Semiconductor Process Change Notification (PCN) Template
When a chip supplier changes a wafer process, assembly site or bond material, customers are owed a written notification. This template structures a PCN so that the change, impact, qualification and timeline are clear and complete.
Fill in
Semiconductor Process Change Notification (PCN) Template
Product / Process Change Notification
PCN number: PCN-2026-0142 Issued by: Acme Semiconductor Ltd Issue date: 2026-10-19 Change type: Assembly material (leadframe, mold compound, wire)
Affected Products
MCU-A2-QFN32, MCU-A2-QFN48, MCU-A3-QFN32 (all temperature grades)
Description of Change
Gold bond wire replaced with palladium-coated copper wire (25 um) on QFN assembly line at OSAT site B. No change to die, package outline or datasheet parameters.
Reason for change: Cost and supply continuity of bonding material.
Impact Assessment
| Area | Impact (Yes / No) | Comment |
|---|---|---|
| Form, fit and function | ||
| Datasheet parameters | ||
| Reliability | ||
| Package marking or traceability | ||
| Moisture sensitivity level | ||
| Soldering or board assembly profile |
Qualification Plan
Qualification per AEC-Q100 change guidelines: preconditioning MSL3, HAST, temperature cycling, HTSL, wire bond pull and shear, and electrical characterization on three lots.
Timeline
| Milestone | Date |
|---|---|
| Samples available | 2026-12-01 |
| Qualification report available | |
| Customer acknowledgment requested by | |
| First shipment of changed product | 2027-02-01 |
Contact and Acknowledgment
Questions: Product quality, pcn@example.com
If no objection is received within the notification period, the change is considered accepted.
Approvals
JEDEC J-STD-046 and customer agreements define notification periods and required content. Notification periods and the acceptance wording are commercial and legal terms, so confirm them against your quality agreements. This template is a starting point, not legal advice.
Track change notices against your ERP
Optional: discuss linking PCN history to part numbers and customers in your ERP.
Optional. The tool and every export work without this. No spam.
How to use the PCN template
Pick the change type and list every affected part number, including temperature grades and package variants. Describe the change in physical terms: what material, process or location changes and what does not. State the reason in plain language, then summarize the qualification plan with the tests and number of lots. Complete the impact table by hand or leave it for engineering to finish. Add the sample and first shipment dates, export to PDF or Word and send to customers. Keep the acknowledgment line so you can track responses.
- List every affected orderable part number
- Say what does not change as well
- Put real dates, not 'TBD'
- Track customer acknowledgments
What customers look for
Customer quality engineers read a PCN for three things: does it change form, fit or function, what evidence supports the claim that it does not, and when do they need to act. Automotive customers working under IATF 16949 and AEC-Q100 expect a change to be evaluated against the qualification guidelines and may require sample parts or a PPAP resubmission. Industrial and military customers often have contractual rights to approve changes. A clear, specific PCN shortens their review and reduces back-and-forth questions.
Qualification evidence
The qualification plan should map to the risk of the change. A bond wire material change tests wire bond reliability with HAST, temperature cycling and high temperature storage, along with bond pull and shear. A fab site transfer adds electrical characterization across lots, process matching data and reliability tests. A mold compound change emphasizes moisture sensitivity, preconditioning and delamination checks. State the lots, sample sizes and standards referenced, and commit to delivering the report by a date so customers can plan.
Common mistakes
The most common errors are vague descriptions such as 'minor process improvement', missing part numbers, and dates that slip without a revised notice. Another is bundling several unrelated changes into one PCN so customers cannot assess each one. Failing to update traceability or marking information also causes problems on the customer's receiving line. If dates move, issue an update referencing the original PCN number rather than sending a new unrelated notice.
Frequently Asked Questions
How much notice must be given for a PCN?
It depends on the customer agreement and the standard referenced. JEDEC J-STD-046 suggests a notification period of 90 days for many change types, but contracts can require more. Always check your agreements.
Does every change need a PCN?
Not every change, but anything that could affect form, fit, function, quality or reliability generally does. Many suppliers define a change classification matrix. When unsure, treat the change as notifiable.
What is the difference between a PCN and a PDN?
A PCN announces a change to a product or process. A PDN, or product discontinuance notification, announces end of life. Some companies use PCN for both, so follow your own naming and the terms in customer contracts.
Can I attach the qualification report?
Yes, and customers often prefer it. If the report is not ready when the PCN is issued, state the planned availability date in the timeline and send it as soon as it is approved.
If PCN tracking and customer-impact lookup need to be searched across your ERP and quality records, Netray can set that up privately.
Related Tools
Wire Bond Pull and Shear Test Report Template
A bond pull and ball shear test report for wire bond process monitoring, with sample table, failure mode codes and approval lines.
Quality & InspectionSemiconductor Lot Hold and Release Form Template
A fill-in lot hold and release record for wafer fabs and assembly and test houses, covering hold reason, affected wafers, disposition and sign-off.
Quality & InspectionHTOL Burn-In FIT and Acceleration Factor Calculator
Compute the Arrhenius acceleration factor, equivalent field hours and the upper-bound FIT rate for a zero-failure high temperature operating life test.
Quality & InspectionWafer Excursion OCAP Response Template
An out of control action plan record for SPC violations and yield excursions in a wafer fab, covering trigger, containment, root cause and corrective action.
More Compliance & Contracts tools
See all- SAP SoD Residual Risk Score Calculator
- SAP Firefighter ID Usage Review Log
- IBM i (AS/400) User Profile Access Review Worksheet
- SyteLine Security and User Access Audit Checklist
- Infor XA (MAPICS) User Access Review Worksheet
- China ERP Data Security and Compliance Assessment
- ERP Vendor Data Processing Agreement Outline
- GDPR ERP Data Migration Checklist
- EU Machinery Regulation 2023/1230 Readiness Checklist
Keep exploring
Free tools
- PCN Product Change Notification Response TemplateDocument your review of a manufacturer PCN or EOL notice: affected parts, impact, decision, actions and approvals, ready to export.
- Semiconductor Process Tool Qualification ChecklistChecklist covering facilities hookup, safety, hardware acceptance, process qualification and production release for a fab or OSAT tool.
- Semiconductor Lot Hold and Release Form TemplateA fill-in lot hold and release record for wafer fabs and assembly and test houses, covering hold reason, affected wafers, disposition and sign-off.
Guides
- ERP for Semiconductor Equipment Suppliers and Subsystem BuildersERP for semiconductor equipment suppliers: SEMI standards, ultra-clean builds, long-lead sourcing, engineering change velocity and outsourced module control.
- AI for Component Shortages and Obsolescence in EMSUse AI to handle component shortages, PCNs, EOL notices and last time buys in EMS: match alerts to open jobs and BOMs, with engineers approving every change.