SAP SQL Query Generator: Who Has This Authorization Object?
'Who can run SE16?' and 'who has this authorization value?' are the most common ad hoc questions in an SAP access review. This generator writes the SQL against the role tables so you can answer them from the database or a replicated copy.
Fill in
The database schema that holds the ABAP tables, often SAPHANADB or SAPABAP1
1. Users with the value through a directly assigned role
SELECT u.UNAME, u.AGR_NAME, a.OBJECT, a.FIELD, a.LOW, a.HIGH FROM "SAPHANADB"."AGR_1251" a JOIN "SAPHANADB"."AGR_USERS" u ON u.MANDT = a.MANDT AND u.AGR_NAME = a.AGR_NAME WHERE a.MANDT = '100' AND a.OBJECT = 'S_TCODE' AND a.FIELD = 'TCD' AND a.DELETED = ' ' AND ( a.LOW = 'SE16' OR a.LOW = '*' ) AND u.TO_DAT >= TO_VARCHAR(CURRENT_DATE, 'YYYYMMDD') ORDER BY u.UNAME, u.AGR_NAME;
2. Users with the value through a composite role
SELECT u.UNAME, u.AGR_NAME AS COMPOSITE_ROLE, c.CHILD_AGR AS SINGLE_ROLE, a.LOW, a.HIGH FROM "SAPHANADB"."AGR_1251" a JOIN "SAPHANADB"."AGR_AGRS" c ON c.MANDT = a.MANDT AND c.CHILD_AGR = a.AGR_NAME JOIN "SAPHANADB"."AGR_USERS" u ON u.MANDT = c.MANDT AND u.AGR_NAME = c.AGR_NAME WHERE a.MANDT = '100' AND a.OBJECT = 'S_TCODE' AND a.FIELD = 'TCD' AND a.DELETED = ' ' AND ( a.LOW = 'SE16' OR a.LOW = '*' ) AND u.TO_DAT >= TO_VARCHAR(CURRENT_DATE, 'YYYYMMDD') ORDER BY u.UNAME, u.AGR_NAME;
3. Add lock status from USR02
SELECT x.UNAME, x.AGR_NAME, s.USTYP, s.UFLAG, s.TRDAT
FROM (
SELECT u.MANDT, u.UNAME, u.AGR_NAME
FROM "SAPHANADB"."AGR_1251" a
JOIN "SAPHANADB"."AGR_USERS" u
ON u.MANDT = a.MANDT AND u.AGR_NAME = a.AGR_NAME
WHERE a.MANDT = '100'
AND a.OBJECT = 'S_TCODE'
AND a.FIELD = 'TCD'
AND a.DELETED = ' '
AND ( a.LOW = 'SE16' OR a.LOW = '*' )
) x
JOIN "SAPHANADB"."USR02" s
ON s.MANDT = x.MANDT AND s.BNAME = x.UNAME
ORDER BY x.UNAME;This is a first pass analysis of role content only. It does not expand ranges in the HIGH column, wildcard patterns such as 'SE*', additional field combinations on the same object, profiles assigned directly (table UST04), reference users, or the effect of organizational level fields. Treat a hit as a lead for a full SUIM or GRC analysis. Run read only queries on a copy or with approval, since these tables are large in big landscapes.
Role analysis on your own data
Optional: ask how we could run access analysis privately across your SAP systems.
Optional. The tool and every export work without this. No spam.
How to use the queries
Enter your ABAP schema, client, authorization object, field and the value you are looking for. Run the first query for users who have the role directly, the second for composite roles, and the third to add the user type and lock status from USR02. Export the result and attach it to your review. In SAP itself, SUIM report 'Users by Complex Selection Criteria' gives a similar answer; SQL is useful when you want to join with other data or analyse offline.
- Use the schema name that holds ABAP tables in your database
- Run per client
- Join the result with your HR or identity data after export
The tables behind the query
AGR_1251 stores the authorization values of a role, with the object, field, low and high value and a deleted flag. AGR_USERS stores the assignment of roles to users with validity dates. AGR_AGRS links composite roles to their single roles. USR02 holds the user master data including user type and lock flag. Joining these four answers most role based access questions; direct profile assignments live in UST04 and are not covered here.
What the query cannot see
Authorization checks are evaluated with several fields at once, so a value in one field of an object does not by itself grant the capability. A role might hold S_TCODE with SE16 but lack the S_TABU_DIS authorization needed to display data. Wildcards and ranges also matter. Use these results to shortlist, then confirm with a trace or a GRC rule set before concluding that a user can perform an action.
- Check wildcard values such as SE* separately
- Check ranges in the HIGH column
- Check profile assignments in UST04 and reference users
Frequently Asked Questions
Which table links users to roles in SAP?
AGR_USERS holds the role to user assignment with validity dates. Composite roles are linked to single roles through AGR_AGRS.
Does the query work on non HANA databases?
The table names are the same on any database, but the date function and schema quoting differ. Adjust the CURRENT_DATE expression and the schema prefix for your database.
Why does a user appear who cannot actually run the transaction?
The query only checks one field value. The real check combines several objects and fields, so an authorization trace or a full GRC analysis is needed to confirm actual capability.
How do I include users with directly assigned profiles?
Directly assigned profiles are stored in UST04. You would need to resolve profile contents with the profile tables, which is more involved. Most organizations require roles, so first check whether any user has direct profiles.
If you need access analysis across many SAP systems without sending role data to a cloud service, we can build it on your own infrastructure.
Related Tools
SAP Inactive Users ABAP Report Generator
Fill in the inactivity threshold and user type to get a ready to paste ABAP report that lists dormant users from USR02.
SAPSAP User Types and Default Users Reference
Look up what each SAP user type allows and how to secure the standard delivered users and clients during an audit or hardening review.
SAPSAP Firefighter Emergency Access Request Template
A fill-in emergency access request and post-use review form for SAP firefighter or privileged IDs. Exports to PDF or Word for your audit file.
SAPSAP Basis Transaction Codes Cheat Sheet
A searchable reference of the SAP Basis, security and system administration transaction codes you use every week, grouped by area.
More SAP tools
See allNew to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.
Keep exploring
Free tools
- SAP Business One AR Aging SQL Query Generator (SQL Server and HANA)Generate a customer receivables aging query for SAP Business One Query Manager, with your own bucket days and aging basis, in SQL Server and HANA syntax.
- SAP HANA Largest Tables SQL Query GeneratorGenerates SAP HANA SQL for the biggest tables and the usual archiving suspects, to size and reduce data before migration.
- SAP HANA SQL Error Codes ReferenceSearchable table of common SAP HANA 2.0 SQL error codes with the error text, typical cause, the view or trace to check first and the fix.
ERP fixes and how-tos
- SAP: 'This Function Is Not Possible' - Causes and How to DiagnoseSAP shows 'This function is not possible' when status, authorization, posting rules or the object state block an action. Learn how to find the real cause.
- SAP Business One Query: Released Production Orders with Component ShortagesReady-to-run SAP Business One queries on OWOR, WOR1 and OITW to list released production orders with missing components, for SQL Server and HANA.
- Private AI for SAP Business One: Service Layer, a read replica and a local modelAdd a private AI assistant to SAP Business One: Service Layer reads, SQL Server or HANA replica, document index, local LLM, permissions and approvals.
AI on your ERP
- AI on SAP HANA Data: HANA Cloud Vector Engine, PAL, or a Private RAG Beside HANAAI on SAP HANA data compared: HANA Cloud vector engine, PAL and private RAG beside HANA, with licensing limits, curated views and when each option fits.
- SAP AI Security: How to Let an LLM Read SAP Data Without Breaking Your Authorisation ModelSAP AI security: technical users, PFCG roles, S_RFC and OData scope, prompt injection from long texts, audit logging and SoD when AI reads SAP data.