Job Shop RFQ Intake Form Template
Most bad quotes start with a thin RFQ: a drawing with no revision, quantities that change on the phone, or a cert requirement nobody wrote down. This form captures the same fields every time so the estimator can price the job instead of chasing the buyer.
Fill in
Job Shop RFQ Intake Form Template
Request for Quote Intake: Lakeside Machine Works
RFQ: RFQ-26-0418 Received: 2026-10-19 Customer: Northfield Hydraulics Buyer contact: J. Alvarez, buyer, 555-0142 Quote due by: 2026-10-23
Part and Quantity
Part number and revision: NH-20417 Rev C Quantities: 25, 100, 250 pieces Material and form: 6061-T6 aluminum, 2.5 in round bar Tightest tolerance: +/- 0.0005 in on bore diameter Finish and secondary operations: Clear anodize Type II, deburr all edges
Quality and Delivery
Certifications: Material cert and C of C Delivery request: First article in 4 weeks, production in 7 weeks
Notes: Customer supplies drawing as PDF and STEP. Open to alternate material if lead time improves.
Intake Checks
| Item | Received | Missing | Action |
|---|---|---|---|
| Drawing at current revision | |||
| 3D model or STEP file | |||
| Specifications and flow-downs | |||
| Quantity breaks and annual usage | |||
| Customer-supplied material or tooling |
Routing
A starting point you can adapt to your own quoting procedure. Keep the exported file with the quote record in your ERP or document folder.
Automate RFQ intake into your ERP
Optional: talk to us about reading RFQ emails and drawings into your quoting screens with human review.
Optional. The tool and every export work without this. No spam.
How to use the form
Fill the form the moment an RFQ arrives, whether it came by email, a portal or a phone call. Paste the customer's part number, revision and quantity breaks exactly as written. Use the Intake Checks table to mark what you received and what is missing, then email the buyer for the gaps the same day. Export to PDF or Word and attach it to the quote in your ERP so the estimator, the programmer and the shipping clerk all read from one record.
What each section is for
The part block holds what drives cost: material form, tolerance and finish. The quality block holds what drives risk: certs, flow-down clauses and traceability. Delivery is separate because a first article date and a production date price very differently on a small shop with a fixed spindle count.
- Revision letter prevents quoting an obsolete drawing
- Quantity breaks let you spread setup across lots
- Cert level changes inspection and paperwork time
- Customer-supplied material changes your liability and margin
Where it fits in a job shop ERP
JobBOSS, E2 Shop System, Global Shop Solutions and ProShop each have a quote or estimate module, and each expects the same inputs: part, revision, quantity, material, routing and markup. This form is the step before that data entry. It also gives you a clean place to record why you declined a job, which most ERPs do not capture well.
Common mistakes
Quoting from an emailed screenshot, skipping the revision, and ignoring a note buried on drawing sheet two are the usual causes of a loss on a job. Another is accepting a verbal quantity change without updating the form. Treat the form as the record: if the buyer changes the quantity, change it here and note the date.
Frequently Asked Questions
Is this form specific to one ERP?
No. It captures the information every job shop ERP estimate screen asks for, so you can key it into JobBOSS, E2 Shop System, Global Shop Solutions, ProShop or a spreadsheet. The fields are generic and you can edit the exported file.
Does anything get sent to a server?
No. The form runs in your browser and the export is generated locally. Your customer names and part numbers stay on your machine unless you choose to share the file.
Should I fill this for every RFQ?
Fill it for any RFQ that will take more than a few minutes to price. For repeat parts with an existing routing, a short email confirmation may be enough, but the revision and quantity should still be recorded.
Can I add my own fields?
Export to Word and add rows for your own needs, such as ITAR status, customer approved source lists or hardness testing. The template is a starting point, not a controlled quality procedure.
If RFQ data sits in email threads and spreadsheets, Netray can help pull it into your job shop ERP estimate screens with a human approval step.
Related Tools
Job Shop Machine Hour Rate Worksheet
Editable worksheet that converts machine price, life, hours, power draw and maintenance into a cost per run hour for each machine.
Costing & FinanceJob Shop Setup Cost Per Piece Calculator
See how setup hours, run time, material and margin combine into a per-piece cost and price, and how it falls as the lot size grows.
Supply Chain & InventoryOutside Processing Purchase Order Template for Job Shops
A purchase order template for sending parts out for heat treat, plating, anodize, grinding or paint, with process spec, certs and return instructions.
ERP Migration & SelectionJob Shop ERP Vendor Demo Script Template
A scripted demo brief you send to ERP vendors so each shows the same real scenarios from quote to invoice, scored by your team.
More Discrete Manufacturing tools
See allKeep exploring
Free tools
- RFQ Intake Triage Scoring WorksheetLog every inbound RFQ, score it on fit, customer, completeness and margin, and see which ones deserve estimating hours first.
- JobBOSS to E2 Shop System Migration ChecklistA practical checklist for moving a small shop from JobBOSS to E2 Shop System, from data audit through cutover and first month close. Works in reverse too.
- Job Costing Worksheet for Global Shop Solutions UsersCompare estimated and actual labor and material for each job and see the cost variance and variance percent. Good for monthly job reviews and quote feedback.
ERP fixes and how-tos
- How to Create a Quote in E2 Shop SystemHow to build a quote in E2 Shop System, from header setup through routing, material, and outside processing, to converting an accepted quote into a job.
- How to Add a Private AI Layer to Global Shop Solutions On-PremHow to add a private on-prem AI assistant to Global Shop Solutions ERP: read-only data access, scheduling data, security mapping, GPU sizing and phased rollout.
- How to Add a Private AI Layer to E2 Shop System On-PremHow to add a private on-prem AI assistant to E2 Shop System: database views, quote and job data, document retrieval, role scope, sizing and phased rollout.
Guides
- Job Shop ERP Software Comparison: JobBOSS, E2 Shop System, ProShop and Global ShopJob shop ERP software compared for CNC machine shops: JobBOSS2, E2 Shop System, ProShop, Global Shop Solutions and Epicor Kinetic, and the questions to ask.
- ERP for Aerospace Build-to-Print Machine Shops: What to RequireWhat an AS9100 build-to-print machine shop needs from ERP: revision control, traveler, lot traceability, outside processing, FAI and certs.
- How to Reduce Quote Turnaround Time in a Machine ShopHow machine shops cut quote turnaround: where the delay hides, which steps to standardize, what to automate and what the estimator must own.
AI on your ERP
- AI for Global Shop Solutions, Built for How Job Shops Actually RunAdd AI to Global Shop Solutions without sending your quoting, scheduling, and job cost data outside your shop. Private, on-prem AI for GSS job shops.
- AI for Global Shop Solutions schedulingHow AI reads Global Shop Solutions work orders, routings, and finite schedule data to explain late jobs and test rush orders, read-only and private.
Integrations
- How to automate email for ECI E2 Shop SystemTurn inbound POs, RFQs and vendor confirmations in shared inboxes into reviewed E2 Shop System transactions, with matching rules, confidence scores and approvals.
- How to add AI agents to Global Shop SolutionsHow to add AI agents to Global Shop Solutions: a read-first tool layer over its data and APIs, approval before any write, and on-prem model options for job shops.
Software
- Global Shop SolutionsWhat Global Shop Solutions ERP is, how its estimating, scheduling and shop floor modules serve job shops, and which ERP alternatives to compare.
- ECI E2 Shop SystemIndependent guide to E2 Shop System, the ECI shop management and manufacturing software for job shops: modules, integrations, strengths, limits, alternatives and AI use cases.