout before the work starts.
SAP Business One User Acceptance Test Script Template
A fill-in UAT script for one Business One scenario, with prerequisites, numbered steps, expected results and a sign-off block.
SAP Configuration Profile Setup Template
Document the configuration profile of a configurable material: class assignment, dependencies, BOM explosion level and the checks before release.
SAP Variant Configuration Sales Order UAT Script Template
A test script for configured sales orders covering value entry, dependency checks, BOM explosion, pricing and result recording.
SAP PM Inspection Checklist Template
Fill-in inspection checklist for SAP PM with task list, characteristic and limit columns, plus a clear explanation of how checklists are built in SAP.
SAP Purchase Order Example, Format and Document Types
A sample SAP purchase order layout with header, item and delivery data, plus a quick reference of PO document types such as NB, FO and UB.
SAP ECC Private AI Layer Blueprint Generator
Fill in your version, database, hosting and use cases to get an architecture plan for adding a private, on-prem AI assistant to SAP ECC 6.0, with components, security controls and a three-phase rollout.
SAP S/4HANA On-Prem Private AI Layer Blueprint Generator
Fill in your version, database, hosting and use cases to get an architecture plan for adding a private, on-prem AI assistant to SAP S/4HANA, with components, security controls and a three-phase rollout.
SAP Business One Private AI Layer Blueprint Generator
Fill in your version, database, hosting and use cases to get an architecture plan for adding a private, on-prem AI assistant to SAP Business One, with components, security controls and a three-phase rollout.
SAP BW and BW/4HANA Private AI Layer Blueprint Generator
Fill in your version, database, hosting and use cases to get an architecture plan for adding a private, on-prem AI assistant to SAP BW/4HANA, with components, security controls and a three-phase rollout.
SAP PI/PO Private AI Layer Blueprint Generator
Fill in your version, database, hosting and use cases to get an architecture plan for adding a private, on-prem AI assistant to SAP PI/PO, with components, security controls and a three-phase rollout.
Worksheets
SAP GR/IR Clearing Worksheet
Editable worksheet that computes the GR/IR balance per purchase order line from receipts and invoices, with ageing for month end clearing.
SAP Info Record Mass Upload Worksheet
Editable worksheet for preparing info record data (EINA, EINE fields) with price per unit and annual value checks before upload.
SAP Vendor Evaluation Scorecard Worksheet
Score vendors on price, quality, delivery and service with weighted points that mirror SAP vendor evaluation (ME61 and ME6x).
SAP Subcontracting Component Tracking Worksheet
Track components sent to a subcontractor, expected consumption and what should still be on their premises.
SAP Scheduling Agreement Delivery Schedule Worksheet
Lay out schedule lines for a scheduling agreement, track cumulative quantity against the target and see open balance.
SAP Material Valuation and Price Unit Worksheet
A fill-in worksheet that recomputes inventory value per material from quantity, price and price unit, so you can reconcile with MBEW or migration loads.
SAP Routing Upload Worksheet (Excel)
An editable worksheet to stage routing operations before upload, with computed lot time per operation and an export to Excel or CSV.
SAP MRP Material Parameters Worksheet
An editable worksheet for reviewing MRP view settings per material, with total replenishment lead time and a safety stock coverage check.
SAP Work Center Weekly Load Worksheet
A weekly capacity versus load sheet per work center using the SAP available capacity logic, with utilization and free hours.
SAP PP Cutover Data Load Tracker
An editable tracker for PP master data loads during migration cycles, with load success rates and remaining records.
SAP PP BOM Component Scrap and Requirements Worksheet
List components with quantity per, base quantity, assembly and component scrap, and see required quantity and cost for the order.
SAP Pricing Procedure Design Worksheet
An editable worksheet to lay out a pricing procedure step by step, test the net value with example numbers and export it to Excel for the blueprint.
SAP SD Condition Record Load Worksheet
Prepare price and discount condition records row by row, check the per-unit value and export to Excel for LSMW, migration cockpit or manual VK11 entry.
SAP SD Customer Master Sales Area Load Worksheet
Collect sales area data per customer: sales org, channel, division, shipping, incoterms, payment terms and tax classification, then export to Excel.
SAP SD Copy Control Design Worksheet
Plan every copy control path in your order to cash flow: source document, target document, item category, copy requirements and pricing type.
SAP Cost Center Hierarchy Upload Worksheet
Lay out cost centers and their parent groups in one sheet, check lengths, and export the file for your upload tool.
SAP CO-PA Value Field Mapping Worksheet
Map each CO-PA value field to its source condition or cost, set the sign, and test the contribution margin result.
SAP Fixed Asset Depreciation Schedule Worksheet
Editable asset list with straight line depreciation per asset and totals, useful for planning, migration checks and sanity checks of AFAB output.
SAP Accrual Journal Entry Worksheet
Month end accrual list with a calculated accrual per item, based on service period, days received and amount already invoiced.
SAP Intercompany Reconciliation Worksheet
Pairwise intercompany balance comparison with difference, percent difference and reason tagging, ready for the close meeting.
SAP Foreign Currency Valuation Worksheet
Open item list with historic and closing exchange rates that calculates unrealized gain or loss, for checking an FAGL_FCV valuation run.
SAP QM Usage Decision Codes Worksheet
Plan usage decision code groups and codes, with valuation, stock posting and quality score, before you configure them in SAP QM.
SAP Master Inspection Characteristic Upload Worksheet
Collect master inspection characteristics in one worksheet, check tolerances and export a clean file for your data load.
SAP QM Inspection Results Recording Worksheet
Record measured values per characteristic, see deviation from target and in-tolerance status, and keep a paper copy to key into SAP QE51N.
SAP QM Vendor Quality Score Worksheet
Calculate vendor lot acceptance rate, defective PPM and a weighted quality score from QM inspection data before you load or compare with SAP vendor evaluation.
SAP QM Master Data Cutover Tracker Worksheet
Track each QM master data object through a migration: source records, loaded, errors and percent complete, with a total for the cutover meeting.
SAP QM Calibration Equipment Register Worksheet
A register of test equipment with calibration interval, as-found and as-left error and tolerance use, to prepare or reconcile SAP QM calibration data.
SAP QM Inspection Plan Planning Worksheet
A planning table for inspection operations, characteristics, limits, sample and effort, ready to review before QP01 entry.
SAP PM Task List Upload Worksheet
Build equipment or general task list operations row by row, total the work hours and export a clean Excel file for your SAP upload.
SAP PM Measuring Point and Counter Readings Worksheet
Log counter readings for running hours or cycles, compute daily usage and the days left until a performance-based service is due.
SAP PM Maintenance BOM and Spare Parts Cost Worksheet
Plan the maintenance BOM for an asset: parts, item category, criticality and cost, ready to load into CS01 or use as a stocking review.
SAP PM Spare Parts Kitting and Reservation Worksheet
Track which parts each maintenance order needs, what is on hand, what is short and what it costs to buy, before the kit is picked.
SAP PM Catalog and Code Group Design Worksheet
Plan code groups and codes for damage, cause, object part and activity, so failure data becomes something you can analyze.
SAP PM Equipment Criticality Ranking Worksheet
Score each equipment item for consequence and likelihood, get a weighted criticality percentage, and use it to assign an ABC indicator in SAP PM.
SAP Storage Type Design Worksheet
An editable worksheet to design storage types with bin counts, capacity and strategy choices, with computed total capacity and utilization.
SAP EWM Storage Bin Master Data Load Worksheet
Editable worksheet for staging storage bin master data before loading it into SAP EWM, with computed bin volume and usable capacity.
SAP WM to EWM Migration Object Mapping Worksheet
Editable worksheet to map each SAP WM object to its EWM equivalent and track owner, decision and effort for a WM to EWM migration.
SAP EWM Warehouse Task Exception Log Worksheet
An editable log to track warehouse task exceptions, short picks and stuck tasks with age, owner and root cause during hypercare and daily operations.
SAP EWM RF Transaction Test Script Worksheet
An editable test script for RF and mobile scenarios in SAP EWM that tracks steps, expected results, outcomes and pass rate.
SAP Transport Request Log Worksheet
An editable log of transport requests with owner, type, target system, release and import status, exportable to Excel.
ABAP Unit Test Case Worksheet
An editable test case log for ABAP objects with expected and actual values, variance and pass/fail status, exportable to Excel.
ABAP Field Mapping Specification Worksheet
A source-to-target field mapping sheet for SAP interfaces and data migration with length checks, rules and sign-off status.
SAP RICEFW Object Inventory Worksheet
A RICEFW inventory with build and test hours, owner and status that totals effort for the whole development backlog.
ABAP RICEFW Estimation Worksheet
List each report, interface, conversion, enhancement, form and workflow, enter hours and risk, and get totals and cost.
SAP Role Design Worksheet
An editable worksheet for designing SAP single, derived and composite roles with transaction counts, critical objects and an exposure score per role.
SAP Segregation of Duties Conflict Matrix Worksheet
Record SoD conflicts between SAP functions, score them by likelihood and impact, and log the mitigating control and owner for each.
SAP System Landscape Inventory Worksheet
An editable inventory of your SAP systems and clients: SID, tier, release, database, owner and patch dates. Exports to Excel.
SAP SoD Mitigating Control Register Worksheet
An editable register of accepted SoD conflicts and the compensating controls behind them, with risk score and review dates. Exports to Excel.
SAP Profile Parameter Change Log Worksheet
An editable log of SAP profile parameter changes with old and new values, reason, approver and restart requirement.
IDoc to EDI X12 Mapping Worksheet (INVOIC to 810)
An editable mapping sheet that pairs IDoc segments and fields with X12 segments and elements, with rules and open questions, exported as an Excel spec.
SAP Interface Inventory Register Worksheet
An editable register of every interface touching SAP, with technology, owner, frequency and business criticality, ready to export to Excel.
SAP Interface Volume and Storage Sizing Worksheet
An editable worksheet that turns messages per day, average size and retention into daily megabytes, peak hourly load and total storage.
SAP Integration Test Case Matrix Worksheet
An editable test matrix for SAP interface testing, with scenario, expected result, pass flag and defect count rolled up to a pass rate.
S/4HANA Simplification Item Worksheet
An editable worksheet for logging simplification items from the Readiness Check, with decision, owner effort and cost totals.
SAP Data Migration Object Worksheet
An editable register of S/4HANA migration objects with record counts, cleansing progress, load method and mock load effort.
SAP Fit-to-Standard Workshop Log
Record each business process reviewed in fit-to-standard workshops, its fit rating, gap resolution and estimated effort. Exports to Excel.
SAP Migration RAID Log Worksheet
Log risks, assumptions, issues and dependencies for an SAP migration with automatic risk scores. Exports to Excel.
SAP Cutover Runbook Timing Worksheet
Build the hour-by-hour cutover runbook with task owners, durations and buffers, and total the business downtime. Exports to Excel.
SAP S/4HANA Test Scenario Tracker
Track integration and user acceptance test scenarios with pass rates and open defects per process area. Exports to Excel.
SAP Business Partner CVI Conversion Worksheet
Plan customer and vendor master conversion to Business Partner with record counts, error rates and cleanup effort per company code or account group.
SAP B1 Item Master Import Template (DTW)
An editable item master worksheet with the fields most B1 implementations load through DTW, ready to export to Excel or CSV.
SAP B1 User Permission Matrix Worksheet
An editable role-by-module matrix to plan SAP Business One authorizations, with a score for roles that mix duties.
SAP Business One BOM Cost Rollup Worksheet
An editable component cost worksheet with scrap allowance that rolls up material cost per finished unit, for checking a Business One BOM before loading it.
SAP Business One Data Migration Mapping Worksheet
An editable tracker that maps legacy data to Business One objects with record counts, cleansing progress and owners.
SAP Business One Cycle Count Variance Worksheet
An editable worksheet that compares system and counted stock, values the variance and shows the percentage before you post the inventory adjustment.
SAP Business One User-Defined Fields and Tables Register
An editable register of every user-defined field and table in a Business One company, with owner, purpose and change status.
SAP B1 Warehouse Bin Location Capacity Planner
An editable worksheet to list bin codes, dimensions and fill factor, compute usable volume and plan bins before you load them into a B1 warehouse.
SAP Business One User-Defined Field Planning Worksheet
An editable worksheet to specify every user-defined field before it is created: table, name, type, size, valid values and reason.
SAP Characteristic and Class Design Worksheet
Plan every characteristic, its data type, value list and owning class before you touch CT04. Exports to Excel for review with engineering and sales.
SAP Configurable Material Test Matrix Worksheet
Track each test configuration with expected and actual BOM item counts and price, so every dependency change is proven before release.
SAP Variant Condition Pricing Worksheet
Plan variant condition surcharges per characteristic value before you load them into SAP pricing, and total the configured price for test cases.
SAP Variant Table Maintenance Worksheet
Lay out valid characteristic combinations for a variant table, with lead time and price class per row, before you maintain the table in SAP.
SAP MM Fit-Gap Analysis Template with Examples
An editable SAP MM fit-gap worksheet with realistic example rows, resolution options and effort totals.
SAP PP Test Scenarios and Test Script Worksheet
Editable SAP PP test script sheet covering master data, MRP, production order, confirmation, goods movements and settlement, ready to export to Excel.
SAP MM BPML Business Process Master List Template
An editable MM business process master list with process IDs, transaction codes, owners and in or out of scope status, exportable to Excel.
Calculators and simulators
SAP Reorder Point and Safety Stock Field Calculator
Work out the reorder point and safety stock values to enter in the SAP MRP 1 view for reorder point planning materials.
SAP MRP Lot Sizing Cost Comparison Calculator
Compares annual ordering plus holding cost for lot-for-lot, a fixed lot size and the economic order quantity, so you can pick a sensible SAP lot sizing procedure.
SAP MRP Reorder Point and Safety Stock Calculator
Works out the reorder point and safety stock to maintain for reorder point planning in SAP, using planned delivery time, GR processing time and a target service level.
SAP Moving Average Price (MAP) Calculator
Shows how a goods receipt changes the moving average price for materials with price control V, including delivery costs, and charts the effect of receipt price.
SAP Invoice Verification Tolerance Calculator
Simulates the price and quantity variance checks behind MIRO invoice blocks so you can test tolerance limits before changing OMR6.
SAP MRP Rounding Value and Lot Size Order Quantity Calculator
Predicts the quantity MRP will propose after assembly scrap, minimum lot size, rounding value and maximum lot size, and shows the excess it creates.
SAP Consignment vs Owned Stock Cost Calculator
Weighs the carrying cost you avoid with supplier-owned consignment stock against the price premium suppliers usually ask for, and finds the break-even premium.
SAP Three-Way Match and Invoice Tolerance Calculator
Enter PO price, received quantity, invoice quantity and price, and tolerance to see price and quantity variances and whether the invoice would block.
SAP Work Center Capacity Planning Calculator
Calculate available capacity, capacity requirements and load percent for a work center from shifts, utilization, setup and run times.
SAP Total Replenishment Lead Time Calculator
Compute total replenishment lead time for purchased or made materials and the reorder level that goes with it.
SAP PP Safety Stock and Reorder Point Calculator
Work out a statistically sound safety stock and reorder point for the MRP 1 view of the material master, and see how lead time moves them.
SAP PP Economic Production Quantity Lot Size Calculator
Find the cost-minimizing lot size for an in-house part using setup cost, holding cost and production rate, and see how setup cost moves it.
SAP PP Work Center Available Capacity and Load Calculator
Compute available capacity per week from operating time, utilization rate and number of individual capacities, then see load percent and overload.
SAP PP Operation Lead Time Scheduling Calculator
See how queue, setup, processing, teardown, wait and move times add up to operation lead time for any lot size.
SAP PP Kanban Quantity and Container Calculator
Size an SAP kanban control cycle: how many kanbans of what quantity cover demand during replenishment, plus the maximum inventory they imply.
SAP PP Production Order Variance Calculator
Break the difference between target and actual production order cost into price, usage, rate and efficiency variances.
SAP SD Rebate Accrual Calculator
Estimate how much rebate to accrue to date and for the full year with a retroactive threshold, then compare with what has already been settled.
SAP SD Pricing Condition Price Calculator
Walk a sales order line through a typical SD pricing procedure and see net value, invoice total and margin. Sweep the customer discount to see margin erosion.
SAP SD Volume Rebate Accrual Calculator
Model a tiered volume rebate agreement: year-to-date accrual, forecast payout and the effect of retroactive versus incremental scales.
SAP SD Credit Exposure Simulator
Add up the components of credit exposure and test whether a new sales order would exceed the credit limit.
SAP SD ATP Availability Check Calculator
Model the available-to-promise logic: what quantity can be confirmed now and what is backordered, with a sweep of the requested quantity.
SAP SD Delivery Scheduling Date Calculator
Work backward from the requested delivery date through transit, loading and pick/pack times, and see if material can be ready in time.
SAP SD Milestone Billing Plan Calculator
Split a contract value across milestones, clear an advance proportionally and see the net invoice and retention for each step.
SAP Standard Cost Variance Calculator
Split a production variance into material price, material usage, labor rate and labor efficiency using the standard formulas.
SAP Activity Type Rate Calculator
Work out the fixed, variable and total activity price from planned cost center cost and activity quantity, then test absorption at actual activity.
SAP Overhead Rate and Absorption Calculator
Compute an overhead surcharge rate from planned overhead and base, then see over or under absorption when the actual base moves.
SAP Asset Depreciation Calculator
Check what an SAP depreciation key should produce for an asset: yearly depreciation, accumulated depreciation and net book value, with a year-by-year chart.
SAP Costing Sheet Overhead Rate Calculator
Compute a planned overhead rate, build a costing sheet from material and labor, and see how much overhead is under or over absorbed against actual cost.
SAP Production Order WIP Calculator
Estimate work in process on a production order from actual costs and goods receipts at standard, and compare with WIP at target cost.
SAP Purchase Price Variance and Moving Average Price Calculator
See the price difference posted at goods receipt for a standard price material and the new moving average price for a MAP material.
SAP Foreign Currency Valuation Calculator
Estimate the unrealized exchange rate gain or loss when SAP revalues open foreign currency items at the period-end rate.
SAP Payment Terms Cash Discount Calculator
Compare the early payment discount in your SAP payment terms with your cost of funds, and see the annualized return of paying early.
SAP Cost Center Assessment Allocation Calculator
Split a shared cost pool across receiver cost centers by headcount, area or any statistical key figure, and see the rate per unit.
SAP Material Ledger Periodic Unit Price Calculator
Compute the periodic unit price, ending inventory value and consumption value for a material in an actual costing period, and compare it with standard.
SAP Fiscal Year and Posting Period Calculator
Convert a calendar date to the SAP posting period and fiscal year for a non-calendar fiscal year, with a year shift option.
SAP QM Dynamic Modification Rule Calculator
Model how much inspection effort a skip or reduced stage saves, based on the share of lots that run at the reduced stage.
SAP QM Inspection Workload and FTE Calculator
Turn inspection lot volume, characteristics per lot and skip-lot rate into monthly inspection hours, staff needed and cost.
SAP QM Zero Acceptance Sample Size Calculator
Find how many units to inspect when the rule is accept on zero defects, for a given lot size, LTPD and consumer risk.
SAP QM OC Curve and Acceptance Probability Calculator
See how a sampling plan behaves: acceptance probability and average outgoing quality across incoming defect rates.
SAP Maintenance Plan Scheduling Calculator
Work out call horizon lead days, shifted next dates and calls per scheduling period for a time-based SAP PM maintenance plan.
SAP PM Preventive Maintenance Compliance Calculator
Turn counts from your SAP PM order list into PM compliance, overdue rate, planned work share and labor variance.
SAP PM Maintenance KPI Calculator (MTBF, MTTR, Backlog)
Enter a period's breakdown hours, failures, backlog and crew data to get MTBF, MTTR, availability, planned-work share and weeks of backlog.
SAP PM Maintenance Backlog Weeks Calculator
Turn the open work hours from your SAP PM order list into backlog in weeks, net burn rate and weeks to clear. Includes a crew-size sweep.
SAP PM Wrench Time Loss Calculator
Enter minutes lost per shift to permits, parts, travel, meetings and breaks. See wrench time percent and the yearly labor cost of the losses.
SAP PM MTBF, MTTR and Availability Calculator
Feed in operating hours, failure count and breakdown hours from SAP PM notifications. Get MTBF, MTTR, inherent availability and reliability over a mission time.
SAP PM Spare Parts Reorder Point and Safety Stock Calculator
Size reorder point, safety stock, economic order quantity and max stock for a maintenance spare, ready to enter in the SAP material master MRP view.
SAP PM Repair vs Replace Equipment Calculator
Compare yearly maintenance plus downtime cost of an old asset to the equivalent annual cost of a replacement, with a sweep of rising repair cost.
SAP PM Counter-Based Maintenance Plan Interval Calculator
Convert an interval in running hours or cycles to calendar days, with early and late tolerance windows, call horizon lead time and orders per year.
SAP Bin Capacity Calculator
Calculates how many pallets fit in a storage bin by width, depth, height and weight, so you can set bin type capacity values in WM or EWM.
SAP EWM Pick Labor Requirement Calculator
Estimate how many pickers and warehouse orders per shift you need from daily order lines, pick rate, utilisation and absence.
SAP EWM Pick Labor Capacity Calculator
Turn daily order lines and pick times into the number of pickers you need, with a utilization and peak buffer, and see how headcount scales with volume.
SAP EWM Dock Door Requirement Calculator
Find the number of dock doors you need from truck volume, unload time and a peak factor, and test how volume growth changes the answer.
SAP EWM Wave Release Sizing Calculator
Decide how many waves per day to release, how big each should be and how many pickers you need to complete a wave inside its window.
SAP EWM Pallet Position Requirement Calculator
Estimate the storage bins or pallet positions you need to configure from stock levels, pallet quantities and a safe occupancy target.
SAP EWM Replenishment Min Max Calculator
Set the minimum, maximum and replenishment frequency for a fixed pick bin so the picker never finds an empty face.
SAP WM Cycle Count Frequency Calculator
Convert ABC class sizes and count frequencies into daily counts, recount allowance and the number of counters you need.
SAP EWM Inventory Accuracy Calculator
Turn counted locations, discrepancies and value differences into accuracy percentages that you can track and report.
SAP EWM Cross-Docking Savings Calculator
Estimate daily and annual savings from sending a share of inbound pallets straight to outbound instead of through storage.
SAP EWM Picker Headcount and Resource Sizing Calculator
Size the number of pickers and the lines per hour per picker for EWM resource and queue design.
ABAP Development Effort Estimator
Turn counts of simple, medium and complex ABAP objects into build, test and total hours and days with contingency.
ABAP FOR ALL ENTRIES vs SELECT in LOOP Runtime Calculator
Model the database cost of a SELECT inside a LOOP against FOR ALL ENTRIES and see how the gap grows with the driver table size.
ABAP Background Job Runtime and Batch Window Calculator
Estimate batch job duration from record volume, per-record time, commit frequency and parallel processing, and test it against your batch window.
SAP Dialog Work Process Sizing Calculator
Turn active users, dialog steps per hour and work process time into the number of dialog work processes needed at peak.
S/4HANA Custom Code Remediation Effort Calculator
Estimate development, test and cost effort to fix custom ABAP for S/4HANA, and see how much retiring unused code saves.
ABAP Internal Table Memory Size Calculator
Estimate the memory an internal table needs, check it against a session limit and find the safe row count before you hit a short dump.
SAP Number Range Exhaustion Calculator
Forecast how many years remain in a number range interval, including growth and numbers lost to buffering after restarts.
SAP User Access Review Sample Size Calculator
Work out a defensible sample size for testing user access, role assignments or change records, using attribute sampling.
SAP HANA Memory Sizing Calculator
First-pass SAP HANA memory and disk estimate from source database size, compression ratio, growth and work space, with a growth-by-year chart.
SAP Transport Import Window Calculator
Estimate how long a queue of transport requests will take to import and how many fit inside your production change window.
SAP User License Optimization Calculator
Model annual savings from cleaning up inactive SAP users and moving Professional users to a lower license type.
SAP Background Job Capacity Calculator
Estimate batch window utilisation, elapsed time and how many background work processes you need to finish nightly jobs.
SAP Dialog Work Process Estimator
Estimate dialog work processes from named users, concurrency, requests per minute and average dialog processing time.
SAP IDoc Backlog Clearance Time Calculator
Work out how many hours a backlog of unprocessed IDocs will take to drain, based on throughput per job, parallel jobs and new IDocs still arriving.
SAP IDoc Database Growth Calculator
Estimate IDoc table growth from daily volume, segments per IDoc and retention days, and see when archiving pays off.
SAP IDoc Processing Work Process Sizing Calculator
Work out how many work processes inbound IDoc processing needs at peak, and what throughput your current setup can sustain.
SAP IDoc Error Backlog Clearance Calculator
Plan the cleanup of failed IDocs: how many can be reprocessed in bulk after a root-cause fix, how many need hands-on work, and how long it takes.
SAP CPI Monthly Message Volume and Cost Calculator
Forecast monthly Cloud Integration message volume and cost per interface so you can budget before volumes surprise you.
SAP OData Pagination and Extraction Time Calculator
Find a sensible $top page size and thread count by modelling call count, per-call time and total extraction time.
SAP RFC Connection Pool Sizing Calculator
Calculate the concurrent RFC connections an external application needs and compare them with gateway and destination limits.
SAP Interface Retry and Backoff Window Calculator
See how long an interface keeps retrying before it gives up, using initial delay, multiplier, retry count and jitter.
SAP RISE vs On-Premise TCO Calculator
Model the multi-year total cost of RISE with SAP against an on-premise or self-hosted S/4HANA, using your own cost inputs.
SAP Custom Code Remediation Estimator
Estimate hours, cost and calendar time for fixing custom ABAP code for S/4HANA, from object counts, usage and ATC findings.
SAP S/4HANA Migration Business Case Payback Calculator
Estimate payback period, five-year NPV and ROI for an S/4HANA migration from one-time cost, annual savings and run-cost change.
S/4HANA Conversion Downtime Window Calculator
Estimate the business downtime of an ECC to S/4HANA conversion and check whether it fits your cutover weekend.
S/4HANA HANA Memory Sizing Estimator
Rough-size the HANA database memory and persistence you will need from your current database footprint.
S/4HANA User Licence Cost Estimator
Model the effect of cleaning up dormant users and re-mapping user types on your annual SAP licence spend.
SAP B1 Implementation Cost Calculator
Enter users, rates and effort days to see first-year and three-year SAP Business One cost, using your own partner quotes.
SAP Business One License and 5-Year TCO Calculator
Enter professional and limited user counts, prices from your quote, maintenance and services ratio to see total cost of ownership over your horizon.
SAP B1 Reorder Point, Safety Stock and EOQ Calculator
Turn demand, variability and lead time into a safety stock, reorder point and economic order quantity you can key into item master and MRP settings.
SAP B1 Production Order Cost Variance Calculator
Compare actual to standard on a closed production order and see how much of the variance is material, labor rate and labor efficiency.
SAP B1 Landed Cost Allocation Calculator
Spread shipment charges across the goods by value share to see landed cost per unit and the uplift over invoice price before you post a landed cost document.
SAP B1 Inventory Valuation Method Comparison Calculator
Enter two purchase layers and a sale quantity to see cost of goods sold, margin and remaining stock value under moving average and FIFO.
SAP B1 Early Payment Discount Calculator
See the implied annual return of taking a supplier's early payment discount and compare it with your cost of capital before setting payment terms.
SAP Variant Combination and Test Scope Calculator
Estimate the raw and valid number of variants for a configurable product and size a realistic sample for testing.
SAP Variant Combination Explosion Calculator
Multiply characteristic values into a raw combination count, apply a dependency exclusion rate, and estimate the pairwise test floor.
SAP Variant Condition Pricing Calculator
Add variant surcharges to a base price, apply discount and see unit margin, order value and the discount at which margin disappears.
SAP VC Material Master Reduction Calculator
Estimate how many material master records, creation hours and maintenance hours you avoid by moving from a part per variant to a configurable material.
SAP VC Order Entry Time Savings Calculator
Estimate time saved per order, errors avoided and payback months for a variant configuration project.
SAP Variant Configuration Combination Calculator
Enter the number of values for up to six characteristics and the share of valid combinations to see total configurations, test effort and a pairwise test lower bound.
SAP QM Sample Size Calculator by Lot Size and Sampling Procedure
Compare the sample size from an AQL table, a percentage rule and a fixed sample for any lot size, and estimate the inspection time.
SAP ECC AI Assistant Sizing and Value Calculator
Estimate peak concurrent requests, GPUs, tokens per day, index size, hours saved and payback for a private AI assistant on SAP ECC 6.0.
SAP S/4HANA On-Prem AI Assistant Sizing and Value Calculator
Estimate peak concurrent requests, GPUs, tokens per day, index size, hours saved and payback for a private AI assistant on SAP S/4HANA.
SAP Business One AI Assistant Sizing and Value Calculator
Estimate peak concurrent requests, GPUs, tokens per day, index size, hours saved and payback for a private AI assistant on SAP Business One.
SAP BW and BW/4HANA AI Assistant Sizing and Value Calculator
Estimate peak concurrent requests, GPUs, tokens per day, index size, hours saved and payback for a private AI assistant on SAP BW/4HANA.
SAP PI/PO AI Assistant Sizing and Value Calculator
Estimate peak concurrent requests, GPUs, tokens per day, index size, hours saved and payback for a private AI assistant on SAP PI/PO.
SAP ECC Extended Maintenance Cost and Runway Calculator (2027 to 2030)
Enter your maintenance base, rate and migration timeline to see the extended maintenance premium, how many extended years your project implies, and whether it runs past 2030.
SAP ECC EHP8 Upgrade SPDD/SPAU Adjustment Effort and Downtime Simulator
Enter SPDD and SPAU object counts, minutes per object, custom objects to retest and SUM downtime, and get adjustment hours per cycle, total effort and development outage.
SAP ECC Classic MRP Run (MD01/MDBT) Runtime Simulator
Enter materials in scope, net change share, processing key, measured milliseconds per material and parallel processes to estimate the MRP job runtime and whether it fits the night window.
SAP ECC Job Log, Spool and TBTCO Growth Housekeeping Calculator
Enter jobs per day, steps, spool share, average sizes and retention days to see how many job and spool rows you keep and how much TemSe storage they use in the database or file system.
SAP ECC Unicode Conversion Downtime Estimator (Before EHP8 / NetWeaver 7.50)
Estimate the technical downtime of a non-Unicode SAP ECC 6.0 system's Unicode conversion from database size, R3load throughput, parallel processes and the largest table.
SAP ABAP Extended Memory and Heap Sizing Calculator
Estimate the extended memory, batch memory and physical RAM an ABAP application server needs from concurrent users, batch work processes and buffer size, and check headroom against installed RAM.
SAP HANA Disk Sizing Calculator (/hana/data, /hana/log, /hana/shared)
Work out the size of the HANA data, log and shared file systems from host RAM, net data size and growth, using the formulas in SAP's storage requirements white paper.
SAP HANA Backup Storage and Retention Calculator
Estimate how much backup storage SAP HANA full, differential or incremental and log backups need for a given retention period, and how fast it grows.
SAP HANA Log Volume Full Time Calculator (Log Backup Outage)
See how long the HANA log volume lasts if log backups fail, and how full it will be after an outage of a given length.
SAP HANA Table Partition Calculator (2 Billion Row Limit)
Project a HANA column table's row count, see how many years remain before the 2^31 rows per partition limit, and get a partition count for your horizon.
SAP HANA Global Allocation Limit Calculator
Calculate the default HANA 2.0 memory allocation limit for your RAM, the MB value to set when reserving memory, tenant limits and statement memory exposure.
SAP Business One HANA Server Memory Sizing Calculator
Estimate the RAM a SAP Business One version for SAP HANA server needs from company database sizes, growth, compression and concurrent users.
SAP PI/PO Message Persistence Database Growth Calculator
Estimate how big the PI/PO message persistence grows from daily messages, payload size, persisted versions and retention for successful and error messages.
Reference tables
SAP Movement Types Reference
Searchable table of the most used SAP MM movement types with their reversal type, stock effect and typical use.
SAP Purchasing Document Types Reference
Searchable list of SAP purchasing document categories, standard document types, item categories and account assignment categories.
SAP MRP Type Reference
Searchable list of SAP MRP types, lot sizing procedures, procurement types and special procurement keys used in the material master MRP views.
SAP MM Transaction Codes Reference
Searchable list of the SAP MM transaction codes consultants and buyers use daily, grouped by purchasing, inventory, invoice verification and MRP.
SAP MM Tables and Key Fields Reference
Searchable list of the core SAP MM tables with their primary key fields and what each stores, including S/4HANA changes.
SAP PO Item Category, Account Assignment and Special Stock Reference
Searchable list of the codes you choose on a PO line: item category, account assignment category and special stock indicator.
SAP Production Order Types, Categories and Statuses Reference
A searchable lookup of SAP order categories, order type controls, system statuses, shop floor transactions and core order tables.
SAP MD04 Exception Messages and MRP Elements Reference
A searchable lookup of MD04 element abbreviations, key exception messages and the MRP transactions you use to act on them.
SAP BOM Usage, Status and Item Category Reference
A searchable lookup of SAP BOM usage keys, BOM statuses, BOM categories, item categories, tables and transactions.
SAP Lot Sizing Procedures and MRP Parameters Reference
A searchable list of SAP lot size keys, MRP types and the material master MRP fields that control planning results.
SAP PP Transaction Codes Reference
A searchable cheat sheet of the SAP PP transaction codes planners and consultants use every day, grouped by area.
SAP PP Database Tables Reference
A lookup of the main SAP PP database tables, what each holds and the key fields to join on.
SAP MRP Types and MD01 Run Parameters Reference
Reference of the MRP types on the material master and the parameters you set when starting the MRP run in MD01.
SAP Procurement Type and Special Procurement Key Reference
Quick reference for procurement type E/F/X, standard special procurement keys and BOM item categories and what MRP does for each.
SAP Sales Document Types Reference
A searchable list of the standard SAP SD sales document types, with the SD document category and the way each one is normally used in a design.
SAP Item Category Determination Reference
A lookup table of standard SAP SD item categories with delivery and billing relevance, plus how item category determination finds them.
SAP Billing Types Reference
A searchable table of standard SAP billing types with the reference document each one is created from and when it is normally used.
SAP SD Transaction Codes Reference
A searchable list of common SAP sales and distribution transaction codes, grouped by process area, for daily use and onboarding.
SAP SD Tables Reference (VBAK, VBAP, LIKP, VBRK and More)
Lookup of the main SAP SD tables with their key fields and what changed in S/4HANA. Search, then export to Excel or PDF.
SAP SD Pricing Condition Types Reference (PR00, K004, MWST)
Look up standard SAP SD condition types and what each is normally used for in a pricing procedure.
SAP SD Configuration Transactions and IMG Reference
Find the SAP SD customizing transaction for a setting, with the table it maintains and the question it answers.
SAP Cost Element Categories Reference
A searchable list of SAP CO cost element categories, S/4HANA account types and the master data objects around them.
SAP Document Types Reference
The standard SAP accounting document types with the account type they allow and where they usually come from.
SAP Posting Keys Reference
The standard SAP posting keys with debit or credit side, account type and meaning, searchable in the browser.
SAP FICO Transaction Codes Reference
A searchable table of the finance and controlling transaction codes consultants and key users look up every day, with the area and what each does.
SAP FICO Database Tables Reference
A lookup of the standard finance and controlling tables used in reports, extracts and SE16N queries, with module and what each stores.
SAP Special G/L Indicators Reference
A quick lookup of special G/L indicators by account type, with what they are used for and how they differ from normal postings.
SAP QM Inspection Types Reference
Look up the standard SAP QM inspection types, what business event triggers each one and what you must set up in the material master and inspection plan.
SAP QM Quality Notification Types Reference
See what the standard SAP quality notification types Q1, Q2 and Q3 are for, and how related PM types differ.
SAP QM Inspection Lot Origins Reference
See which business events create inspection lots in SAP QM and what to check when a lot is missing.
SAP QM Database Tables Reference
Searchable lookup of the core SAP Quality Management tables, what each one stores and its main key fields, for report writers and data migration teams.
SAP QM Transaction Codes Reference
A searchable list of the SAP QM transaction codes consultants and key users use every day, grouped by inspection, results, notifications and master data.
SAP PM Maintenance Order Types, Tables and Transactions Reference
Searchable lookup of SAP plant maintenance order types, order transactions, order tables and system statuses.
SAP PM Notification Types, Tables and Statuses Reference
Look up SAP plant maintenance notification types, transactions, tables, catalog types and system statuses.
SAP PM Database Tables Reference
A searchable lookup of the core SAP PM tables, their key fields and what each is used for in reports and extracts.
SAP PM Transaction Codes Reference
A searchable list of the transaction codes SAP PM users and consultants reach for daily, grouped by process step.
SAP PM Order and Notification Status Reference
A lookup of SAP PM system statuses with what each means, what sets it and what it blocks.
SAP EWM Warehouse Process Types Reference
A searchable lookup of what a warehouse process type controls in SAP EWM, grouped by process category, with the configuration area for each setting.
SAP Putaway Strategy Reference
A searchable list of putaway strategies in SAP WM and EWM with how the bin is found, where it is controlled, typical use and pitfalls.
SAP Stock Removal Strategies Reference
A lookup of stock removal strategies in SAP WM and EWM, covering FIFO, LIFO, shelf life and partial pallet logic, with where each fits and fails.
SAP WM and EWM Warehouse Tables Reference
A searchable list of the classic WM and EWM tables you query most, with a plain description and typical key fields.
SAP WM and EWM Transaction Codes Reference
Look up the transaction code you need for transfer orders, bins, stock reports, physical inventory and the EWM monitor.
SAP WM to EWM Terminology Map
See what each classic WM object is called in EWM and what changes in behaviour, in one searchable table.
SAP System Fields Reference (SY-SUBRC, SY-DATUM and more)
A searchable list of the ABAP system fields in structure SYST with data type, meaning and a typical use in code.
SAP Core Tables and Key Fields Reference
A searchable lookup of the SAP tables ABAP developers use most, with their primary key fields and owning module.
ABAP Built-in Data Types Reference
A quick lookup of the predefined ABAP data types with length, value range and initial value.
ABAP Developer Transaction Codes Reference
A searchable cheat sheet of development, debugging, transport and monitoring transaction codes used by ABAP developers.
SAP Critical Authorization Objects Reference
A searchable table of sensitive SAP authorization objects with their key fields and the risk each one carries, useful for audits and role reviews.
SAP Basis Transaction Codes Cheat Sheet
A searchable reference of the SAP Basis, security and system administration transaction codes you use every week, grouped by area.
SAP User Types and Default Users Reference
Look up what each SAP user type allows and how to secure the standard delivered users and clients during an audit or hardening review.
SAP Security Profile Parameters Reference
A searchable reference of the profile parameters that control SAP logon, passwords, authorization checks, RFC, gateway and audit logging.
SAP IDoc Message Types Reference (ORDERS, DESADV, INVOIC, MATMAS, DEBMAS)
Searchable list of common SAP IDoc message types with the basic IDoc type, business meaning and the X12 or EDIFACT message they usually map to.
SAP IDoc Status Codes Reference
Look up any IDoc status code, see whether it is inbound or outbound, whether it is an error, and which transaction to use to fix it.
SAP IDoc Control Record (EDIDC) Fields Reference
Look up every commonly used field of the IDoc control record (table EDIDC and structure EDI_DC40) with its meaning and data type.
SAP IDoc and ALE Transactions, Tables and Programs Reference
One searchable list of the transactions, tables and standard programs an SAP integration developer uses to build, monitor and repair IDoc and ALE interfaces.
SAP OData V2 and V4 Query Options Reference
A lookup table of OData system query options, filter operators and functions, showing which work in V2, which in V4, and an example for each.
SAP S/4HANA Key Simplifications Reference
A searchable reference of the biggest ECC to S/4HANA data model and functional changes, with the action each one usually forces.
SAP ECC Obsolete Transactions and S/4HANA Replacements
A lookup table of common ECC transaction codes and the transaction or app that replaces them in S/4HANA, for training and role design.
SAP S/4HANA Conversion and Migration Tools Reference
A lookup of the SAP tools used at each phase of an S/4HANA conversion or migration, what each does and when to use it.
SAP Business One Database Tables Reference
Searchable lookup of the core SAP Business One tables, with the matching row table and what each one stores.
SAP Business One Document Object Type Codes
Lookup of ObjType numbers used in B1 queries, UDO links and approval templates, with header and row tables.
SAP Material Type Reference (FERT, HALB, ROH, HAWA)
Look up the standard SAP material types, what each means and where it is typically used, with a note on how each fits manufacturing.
SAP Variant Configuration Tables Reference
A searchable lookup of the database tables behind SAP characteristics, classes, object dependencies, variant tables and BOMs, with key fields and what each one holds.
SAP Variant Configuration Transaction Codes
A searchable list of the SAP transaction codes variant configuration and PLM consultants use daily, grouped by characteristic, class, dependency, BOM, routing and change work.
SAP BOM Category, Usage and Item Category Codes
A searchable lookup of the coded values consultants meet in BOM and classification work: BOM category, usage, item category, class type and dependency status.
SAP Controlling (CO) Database Tables Reference
A searchable reference of the SAP tables behind cost centers, internal orders, product costing and material valuation.
SAP HR Personnel and Time Management Infotypes Reference
A searchable table of the SAP HCM infotypes plant HR and time administrators meet most often, grouped by PA, PT and payroll area.
SAP Batch Management GMP T-Codes and Tables Reference
A lookup of SAP transactions, tables and movement types for batch genealogy, inspection and release.
SAP SD Document Category (VBTYP) Reference
Lookup table of SAP sales and distribution document categories stored in the VBTYP field, with typical examples and where they appear.
SAP S/4HANA Replaced FI and CO Tables Reference
Maps classic ECC finance and controlling tables to what replaced them in S/4HANA, with a clear explanation of cost elements as G/L accounts.
SAP MM Table Relationships and Join Keys Reference
A searchable relationship map of SAP MM tables listing the join keys between purchasing, goods movement, invoice, material master and cost center tables.
SAP QM Tables Map: Notification, Inspection Plan and Results
Find the SAP QM table for a quality notification, inspection plan, sample or result, with key fields and the table it joins to.
SAP PP Tables Map: Orders, Routings, Resources and PIR
A table list for SAP PP grouped by production order, routing, work center, PIR and BOM, with the key fields to join on.
SAP MM and QM BAPI and API List Reference
A searchable list of the common SAP MM and QM BAPIs and S/4HANA OData APIs, what each does, and whether it needs a commit.
SAP Tables for Plant, Country, Project and Business Partner
Look up the SAP table behind a plant, country, project or partner, with key fields and the join you need next.
SAP MM Standard Reports and Report T-Codes
Search SAP MM standard report t-codes for POs, RFQs, stock, GR/IR and audit, with the use case for each.
SAP MM Output Form Templates List
A searchable starter list of SAP MM output documents and the output type, application and form technology behind each one.
SAP ECC SD User Exit Forms Reference (MV45AFZZ, RV60AFZZ, MV50AFZ1)
Lookup table of the classic SD user exit FORM routines for sales orders, deliveries and billing on SAP ECC 6.0: include, transaction, when it fires, structures available and the usual gotcha.
SAP ECC Customer Exits (SMOD Enhancements) by Module Reference
Lookup table of widely used SMOD enhancements on SAP ECC 6.0 by module, with transactions, components and typical use, plus how to find the exit for any transaction.
SAP ECC Classic BAdI Definitions Reference (MIGO, ME21N, MIRO, Deliveries, PM Orders)
Reference table of widely used BAdI definitions on SAP ECC 6.0 with interface, key methods, transactions and typical use, plus how to find a BAdI and where error messages are allowed.
SAP ECC Background Job Tables Reference (TBTCO, TBTCP, Job Status Codes)
Reference of the tables behind SM37 on SAP ECC 6.0: job header, steps, schedules, events, spool and variants, with joins, plus the TBTCO-STATUS values.
SAP ECC Output Determination Tables and Codes Reference (NAST, TNAPR, NACE)
Reference of NAST-based output control on SAP ECC 6.0: tables, application codes, transmission media, processing status values and standard output types with driver programs.
SAP ECC Movement Type Configuration Tables Reference (T156, T156T, T157D)
Reference of the SAP ECC 6.0 tables, transactions and authorization objects that define movement types, their texts, reason codes and account determination links.
SAP ECC Stock Type and Location Transfer Movement Type Matrix
From/to matrix of SAP ECC 6.0 movement types for stock type changes, storage location and plant transfers, returns, issues, scrapping and initial entry, with reversals and accounting impact.
SAP ECC Movement Type to OBYC Transaction Key and GBB Account Modifier Reference
Look up which OBYC transaction key and GBB account modifier a SAP ECC movement type uses, so you know which G/L account a goods movement will hit.
SAP ECC 6.0 Enhancement Packages and Maintenance Dates Reference (EHP1 to EHP8, 2027, 2030, 2033)
Every SAP ERP 6.0 enhancement package with its NetWeaver basis, SAP_APPL release and the maintenance dates that apply: 2025, 2027, 2030 and the 2033 transition option.
SAP ECC ORDERS05 IDoc Segments and Qualifiers Reference
The ORDERS05 segments and qualifier values used for inbound sales orders and outbound purchase orders, with the SD and MM fields they map to.
SAP ECC MATMAS05 Material Master IDoc Segments Reference
The MATMAS05 segment tree with the material master table each segment carries, so you can build, reduce or debug material master distribution.
SAP ECC MRP Tables and MRP Element (DELKZ) Codes Reference
The SAP ECC tables behind MRP (planning file, MRP areas, controllers, groups, planned orders) and the DELKZ codes for each MRP element with its source table.
SAP ECC Shipment and Shipment Cost Tables Reference (VTTK, VTTP, VFKK, VFKP)
Tables and transactions for SAP LE-TRA shipments and shipment costs, with key fields and the join path from delivery to shipment cost document.
SAP ECC MM and SD Tables Replaced in S/4HANA Reference
Look up which ECC 6.0 logistics tables (MM inventory, SD, credit, rebates, PP planning file) were replaced or turned into compatibility views in S/4HANA, and what that means for custom code.
SAP ECC QM Sample Management Tables Reference (QPRVK, QPRVP, QPRS)
Tables, key fields, links and transactions behind SAP QM sample management: sample-drawing procedures, physical samples, sample drawings and how they connect to inspection lots and sampling procedures.
SAP Transport Return Codes Reference (tp RC 0, 4, 8, 12, 16)
Searchable table of SAP transport return codes and the most common RC 8 and RC 12 causes, with the import step, the log to open and the first fix.
SAP Transport Request Tables Reference (E070, E071, E07T)
Key fields of the SAP transport tables E070, E07T, E071, E071K, E070C and TADIR, with the TRFUNCTION and TRSTATUS values and the joins to report on transports.
How to Transport Variants, SO10 Texts, Table Entries and Layouts in SAP
One row per SAP object you must add to a request by hand: how to add it, the E071 entry it creates, the request type and the gotcha.
SAP Work Process Types and SM50 Status Reference
Reference for SAP work process types and their profile parameters, SM50 and SM66 status values, and the reason codes behind On Hold processes, with the action to take.
SAP GUI Connection Error Codes Reference (88, 10054, 10061)
Reference for SAP GUI connection errors by layer: Windows socket codes, SAP NI layer codes, message server and logon group errors and SNC errors, with checks and fixes.
SAP NetWeaver Release to SAP_BASIS and Kernel Reference
Which SAP_BASIS release belongs to each NetWeaver and ABAP Platform release, which products run on it, which kernel lines apply and how to check your own system.
SAP HANA Monitoring Views Reference (M_ System Views)
One row per SAP HANA monitoring view with the key columns to select and the question it answers: memory, table size, disk, backups, locks, sessions and SQL.
SAP HANA SQL Error Codes Reference
Searchable table of common SAP HANA 2.0 SQL error codes with the error text, typical cause, the view or trace to check first and the fix.
SAP Gateway OData Transaction Codes Reference (SEGW, /IWFND/)
Every Gateway transaction you need to build, activate, test and debug OData services, with where it runs (hub or backend) and the mistake people make with it.
SAP BW and BW/4HANA Metadata Tables Reference (RSTRAN, RSBKDTP, RSPCCHAIN)
Which table holds transformations, DTPs, process chain runs, ADSOs, InfoObjects and query elements, the key fields, and whether it still applies in BW/4HANA.
SAP SUM 2.0 Roadmap Phases Reference (Upgrade, Conversion, DMO)
The SUM 2.0 roadmap steps and key phases for upgrades, S/4HANA conversions and DMO, with uptime or downtime, what happens, typical issues and where the logs are.
SAP B1 Item, Warehouse and Batch Columns Reference (OITM, OITW, OITL, OBTN)
Column-level reference for B1 item, stock, price list and batch/serial tables, with the meaning of each column, example values and SQL Server vs HANA notes.
SAP Business One Query Parameters Syntax Reference ([%0], OUQR)
The patterns for user prompts in B1 saved queries, for SQL Server and HANA, plus the tables that store queries and categories.
Code and query generators
SAP Source List Upload Template
Generate a tab separated source list upload file with the EORD fields for material, plant, vendor, validity and MRP usage.
SAP Open Purchase Order Items ABAP SELECT Generator
Builds an ABAP report that selects open PO schedule lines with open quantity from EKKO, EKPO and EKET, filtered by purchasing organisation, plant, document type and date.
SAP Open PO Items ABAP SELECT Generator
Fill in plant, document type and dates to generate ABAP Open SQL that lists open PO items with received quantity from EKBE.
SAP BAPI_PO_CREATE1 ABAP Skeleton Generator
Fill in vendor, plant and material to generate an ABAP skeleton for creating a purchase order with BAPI_PO_CREATE1.
SAP Open Production Orders ABAP SELECT Generator
Fill in plant, order type and dates and get a ready ABAP Open SQL query for open production orders.
SAP BAPI Production Order Create and Release ABAP Template
Fill in material, plant, order type and dates and get an ABAP skeleton that creates and releases a production order with a commit.
SAP SD Sales Order Item ABAP SELECT Generator
Fill in the sales organization, order type and dates, and get a ready-to-adapt ABAP report that lists sales order items.
SAP PM Open Maintenance Orders ABAP SELECT Generator
Fill in plant, order type and planner group and get a ready ABAP SELECT that excludes TECO and CLSD orders.
SAP PM Equipment and Functional Location SQL Generator
Generates a SQL query that lists equipment installed under a functional location, joining the master, time segment, location and text tables.
SAP PM Order Create BAPI ABAP Skeleton (BAPI_ALM_ORDER_MAINTAIN)
Fill in order type, plant and equipment and get a working-shape ABAP skeleton that creates a maintenance order through BAPI_ALM_ORDER_MAINTAIN.
SAP WM Open Transfer Order ABAP SELECT Generator
Fill in the warehouse number, storage types and age and get a ready ABAP report for unconfirmed transfer orders.
SAP WM Bin Stock LQUA ABAP Report Generator
Build an ABAP query on LQUA that lists stock by bin, flags old stock and counts quants per bin.
ABAP SELECT Statement Generator
Fill in table, fields and a WHERE condition and get modern ABAP Open SQL: SELECT INTO TABLE, SELECT SINGLE and a safe FOR ALL ENTRIES pattern.
ABAP Internal Table Declaration Generator
Choose table kind, key and line type and get the DATA declaration, a local TYPES version and the common table operations.
BAPI_PO_CREATE1 Call Skeleton Generator
Enter vendor, plant, material and quantity and get a complete BAPI_PO_CREATE1 call with the matching X structures, error handling and BAPI_TRANSACTION_COMMIT.
ABAP ALV Report Skeleton Generator
Enter a program name, table and selection field and get a working ABAP report that shows an ALV grid using CL_SALV_TABLE.
ABAP CDS View Skeleton Generator
Fill in table, fields, aliases and one association to get CDS view DDL in both the classic DDIC-based and the view entity syntax.
SAP Inactive Users ABAP Report Generator
Fill in the inactivity threshold and user type to get a ready to paste ABAP report that lists dormant users from USR02.
SAP SQL Query Generator: Users With an Authorization Object
Enter an authorization object, field and value to generate SQL that lists users with that access through single and composite roles.
SAP OData Service URL Builder
Generate a correct SAP Gateway OData V2 request URL with query options, test it in a browser or REST client, then reuse it in your code.
SAP API Business Hub Request Generator
Build a ready-to-run cURL or HTTP request for an SAP API Business Hub sandbox or your own S/4HANA Cloud tenant, with the right headers and query options.
SAP ABAP Outbound IDoc Code Generator (MASTER_IDOC_DISTRIBUTE)
Fill in message type, IDoc type, receiver and a segment, and get an ABAP skeleton that creates and dispatches an outbound IDoc.
SAP ABAP IDoc Status Query Generator (EDIDC and EDIDS)
Build an ABAP SELECT that lists failed or waiting IDocs from EDIDC and joins in the latest status message from EDIDS.
SAP BAPI_GOODSMVT_CREATE ABAP Code Generator
Fill in plant, material, quantity and movement type to get a working ABAP skeleton for posting a goods movement through the standard BAPI.
SAP CVI Business Partner Gap Report ABAP Generator
Generates an ABAP report that finds customers and vendors without a Business Partner link, the first check before a CVI conversion.
SAP Custom Code Inventory ABAP Query Generator (TADIR)
Generates ABAP SELECT statements against TADIR that count and list custom objects by type and package for S/4HANA remediation planning.
SAP HANA Largest Tables SQL Query Generator
Generates SAP HANA SQL for the biggest tables and the usual archiving suspects, to size and reduce data before migration.
SAP Business One Production Component Shortage SQL Generator
Pick a status, due date and warehouse and get a query that shows components short against on-hand stock for open production orders.
SAP Object Dependency Syntax Template
Generate starter syntax for the four classic SAP dependency types from your own characteristic names and values.
SAP Classification Values ABAP Generator
Enter a material and a class type and get an ABAP snippet that resolves the internal object number and lists every assigned characteristic and value.
SAP BOM Where-Used SQL Generator
Fill in a component, plant and BOM usage to get SQL that lists every parent BOM using it, plus a query for BOM items with dependencies.
SAP ABAP Stock Below Safety Stock Report Generator
Produces a small ABAP report that joins MARC and MARD to list materials with unrestricted stock under the safety stock for a plant and MRP controller.
SAP Open Outbound Deliveries ABAP Generator
Build an ABAP query that lists deliveries not yet goods issued, by plant, shipping point and planned goods issue date range.
SAP Change Number BOM ABAP Select Generator
Generates an ABAP report snippet that lists BOM items changed under a given SAP change number, joining material-to-BOM, BOM item and change master data.
SAP MBEW Price Control ABAP SELECT Generator
Fill in plant, material range and a drift threshold to get an ABAP report listing standard and moving average prices from MBEW.
SAP MBEW Material Valuation ABAP SELECT Generator
Generates an ABAP SELECT on MBEW joined to MAKT that lists price control, standard price, moving average price, quantity and stock value by plant.
SAP Process Order ABAP SELECT Snippet Generator (AUFK, AFKO, AFPO)
Fill in plant, order type and date, and get an ABAP SELECT that returns SAP process orders with header dates, quantities and materials.
SAP Batch Shelf Life Expiry Stock SQL Query Generator (MCH1, MCHB)
Build a SQL query that lists batches whose shelf life expiry date falls in a chosen window, with stock by status, for chemical and specialty products.
SAP Installed Base Equipment ABAP SELECT Generator
Fill in manufacturer, model and build year to produce an ABAP report listing equipment records from the EQUI table.
SAP Packaging Materials (VERP) ABAP SELECT Generator
Create an ABAP Open SQL SELECT that lists packaging materials with description, group and plant data.
SAP VAT Tax Code ABAP SELECT Generator
Fill in company code, tax procedure, tax code and posting dates to generate ABAP that lists tax code texts and VAT base and tax amounts from BSET and BKPF.
SAP Outline Agreement Expiry ABAP SELECT Generator
Generate an ABAP report that lists purchasing contracts and scheduling agreements expiring in a window, from EKKO and EKPO.
SAP Manufacturing Order Table Join SQL Generator
Generates SQL that joins the SAP production order header, item and component tables with the correct keys, plus a field guide to each table.
SAP S/4HANA Production Order Tables and Join SQL Generator
Get the production order tables for S/4HANA and generate the join SQL for order headers, operations and components.
SAP Kernel Upgrade Command Generator (Linux, SAPCAR)
Fill in SID, instance numbers, paths and archive names and get the ordered shell commands for a kernel patch on an ABAP system or SAP Web Dispatcher on Linux.
SAP HANA Memory Usage SQL Generator (Used, Resident, Heap)
Builds five monitoring queries for a HANA tenant: used memory against the allocation limit per service, host resident memory, top heap allocators, top column tables and daily used-memory history.
SAP HANA Table Load, Unload and Preload SQL Generator
Builds the statements to check whether a column table is loaded, load or unload it, set preload, change its unload priority, move it to Native Storage Extension and review unload history.
SAP HANA Backup SQL Statement Generator (Data, Delta, Catalog)
Builds BACKUP DATA statements for a tenant (complete, differential, incremental, to file or Backint), queries to review the backup catalog and its size, and the catalog housekeeping statement.
Checklists
SAP MIGO Goods Receipt Checklist
Step by step checklist to post a clean goods receipt against a purchase order in MIGO, with critical checks flagged.
SAP Physical Inventory Count Checklist
Step-by-step checklist for planning, counting, recounting and posting physical inventory differences in SAP MM.
S/4HANA MM Simplification Readiness Checklist
Checklist of the S/4HANA changes that affect purchasing and inventory, to review before a conversion or new implementation.
SAP Planned Order to Production Order Conversion Checklist
A step by step checklist to verify materials, BOM, routing, capacity and release before converting planned orders to production orders in SAP.
SAP PP Go-Live Master Data and Cutover Checklist
A tick-box readiness check for production planning go-live, covering master data, configuration, cutover and support.
SAP Credit Management Checklist
A checklist for setting up and reviewing SAP credit management in SD, from credit control area to blocked-order release.
SAP Output Determination Checklist
A checklist to design, configure and troubleshoot SAP output determination for order confirmations, delivery notes and invoices.
SAP Incompletion Log Checklist
A checklist to design and test SAP incompletion control so orders cannot move on with missing required data.
SAP SD Go-Live and Cutover Readiness Checklist
A readiness checklist for sales and distribution cutover: data, configuration, interfaces, testing and hypercare.
SAP Period End Closing Checklist
A month-end close checklist in a sensible order, with the SAP transactions to run for each step.
SAP F110 Payment Run Checklist
Step-by-step checklist for running vendor payments with F110, from open item checks to bank file and reconciliation.
SAP QM in Procurement Setup Checklist
Check each step needed to run goods receipt inspection for purchased materials, from QM control key to vendor release.
SAP QM Implementation Readiness Checklist
Check master data, integration points, inspection setup and user readiness before cutting over SAP QM.
SAP QM Go-Live and Cutover Checklist
A checklist of what to confirm before switching on SAP Quality Management: master data, integration, authorizations, migration and hypercare.
SAP PM Maintenance Order Settlement Checklist
A step-by-step checklist for technically completing and settling SAP maintenance orders without period-end surprises.
SAP PM Shutdown and Turnaround Readiness Checklist
Check scope freeze, order and network readiness, material availability, permits and contractor setup in SAP PM before a shutdown begins.
SAP PM Go-Live Readiness Checklist
A checklist to test whether your SAP PM implementation or rollout is ready to go live, grouped by master data, configuration, planning, access and cutover.
SAP Physical Inventory Procedures Checklist
A step-by-step checklist for planning, counting and posting physical inventory in SAP WM, EWM and Inventory Management.
SAP EWM Wave Management Checklist
A checklist to design, run and review wave management in SAP EWM, from wave templates to release and closing.
SAP WM to EWM Migration Readiness Checklist
A practical checklist covering design, master data, integration, mobile devices and cutover for a WM to EWM move.
ABAP Code Review Checklist
A practical review checklist for ABAP changes: database access, security, error handling, structure and S/4HANA compatibility.
SAP Transport Import and Go-Live Checklist
A checklist for importing transports into production, covering approvals, sequence, testing, timing and rollback.
ABAP Transport Request Release Checklist
A pre-release checklist for ABAP transport requests that catches missing objects, untested code and import order problems.
ABAP Performance Tuning Checklist
A checklist of database, internal table and memory checks to run on slow ABAP reports before they reach production.
SAP Transport Request Checklist
A step-by-step checklist for creating, releasing and importing SAP transport requests through STMS, with the critical controls flagged.
SAP System Copy Checklist
A phased checklist for SAP system copies and refreshes, with pre-copy backups, post-copy BDLS, RFC and job clean-up, and data privacy steps.
SAP Kernel Upgrade Checklist
A checklist for planning, staging, replacing and verifying an SAP kernel update, with backup and rollback steps called out.
SAP Go-Live Security Readiness Checklist
A checklist of security and Basis items to confirm before an SAP system or release goes live, with critical items flagged.
SAP Daily Basis Health Check Checklist
A daily checklist of the transactions and checks a Basis admin runs each morning to confirm an SAP system is healthy.
SAP RFC Destination Setup Checklist (SM59)
Work through every step of creating and securing an RFC destination in SM59, from connection type to authorization and testing.
SAP Batch Input Session Checklist (SM35)
Step-by-step checklist for recording, building, running and verifying a batch input session in SM35, with notes on errors and background processing.
SAP IDoc Interface Go-Live Checklist
A practical checklist covering configuration, testing, monitoring and cutover steps before an IDoc interface goes into production.
SAP S/4HANA Migration Cutover Checklist
A practical cutover checklist for S/4HANA go-live weekend, grouped from planning and freeze through validation and handover.
SAP S/4HANA Pre-Conversion Technical Checklist
A checklist of the technical preparation items to close before running SUM on a system conversion from ECC to S/4HANA.
SAP Business One Production Order Checklist
A step-by-step checklist for creating, releasing, issuing to, receiving from and closing a production order in SAP Business One.
SAP B1 Period End Close Checklist
A grouped month-end checklist for SAP Business One covering sub-ledgers, inventory, production, revaluation and locking the posting period.
SAP Business One Go-Live Readiness Checklist
A five-group checklist to confirm an SAP Business One implementation is ready for cutover, with the critical blockers marked.
SAP Business One Go-Live Cutover Checklist
A cutover checklist for taking a Business One company live: freeze, balances, stock counts, users, integrations and hypercare.
SAP VC Model Design Review Checklist
A 36-item checklist covering characteristic design, classes, dependencies, super BOM, routing and runtime performance, with critical items flagged.
SAP New Plant Setup Checklist
Step-by-step checklist for creating a new SAP plant: enterprise structure, assignments, master data, production, quality and go-live checks.
SAP MM Configuration Checklist (SPRO)
A tickable SPRO checklist for configuring SAP MM, grouped by enterprise structure, material master, purchasing, inventory, invoice verification and accounting.
SAP ECC 6.0 EHP8 Upgrade Readiness Checklist
A step-by-step readiness checklist for upgrading SAP ECC 6.0 from EHP4 to EHP7 to EHP8 on NetWeaver 7.50 with SUM.
SAP ECC Support Package Stack (SPS) Update Checklist
A checklist for applying a support package stack to SAP ECC 6.0: decide, prepare, apply with SUM or SPAM, adjust modifications and validate.
SAP ECC Background Job Failure Troubleshooting Checklist (SM37, ST22, SM21)
Work through a failed, stuck or never-started SAP ECC background job in order: logs, scheduling errors, runtime failures, debugging and safe cancellation.
SAP ECC SM36 Standard Housekeeping Jobs Checklist
Check that every standard SAP ECC housekeeping job is scheduled with the right program and frequency, plus the common interface and application jobs.
SAP ECC QM Usage Decision Reversal Checklist (QA12, QA03, QAMB)
A controlled checklist for correcting a wrong usage decision on an SAP ECC inspection lot: assess what was posted, correct stock, change the decision and verify.
SAP HANA Revision and SPS Upgrade Checklist (hdblcm)
A step-by-step checklist for updating SAP HANA 2.0 to a new revision or SPS with hdblcm, including system replication, client updates and rollback.
SAP HANA Performance Health Checklist (Memory, CPU, Locks, Merges)
A 36-point SAP HANA 2.0 health check where every item names the monitoring view, parameter or SAP Note to look at.
SAP Gateway OData Service Activation and Transport Checklist
Step by step checks to activate, test and transport an OData service on SAP Gateway, embedded or hub, V2 or V4.
SAP BW 7.5 to BW/4HANA Conversion Checklist
A five stage checklist for converting SAP BW 7.5 to BW/4HANA: assessment, Starter Add-on, object transfer, system conversion and post steps.
SAP S/4HANA On-Premise Release Upgrade Checklist (e.g. 2021 to 2023)
Planning, custom code, technical prep, SUM execution and post steps for upgrading one S/4HANA release to a newer one.
SAP Business One Version and Feature Pack Upgrade Checklist
Plan, back up, upgrade server components, company databases and clients, then test: a step list for SAP Business One 10.0 feature pack upgrades.
SAP Business One SQL Server to HANA Migration Checklist
Pre-assessment, SQL rewrite, migration, validation and cut over checks for moving SAP Business One company databases from SQL Server to SAP HANA.
Assessments
SAP PP Planning Process Maturity Assessment
A ten question self-assessment of how well your SAP PP planning and execution processes work, with recommendations by score band.
SAP Order-to-Cash (SD) Health Assessment
Eight questions that score how well your SAP SD order to cash design and operation hold up, with recommendations by band.
SAP S/4HANA Finance Migration Readiness Assessment
Score your finance readiness for an ECC to S/4HANA move and get priorities for the next steps.
SAP QM Maturity Assessment
Nine questions about plans, catalogs, notifications, integration and analytics give you a maturity score for your SAP QM use and a list of next steps.
SAP PM Process Maturity Assessment
A 10 question self-assessment that scores how well your SAP PM system supports planning, execution, history and reporting.
SAP EWM Go-Live Readiness Assessment
A ten question self-assessment that scores how ready your EWM project is for go-live and lists the next steps.
SAP Basis Security Hardening Assessment
Answer ten questions about your SAP system security basics and get a score with the gaps to close first.
SAP Integration Readiness Assessment
Answer ten questions about interfaces, monitoring, API use, security and ownership to see how ready your SAP integration landscape is for change.
ECC to S/4HANA Readiness Assessment
A ten-question scorecard that tells you how ready your SAP ECC landscape is for an S/4HANA move and where to spend the next quarter.
SAP Greenfield vs Brownfield Assessment
Ten questions that point toward brownfield conversion, selective data transition or greenfield re-implementation for your S/4HANA move.
SAP Clean Core Extensibility Assessment
A short scored assessment of how well your SAP system follows clean core principles, and what to do about the gaps.
SAP B1 MRP Setup Readiness Assessment
A 10-question readiness score for running the SAP Business One MRP wizard, with the data fixes to make first.
SAP Business One Manufacturing Fit Assessment
Answer ten questions about your manufacturing complexity and see whether Business One fits as is, needs add-ons or needs a closer look.
SAP Variant Configuration Readiness Assessment
Nine questions about product structure, rules, data ownership and testing give a readiness score and the priorities to fix before a VC build starts.
SAP ECC 2027 Maintenance Exit Path Assessment
Twelve scored questions on EHP level, database, custom code, CVI, add-ons, budget and contract appetite that map your SAP ECC 6.0 system to one of four maintenance exit paths, with the dates that apply.
SAP PI/PO to Integration Suite Migration Readiness Assessment
Twelve questions that score how ready your PI/PO landscape is to move to SAP Integration Suite, with a plan per band.
SAP Solution Manager 7.2 to Cloud ALM Transition Assessment
Twelve questions on how you use Solution Manager 7.2 that point to Cloud ALM now, a hybrid period, Focused Run, or staying while you plan.