Surface Finish Ra to RMS Converter
Older drawings call out RMS, newer ones call out Ra, and your profilometer may report either. This converter handles the conversion in both unit systems and also estimates what finish a turning insert should leave at a given feed.
Your numbers
Enter the Ra callout from the drawing in the unit chosen below.
Used only for the theoretical finish estimate.
For example 1/32 inch is 0.031 and 1/64 inch is 0.016.
Your results
The 1.11 factor assumes a sinusoidal profile; real machined surfaces differ. The turned Ra estimate is geometric only and ignores tool wear, vibration and built-up edge. Measure with a profilometer for acceptance.
Link finish callouts to inspection results
Optional: we can look at how drawing requirements and inspection data flow through your ERP and quality system.
Optional. The tool and every export work without this. No spam.
How to use the converter
Enter the roughness value, choose microinches or micrometers, and read the equivalent Ra and RMS in both units. To check whether a turning setup can reach a callout, enter the feed per revolution and the insert nose radius as well; the tool returns the theoretical Ra the geometry produces. If the theoretical value is already near or above the drawing requirement, lower the feed or move to a larger nose radius before looking at anything else.
Ra, RMS and the conversion factor
Ra is the arithmetic mean of the absolute profile deviations from the mean line. RMS, now called Rq in ISO terms, is the root mean square of the same deviations. For a sine wave profile Rq is about 1.11 times Ra, which is the factor used widely in shop practice. One micrometer equals 39.37 microinches, so 0.8 um Ra is about 32 uin Ra. Treat the factor as a rule of thumb: random or sharply peaked surfaces give different ratios.
- RMS (uin) = 1.11 x Ra (uin)
- uin = um x 39.3701
- ISO uses Ra and Rq; older ASA drawings used RMS
Theoretical finish from feed and nose radius
For a round-nosed turning tool the feed marks form scallops, and Ra is approximately feed squared divided by 32 times the nose radius. At 0.008 in/rev and a 1/32 inch radius that is about 65 uin. Halving the feed to 0.004 drops it to about 16 uin, because feed is squared. The formula gives the best case; real surfaces are rougher because of tool wear, vibration, material tearing and a poor edge, so aim a notch below the callout.
Common mistakes
Do not assume Ra and RMS are interchangeable on an inspection report; a 32 RMS callout is about 29 Ra. Also avoid comparing readings taken with different cutoff lengths or filters, since they change the result. For milling, finish depends on stepover, runout and cutter geometry rather than the turning formula, and a ball nose scallop height needs its own calculation. Always state the unit when you write a callout on a drawing.
Frequently Asked Questions
How do I convert Ra to RMS?
Multiply Ra by about 1.11 to get RMS (Rq) for a typical sinusoidal profile. For example 32 uin Ra is roughly 35.5 uin RMS. The factor is a rule of thumb and varies with the actual surface profile.
How many microinches are in a micrometer?
One micrometer equals about 39.37 microinches. So 1.6 um Ra is about 63 uin Ra, and 0.8 um is about 32 uin. The converter does this automatically in both directions.
What does a 32 Ra finish mean?
It means an average roughness of 32 microinches, about 0.8 micrometers. It is a common machined finish for general precision surfaces and is typically reachable by finish turning or milling with a sharp tool and a modest feed.
Is the theoretical turned Ra reliable?
It is a good lower bound for a sharp tool in a stable setup, because it only considers feed marks. Vibration, wear, soft or gummy materials and coolant conditions raise the real Ra, sometimes by a factor of two or more.
If finish requirements and inspection results are scattered across drawings, spreadsheets and your ERP quality module, Netray can help bring them together for review.
Related Tools
CNC Speeds and Feeds Calculator
Turn a surface speed and chip load into spindle RPM and table feed for any end mill, capped at your machine's maximum RPM.
Discrete ManufacturingTool Life Taylor Equation Calculator
Use the Taylor equation V x T^n = C to predict tool life at a new cutting speed or find the speed that gives a target tool life.
Discrete ManufacturingCNC Chip Load Reference Worksheet
A printable chip load starting-point chart for carbide end mills with a fill-in record for the cutting data you finally prove out.
Discrete ManufacturingCNC G-Code Reference Table
A searchable table of common G-codes for milling and turning with their function, group and practical notes.
More Discrete Manufacturing tools
See allKeep exploring
Free tools
- Turning Surface Finish Calculator (Ra, Nose Radius and Feed)Theoretical Ra and peak-to-valley height for a turned surface, plus the maximum feed that still meets your drawing's finish callout.
- Surface Finish Ra to N Grade Conversion ReferenceSearchable chart converting ISO 1302 roughness N grades to Ra in micrometres and microinches, with the machining processes that usually achieve each grade.
- CNC Turning Surface Roughness and Feed CalculatorConnect feed per revolution and insert nose radius to the theoretical surface roughness, and pick the fastest feed that still meets the drawing.