Electronics ManufacturingFree referencePDF, Excel, Word exportElectronics Manufacturing

Solder Alloy Melting Point Reference (Lead-Free and Leaded)

Solder alloy decides your reflow peak, which components you can use, and which RoHS or exemption rules apply. This reference lists common alloys with composition, solidus and liquidus so buyers and process engineers can compare them quickly.

Download:
AlloyComposition (by weight)Solidus (deg C)Liquidus (deg C)Lead contentTypical use
Sn63Pb37
63% tin, 37% lead
183
183
Leaded (eutectic)
Hand soldering and exempt leaded assembly
Sn60Pb40
60% tin, 40% lead
183
190
Leaded
General hand and wave soldering in legacy lines
Sn62Pb36Ag2
62% tin, 36% lead, 2% silver
179
179
Leaded (eutectic)
Silver bearing finishes and hybrid parts
SAC305
96.5% tin, 3.0% silver, 0.5% copper
217
220
Lead-free
Most common lead-free reflow and wave alloy
SAC405
95.5% tin, 4.0% silver, 0.5% copper
217
220
Lead-free
Higher silver, used where customers specify it
SAC0307
99.0% tin, 0.3% silver, 0.7% copper
217
228
Lead-free
Lower cost, low silver option
SN100C
99.3% tin, 0.7% copper plus trace nickel
227
227
Lead-free
Wave soldering and selective soldering
Sn99.3Cu0.7
99.3% tin, 0.7% copper
227
227
Lead-free
Wave soldering baths
Sn96.5Ag3.5
96.5% tin, 3.5% silver
221
221
Lead-free
Eutectic tin silver, thermal fatigue sensitive joints
Sn95Sb5
95% tin, 5% antimony
235
240
Lead-free
Higher temperature joints, step soldering
Sn42Bi58
42% tin, 58% bismuth
138
138
Lead-free
Low temperature reflow for heat sensitive parts
Sn91Zn9
91% tin, 9% zinc
198
198
Lead-free
Niche; zinc oxidizes readily in air
In52Sn48
52% indium, 48% tin
118
118
Lead-free
Very low temperature, cryogenic and optical assembly
Pb92.5Sn5Ag2.5
92.5% lead, 5% tin, 2.5% silver
287
296
High lead
High temperature die attach in exempt applications
Au80Sn20
80% gold, 20% tin
280
280
Lead-free
Hermetic packages and laser diode attach

Values are nominal and vary slightly by source and impurity content. Peak reflow temperature is normally set 20 to 40 deg C above liquidus, within the component's maximum body temperature rating. Use the solder paste supplier's profile guidance for production settings.

Material lot traceability review

Optional: we look at how paste, wire and component lots are traced in your ERP and suggest a tighter structure.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the alloy reference

Search an alloy name such as SAC305 and read its melting range. Solidus is where melting begins and liquidus is where the alloy is fully liquid. Use the numbers to sanity check a paste or wire order, to compare lead-free against leaded processes, or to understand why a low temperature alloy was chosen for a heat sensitive part.

  • Search by alloy name or by temperature use
  • Compare solidus and liquidus, not just one number
  • Export the table for supplier specification files

How the numbers relate to your profile

Eutectic alloys such as Sn63Pb37 and Sn99.3Cu0.7 melt at a single temperature, so they flow and solidify cleanly. Non-eutectic alloys have a pasty range between solidus and liquidus. Reflow peak temperature is typically set well above liquidus so that all joints wet, while staying under the lowest maximum body temperature of any component on the board. Lead-free assemblies have a narrower window than leaded ones.

Sourcing and compliance notes

The alloy on a paste, bar or wire label should match the process document and the customer's lead-free requirement. Mixing leaded component finishes with lead-free solder, or the reverse, causes reliability concerns, and some defense and aerospace programs require leaded processes under specific controls. Record the alloy in your ERP item master as an attribute, and keep certificates of analysis with the lot for traceability.

Common mistakes

People often assume SAC305 and SAC405 have very different melting points when both start melting near 217 deg C. Another mistake is using the liquidus as the reflow peak, which leaves no margin for wetting. A third is ordering a low temperature SnBi paste for a board that later sees high service temperatures, where bismuth alloys may creep or embrittle.

Frequently Asked Questions

What is the melting point of SAC305?

SAC305 begins to melt near 217 deg C and is fully liquid around 220 deg C. Reflow peak temperatures are normally set 20 to 40 deg C above that, within the limits of the components.

What is the difference between solidus and liquidus?

Solidus is the temperature at which melting begins and liquidus is the temperature at which the alloy is fully liquid. Between them the alloy is partly solid, and joints should not move in that range.

Why is Sn63Pb37 popular for hand soldering?

It is eutectic, so it melts and freezes at one temperature, and it wets well at a lower temperature than lead-free alloys. Its use is restricted under RoHS except where an exemption applies.

Can I mix lead-free paste with leaded components?

It can be done but creates reliability and process risks, because the joint ends up with mixed metallurgy. Follow your customer's requirements and get process engineering approval.

If solder paste lots and expiry are tracked in spreadsheets, we can connect your ERP and shop floor data to a private agent that answers where each lot was used.