On-Prem AIFree calculatorPDF, Excel, Word exportSQL Server Reporting Services

SSRS Estate AI Assistant Sizing and Value Calculator

Report assistants are light on index size but can be heavy on tokens, because summarising rendered data fills the prompt. This calculator shows how users, question volume and result size drive GPUs and value.

Your numbers

users
20 %
questions
tokens

Summarising CSV output adds many prompt tokens. Cap rows returned to the model.

items
pages

Dataset queries, parameter prompts and descriptions as page equivalents.

min

Finding a report and filling parameters often takes longer than asking.

per hour
per GPU
tokens/s
one-time

Your results

GPUs needed (before redundancy)
1
Monthly net value after GPU cost
$39,267
Daily active users
80
Questions per day
400
Tokens per day
2,000,000
Peak concurrent requests
0.4444
Metadata index size (MB)
36.864
Two chunks per page-equivalent, 4096 bytes per vector, 50% overhead, in megabytes.
Hours saved per month
1,027 hrs
Monthly value of time saved
$41,067
Simple payback
1 months

Planning estimate. Measure real throughput, cap data returned to the model and confirm time savings in a pilot.

Free, optional. Reopen it on any device.
Save results:

GPUs needed vs tokens per question

Sweeps Prompt plus answer tokens per question from 500 to 20000, holding your other inputs fixed.

Get a sizing review for your SSRS estate

Optional: share your inputs and we will check GPU count, result-size limits and rollout assumptions.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter report consumers and the share who ask a question on a given day. A report assistant has lower usage than a general chat, so start low. Raise tokens per question if you plan to summarise large CSV output, and cap rows in the design. Minutes saved is often higher than for lookups because it includes finding the report and setting parameters.

  • Start with 10 to 20% daily use
  • Cap rows sent to the model
  • Measure throughput on your card
  • Use the chart to test result sizes

The formulas

Questions per day equal active users times questions each. Peak tokens per second equal 20% of daily questions times tokens per question divided by 3600. GPUs equal that divided by throughput per GPU, rounded up, minimum one. Index size uses two chunks per page-equivalent at 4096 bytes per vector plus 50% overhead, shown in megabytes. Value uses 22 working days.

Reading the result

Most SSRS estates need one GPU; the chart shows how result size can push that higher. If the case depends on large summaries, redesign to pre-aggregate or sample instead of buying more hardware. If net value is low, a better folder structure and search may already solve discovery.

Frequently Asked Questions

Why is the index measured in megabytes?

A report catalog is small. Even thousands of reports produce a modest metadata index, so megabytes are the more useful unit here.

Why does token count matter so much?

Summarising rendered output puts the data into the prompt. Large tables raise tokens quickly, so limit rows or aggregate before sending to the model.

Can I model several departments?

Run it once per department, or sum users and questions for a single estimate. Usage patterns differ, so separate runs show where value concentrates.

Does it include report server load?

No. Running reports on behalf of users adds load to the report server and its data sources, which you should test separately.

If you want these inputs checked against your SSRS estate, Netray can review them with your BI and IT teams.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides