Compliance & ContractsFree templatePDF, Excel, Word exportSheet Metal Fabrication

Sheet Metal Quote Terms and Assumptions Template

A good quote makes assumptions visible so the price stays valid. This template pulls part, material, tolerance, finish, lead time and exclusions onto one page you can export as a PDF or Word file.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Sheet Metal Quote Terms and Assumptions Template

Quotation Q-26-1048

From: Midwest Precision Fabrication To: Harlan Controls Inc. Date: 2026-10-20 Valid for 30 days from the quote date.

Part and specification

ItemDetail
Part number and revisionENC-5010 Rev C
MaterialCold rolled steel, 14 gauge (0.075 in), mill certs not included
Tolerances+/- 0.010 in linear, +/- 1 degree bend
FinishPowder coat, RAL 7035
Lead time15 working days, ARO
One-time chargesNo charge

Price breaks

10 pcs: $52.40 each 50 pcs: $41.75 each 250 pcs: $36.10 each

Prices are in US dollars, FOB our dock unless stated, and exclude sales tax.

Assumptions and exclusions

Pricing assumes supplied drawings and STEP file are complete and current. Price assumes release in full quantity with a single delivery. Material surcharges may apply if mill prices change by more than 5 percent before order.

Not included unless stated: first article inspection report, material and process certifications, packaging beyond standard, expedited freight, design changes after release.

Terms

Payment: Net 30 on approved credit Changes to drawing, quantity or revision after quote acceptance may change price and lead time. Parts are inspected to the stated tolerance standard; any special inspection requirements must be quoted before order.

Acceptance

Quoted by / Date
Customer authorized signatory / Date

A starting point, not legal advice. Have counsel review terms and conditions for your state and customer type. Remove or amend any line that does not match your actual practice. Adjust for government or flow-down contracts.

Generate quotes from ERP data

Optional review of how quote documents could be assembled from ERP items, routings and customer terms.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the template

Fill in your company, the customer, the quote number and the part revision. Describe the material and thickness exactly as quoted and choose a tolerance standard and finish. Paste your quantity price breaks, lead time and any one-time charges. The assumptions field is the most important: record drawing status, delivery pattern, material surcharge triggers and anything excluded. Export to Word to add your logo, or to PDF to send directly.

  • Always include the drawing revision number.
  • State validity so material price swings do not bind you.
  • List exclusions such as certifications and first article reports.

Why these fields matter

Disputes over sheet metal work usually come from tolerances, finish, material substitution and partial deliveries. Naming a tolerance standard avoids debates over bend angle and linear tolerances; ISO 2768 medium and general tolerance blocks on drawings are common references, but only use what the customer drawing calls out. Naming the finish by specification or color code avoids rework. A stated validity period matters because carbon steel and aluminum sheet prices can move between quote and order.

How to read and adapt it

Treat the example as a pattern, not as law. For aerospace or defense work, add flow-down clauses, special process approvals and certification requirements. For long-run production, add a blanket order structure and price adjustment clause. Keep the exclusions list in step with what you actually include on invoices.

Common mistakes

Quoting with no revision on the part number, leaving out lead-time start conditions, and omitting a material surcharge clause are the most common. Another is listing price breaks without noting whether tooling or programming is amortized.

Frequently Asked Questions

How long should a fabrication quote be valid?

Fifteen to thirty days is common for steel and aluminum jobs. Shorten the period in volatile material markets or add a material surcharge clause. State the date and the period clearly on the quote.

Should quotes list tolerances?

Yes. State the tolerance standard or the specific values you priced to. Tight bend angles, flatness and hole position tolerances can change cost significantly, and the customer needs to know what is included.

What should be in the assumptions section?

Drawing and revision status, quantity and release pattern, material source and grade, finish specification, inspection level, delivery terms, and any item excluded such as certifications, packaging or design changes.

Can I use this for government contracts?

Use it as a basis only. Government and prime contractor work usually requires flow-down clauses, certifications and specific representation language. Have your contracts or legal adviser review before use.

If your quotes are produced from ERP data, Netray can help generate this document automatically with the right assumptions pulled in. Ask for an expert review of your quote-to-order flow.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP